Definitive Contract 191BWC21C0003

Award Date 7/13/21
Potential Completion Date 3/12/24
Potential Value $15M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Nogales, AZ 85621, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
<p>This is a firm fixed-price purchase order awarded by the International Boundary and Water Commission U.S.-Mexico, a civilian federal agency, to Clean Infusion LLC, a small disadvantaged business, to replace and upgrade diffusers in Train 1 at the Nogales International Wastewater Treatment Plant in Rio Rico, Arizona. The contract has a ceiling value of $1,208,054.00 and a completion date of May 5, 2026. The contract was set aside for small businesses.</p>
This is a firm fixed-price purchase order awarded by the International Boundary and Water Commission U.S.-Mexico, a civilian federal agency, to a small business contractor. The contract is valued at $122,180.73 and has a completion date of March 31, 2025. The purpose of the contract is to replace an influent magnetic meter at the Nogales International Wastewater Treatment Plant, resulting in a fully functioning wastewater treatment system. This contract has been set aside for small businesses.
This federal contract award, with the ID W912P919D0009|W912P919F0259, was issued by the U.S. Army Corps of Engineers (USACE) to SAK Construction LLC, a for-profit limited liability company based in St. Louis, Missouri. The contract, valued at $9,960,348.57, is for sewer rehabilitation services and does not have a set-aside designation. SAK Construction LLC specializes in large-scale sewer infrastructure rehabilitation and repair projects, utilizing techniques such as cured-in-place pipe (CIPP)...
The U.S. Army Corps of Engineers awarded a $8,086,163.00 firm fixed price definitive contract to SAK Construction LLC, a for-profit limited liability company based in O'Fallon, Missouri, for the MSD Infrastructure Repair project in St. Louis, Missouri. The contract, which does not have a set-aside designation, requires the rehabilitation of approximately 17,675 linear feet of 6 to 48 inch sewers, 148 manholes, 527 service connections, and other associated repair work utilizing cured-in-place...
This is a $2,249,624.13 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers' St. Louis District to SAK Construction LLC, a for-profit limited liability company based in O'Fallon, Missouri. The contract is for the construction of the Old Mill Creek Sewer Rehabilitation project for the St. Louis Metropolitan Sewer District. This project involves the use of trenchless sewer rehabilitation techniques such as cured-in-place pipe (CIPP) installation and manhole rehabilitation to...
The Department of Agriculture Agricultural Research Service Pacific West Area awarded a $16,705.80 firm fixed price purchase order to Southlands Engineering, L.L.C., a minority-owned, small disadvantaged business, to repair the exterior sewer line at Building 320 located in Tucson, Arizona. This 100% small business set-aside contract, awarded under NAICS code 237110 for construction of water and sewer lines, requires the replacement of approximately 180 linear feet of 4-inch PVC sewer piping and...
<p>This is a firm-fixed-price definitive contract awarded by the U.S. Customs and Border Protection (CBP) agency to T &amp; T Trucking Services LLC, a small disadvantaged business, to replace a septic tank. The contract has a ceiling value of $101,300.00 and a completion date of July 15, 2024. The contract was awarded on May 13, 2024 and was not set aside for any specific business size or socioeconomic category. The place of performance is Sasabe, Arizona.</p>
<p>The International Boundary and Water Commission U.S.-Mexico awarded a $1,620,302.92 Time and Materials purchase order contract to K E &amp; G Construction Inc., a for-profit Subchapter S Corporation, for work to be performed in Nogales, AZ. The contract, which does not have a set-aside designation, was awarded on September 30, 2017 with a completion date of February 7, 2018.</p>
This contract was awarded by the Department of the Interior Bureau of Reclamation to Taylor Engineering, PLLC, a small disadvantaged business (SDB) certified by the SBA 8(a) program, to relocate a 6-inch force main sewer line in Yuma County, Arizona. The $549,777.00 firm-fixed-price contract has a completion date of April 2, 2019 and was set aside for HUBZone small businesses. The contract scope includes installing new 6-inch C900 pipe, connecting it to the existing force main, flushing and...
The U.S. National Park Service Intermountain Region awarded a $19,700 firm-fixed-price contract to USA Construction Co, a small business based in Omaha, Nebraska, to replace approximately 60 feet of exterior sewer lateral line at a National Park Service-owned house in Page, Arizona. The contract was awarded on June 17, 2025, with a performance period from June 16, 2025, to August 15, 2025. This contract was not set aside for any specific business category and was issued under the original...

The International Boundary and Water Commission United States-Mexico awarded SAK Construction LLC a $15.1 million firm fixed price definitive contract to rehabilitate the Nogales Trunkline and International Outfall Interceptor in Nogales, Arizona. The solicitation sought cured-in-place pipe installation, manhole rehabilitation and other repairs to address condition issues across approximately 19,730 linear feet of existing sewer pipelines with an option to rehabilitate an additional 8,634 linear feet. Key aspects of the work include rehabilitation of over 100 manholes and rehabilitation of approximately 46,436 linear feet of reinforced concrete and unreinforced concrete pipe ranging in diameter from 24 to 42 inches. There is no set-aside designation. The period of performance is from July 13, 2021 through March 12, 2024.

Generated 12/29/23, 4:38 PM