Definitive Contract 15BFA024C00000027

Award Date 7/31/24
Potential Completion Date 1/22/25
Potential Value $604K
Contracting Federal Agency
BOP Field Acquisition Office
Ultimate Awardee
Not listed
Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Herlong, CA 96113, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
3
Legislative Mandate
Walsh Healy Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $148,925.00 firm-fixed-price contract awarded by the Federal Bureau of Prisons (FBOP) to Grainger Contracting And Services, LLC, a small business, for the repair of two boilers at the Federal Correctional Institution (FCI) in Herlong, California. The contract involves the removal and replacement of combustion heads, primary orifices, swirlers, and any damaged refractory on the existing boilers. This contract is set aside for small businesses and is part of the FBOP's larger efforts...
This is a $205,000 firm-fixed-price purchase order contract awarded by the Federal Bureau of Prisons (BOP) to NBT Construction And Supply, LLC, a small business and SBA-certified HUBZone firm. The contract is for the replacement of the existing boiler unit in the Chapel building at the Federal Prison Camp (FPC) in Bryan, Texas. The period of performance is 364 calendar days after award, with an expectation that supplies will be received within 120 days. This contract was awarded under a total...
The Department of Justice Bureau of Prisons awarded a $1,050,000 firm fixed price construction contract to Porter Boiler Service Inc. to repair refractory on six boilers at the Federal Correctional Complex in Victorville, California. The solicitation sought bids for refractory repair and optional ultra-low NOx burner assemblies, with a performance period of 295 calendar days. This was a 100 percent small business set-aside awarded under NAICS code 238220 for specialty trade contractors...
This is a firm-fixed-price construction contract awarded by the Federal Bureau of Prisons (FBOP) to Front Range Construction Inc., doing business as M1 Mechanical, for the replacement of three high temperature hot water boilers at the Federal Correctional Complex (FCC) in Florence, Colorado. The contract has a ceiling value of $6,958,459.00 and a completion date of February 28, 2025. Front Range Construction Inc. is a minority-owned, small disadvantaged business certified as an SBA 8(a)...
The Department of Justice (DOJ) Bureau of Prisons awarded a $229,317.00 firm fixed-price purchase order contract to H.C. Davis Boiler Works Inc. to repair Boilers 2 and 3 at the Federal Correctional Institution (FCI) in Otisville, New York. This contract was set aside for small businesses. The work includes removing and replacing corroded boiler tubes, refractory brick, furnace tile, and other parts per the approved Statement of Work (SOW). The contract has a completion date of June 1, 2024.
This firm fixed-price purchase order contract was awarded by the Federal Bureau of Prisons (BOP) to the Herlong Public Utility District (HPUD), a local government-owned utility serving Herlong, California. The $240,000.00 contract is for water service to the Federal Correctional Institution (FCI) Herlong facility from October 2016 through September 2017. HPUD also holds an $8.7 million Indefinite Delivery Contract with FCI Herlong for wastewater services over a 10-year ordering period, as...
This is a $3,587,970.00 firm fixed price definitive contract awarded by the Federal Correctional Institution (FCI) Danbury, which is part of the U.S. Department of Justice Bureau of Prisons, to Blasco Construction Corp, an SBA certified economically disadvantaged women-owned small business (EDWOSB) and 8(a) program participant. The contract is for the replacement of steam boilers at FCI Danbury and has an ultimate completion date of April 13, 2025. The contract was awarded on a sole source...
This firm-fixed-price purchase order was awarded by the Federal Correctional Complex Victorville, a civilian agency, to California Boiler, Inc. for the replacement of two burner assemblies. The contract has a ceiling value of $245,129.70 and a completion date of May 28, 2016. There was no set-aside used for this award. California Boiler, Inc. is a for-profit Subchapter S Corporation that specializes in boiler-related services for various federal agencies, including the Department of Veterans...
The Department of Justice Bureau of Prisons Federal Correctional Institution Herlong awarded a $78,857 firm fixed price purchase order to Bepc, LLC for water heaters. The contract is a total small business set-aside awarded under a solicitation requesting proposals for water heaters at the Herlong, California facility. Bepc will provide water heaters to the Bureau of Prisons from August 11, 2023 through September 30, 2023 for the Federal Correctional Institution Herlong in Johns Creek,...
This contract is for the supply and installation of boiler controls at the United States Penitentiary in Leavenworth, Kansas. The contract was awarded to NBT Construction And Supply, LLC, a small business limited liability company that provides construction, renovation, and facilities services to U.S. federal government agencies. The contract has a firm fixed price of $391,625.00 and was set aside for small business participation. NBT Construction And Supply has been awarded over $5 million...

This is a firm-fixed-price construction contract awarded by the Federal Bureau of Prisons (FBOP) to NBT Construction and Supply, LLC, a limited liability company certified as a HUBZone small business, to re-tube three boilers at the Federal Correctional Institution (FCI) in Herlong, California. The $604,260.00 contract has a performance period of 175 calendar days and is funded through the FBOP's appropriations. The solicitation, which was not set-aside, was for the purchase, removal, and replacement of all existing tubing in the boilers due to extensive hard water build-up. The project must comply with various codes and regulations, and the work must be completed, equipment tested, and accepted by the Contracting Officer's Representative and Contracting Officer.