Definitive Contract 697DCK22C00297
- Not listed
- The Department of Transportation Federal Aviation Administration awarded a $110,000.00 firm-fixed-price definitive contract to Acro Construction, LLC (doing business as Acro) to replace three 12.5-ton heating, ventilation, and air conditioning (HVAC) units at the Lubbock, Texas ASR-9 facility. This contract was set aside for small businesses and has a completion date of November 19, 2021. Acro Construction is a veteran-owned small business that specializes in HVAC services for federal...
- This is a $463,565.12 firm-fixed-price definitive contract awarded by the Headquarters of the U.S. Department of (Civilian) to Acro Construction, LLC, a veteran-owned small business based in Lee, New Hampshire. The contract is for the HVAC system replacement project at a facility in Cumberland, Maine, with a period of performance through August 2024. Acro Construction, which provides HVAC installation, maintenance, and replacement services for federal facilities, has previously held over 40...
- The Department of Transportation Federal Aviation Administration awarded a $461,522 firm fixed-price contract to TJ & B Air Conditioning & Electric LLC to replace the HVAC system at the Northeast Air Defense Sector (NEN) Air Route Surveillance Radar (ARSR) facility in Jacksonville, Florida. Per the original solicitation, the contractor will demolish and remove seven existing HVAC units and associated components, and install new mini-split heat pump units totaling 38 tons of cooling...
- The Department of Transportation Federal Aviation Administration awarded a $288,031 firm fixed price contract to Tj&B Air Conditioning And Electric, LLC for replacement and upgrade of the HVAC system at the QVH Air Route Surveillance Radar facility in Riverhead, New York. The solicitation sought proposals to remove two existing HVAC units, install two new units with economizers and controls, upgrade one unit, and complete all associated work by December 2020 at the radar site. Designated...
- Acro Construction, LLC was awarded a $315,206 firm fixed price construction contract by the Department of Transportation Federal Aviation Administration to replace the HVAC system at the Lynchburg Air Traffic Control Tower and Terminal Radar Approach Control Facility in Lynchburg, Virginia. The contract calls for Acro to remove an existing 15-ton packaged rooftop unit and replace it with two 20-ton rooftop units along with associated ductwork, controls, and electrical work. This total small...
- The Department of Transportation Federal Aviation Administration awarded a $1.4 million firm-fixed price contract to Acro Construction, LLC for replacement of the base building HVAC and direct digital control systems at the Wilmington International Airport in Wilmington, North Carolina. The contract is in response to a solicitation seeking proposals to replace the heating, ventilation, and air conditioning system at the Air Traffic Control Tower and surrounding federal building. With a period of...
- The Federal Aviation Administration, Eastern Acquisitions division, awarded a $279,632 definitive contract to Happel & Associates Inc. for HVAC replacement at the QPK Long Range Radar site on June 16, 2025, under a total small business set-aside. The originating solicitation (697DCK-25-R-00183) required removal and disposal of existing wall-mounted VPAC units, two HVAC units, and associated ductwork and controls, followed by installation of a new wall-mounted VPAC, one mini-split system, and...
- The Federal Aviation Administration awarded a $215,807.99 firm fixed price definitive contract to Acro Construction, LLC of Raeford, North Carolina. The contract is for the upgrade of the heating, ventilation, and air conditioning system at the FAY Air Surveillance Radar facility in Raeford, NC, in accordance with the specifications and construction drawings provided in Solicitation 6973GH-20-R-00090. This small business set aside contract supports the FAA's mission by upgrading critical...
- The Department of Transportation Federal Aviation Administration Southwestern Region awarded a Definitive Contract to Royal Air & Electric, Inc., a Minority Owned, Self Certified Small Disadvantaged Business, for the Replacement of a HVAC Unit at the Air Traffic Control Tower (ATCT) Base Building at the Lincoln Municipal Airport in Lincoln, Nebraska. The contract has a Firm Fixed Price of $103,200.00 and a completion date of November 30, 2019. This contract was not set aside for any specific...
- This is a $2,123,685.16 firm-fixed price contract awarded by the Air National Guard to D.R. Holtze Contracting, Inc. for the upgrade of HVAC systems in 9 facilities at the Lincoln Air National Guard Base in Lincoln, Nebraska. The contract has an estimated 6-month delivery schedule and a completion date of May 1, 2021. The contract was awarded on December 21, 2018 and was set aside for small businesses. The contract is the result of a competitive solicitation with a North American Industry...
Acro Construction, LLC was awarded a $403,696.80 firm fixed price definitive contract by the Department of Transportation's Federal Aviation Administration Headquarters to replace the HVAC system at the North Platte Air Route Surveillance Radar site in Wellfleet, Nebraska. The contract was awarded under a competitive solicitation seeking proposals for demolishing the existing HVAC units, installing two new 15-ton packaged HVAC units with associated ductwork and infrastructure, and commissioning the new system at the site. The award was set aside for small businesses under NAICS code 238220 for plumbing, heating, and air conditioning contractors. Work is to be completed between August 2022 and December 2022 to support the Federal Aviation Administration's air traffic control and safety mission.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
HVAC Replacement Project North Platte Air Route Surveillance Radar (ARSR) Site | 697DCK-22-R-00436 | Department of Transportation Federal Aviation Administration Southwestern Region | Solicitation 1/1 | 6/21/22, 5:40 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Change Order | $37.5k | 11/6/23 | |
| Not listed | Not listed | $366.2k | 8/17/22 |