Definitive Contract 140P5320C0031
- Not listed
- This contract was awarded by the Department of the Interior National Park Service Southeast Region to Estes Bros. Const. Inc., a small disadvantaged business and certified HUBZone firm, to repair and repave the Peaks of Otter Campground in Bedford, VA. The firm fixed price contract has a potential value of $343,662.55 and a completion date of May 1, 2020. The contract was set aside for small businesses. Estes Bros. Const. Inc., doing business as Estes Bros Construction Inc., is an experienced...
- This contract was awarded by the Department of the Interior National Park Service Southeast Region to Estes Bros. Const. Inc., doing business as Estes Bros Construction Inc., a small disadvantaged business and HUBZone certified firm. The $219,868.04 firm-fixed-price contract is for correcting mainline tunnel issues along the Blue Ridge Parkway in North Carolina and Virginia, including replacement of signage, striping, pavement markers, and traffic control. The work was set aside for small...
- This is a Definitive Contract awarded by the Federal Highway Administration (FHWA), a civilian agency, to Estes Bros. Const. Inc., a small disadvantaged business and SBA-certified HUBZone firm, for the rehabilitation and resurfacing of approximately 3 miles of the Blue Ridge Parkway in Virginia. The $3,166,496.70 Firm Fixed Price contract includes tasks such as asphalt pavement milling, full-depth pavement patching, cement stabilization of the existing aggregate base, asphalt concrete pavement...
- This is a $8,609,341.48 federal contract award from the Federal Highway Administration (FHWA), a civilian agency, to Estes Bros. Const. Inc., a small disadvantaged business and SBA-certified HUBZone firm. The contract is for the resurfacing and rehabilitation of approximately 9.1 miles of the Blue Ridge Parkway in Virginia, including pavement milling, patching, reclamation, overlay, drainage repairs, and other related work. The contract is a definitive, firm-fixed price contract with a period of...
- This is a $5,579,545.43 firm-fixed-price definitive contract awarded by the Department of Transportation Federal Highway Administration to Estes Bros. Const. Inc. (doing business as Estes Bros Construction Inc.), a small disadvantaged and HUBZone certified business. The contract is for pavement preservation, resurfacing, drainage, and other infrastructure repair and rehabilitation services on the Blue Ridge Parkway in Asheville, North Carolina. The work is to be completed by October 30, 2019....
- The National Park Service (NPS) awarded a $295,350 definitive, firm-fixed-price contract to East Wind Enterprises, Inc., a small disadvantaged and veteran-owned business, to rehabilitate accessible and non-accessible campground sites at the Otter Creek and Peaks of Otter Campgrounds along the Blue Ridge Parkway in Virginia. The contract, which has a completion date of July 12, 2024, will involve removing existing amenities, demolishing asphalt and concrete, regrading sites, installing new...
- This is a federal contract award from the Federal Highway Administration (FHWA), a civilian agency, to Estes Bros. Const. Inc., a small disadvantaged business and SBA-certified HUBZone firm, for preventative bridge repairs along the Blue Ridge Parkway. The contract, titled "VA NP BLRI BMS FY23(1)," has a firm-fixed price of $794,381.50 and a period of performance through April 25, 2025. The project consists of repointing stone masonry joints, cleaning and coating exposed rebar, and...
- This is a firm fixed-price delivery order awarded by the Federal Highway Administration (FHWA), a civilian agency, to Estes Bros. Const. Inc. for the "PROJECT NP-BLRI PVT PRES FY20" contract. The $3,091,187.96 project consists of pavement preservation treatment (thin-lift asphalt overlay) of overlooks, picnic areas, and parking areas along the Blue Ridge Parkway. The work includes pavement marking installation and other miscellaneous items. This contract was not set aside for any...
- Estes Bros. Construction Inc. was awarded a $7.28 million firm fixed price contract by the Department of the Interior National Park Service Northeast Region to provide various pavement repairs at Shenandoah National Park in Virginia. Under the contract, Estes Bros. will perform work such as milling, overlaying, crack sealing, and minor drainage repairs along Skyline Drive between mile markers 50 and 65.3, as well as the Big Meadows Entrance Road, Loft Mountain Campground Access, Skyland Lodge...
- The Federal Highway Administration awarded a $64.3 million firm fixed-price definitive contract to Estes Bros. Construction Inc., an SBA-certified HUBZone firm headquartered in Jonesville, Virginia, for the design-build rehabilitation of approximately 24 miles of the Blue Ridge Parkway between mileposts 97 and 121 in Bedford, Botetourt, and Roanoke Counties, Virginia. The contract was awarded on September 6, 2023, with an ultimate completion date of July 31, 2028. The scope of work encompasses...
The U.S. Department of the Interior National Park Service Southeast Region awarded a firm-fixed-price definitive contract worth $185,000.00 to Estes Bros. Const. Inc. for the repair and repaving of the Otter Creek Campground road on the Blue Ridge Parkway in Monroe, Virginia. This contract was set aside for small businesses. Estes Bros. Const. Inc. is a small disadvantaged business that has been awarded over 20 prime federal contracts since 2019, primarily for road, bridge, and infrastructure construction, rehabilitation, and repair services across National Parks sites, National Forests, and major roadways. The contract was awarded under a pre-solicitation that was posted on the Federal Business Opportunities (FBO) website, which is the designated source for federal contracting opportunities.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
BLRI-REPAIR REPAVE OTTER CREEK CG ROAD | 140P5320R0022 | Department of the Interior National Park Service Southeast Region | Pre-Solicitation 1/3 | 5/21/20, 1:14 PM | |
BLRI-REPAIR REPAVE OTTER CREEK CG ROAD | 140P5320R0022 | Department of the Interior National Park Service Southeast Region | Award Notice 3/3 | 7/9/20, 4:09 PM | |
BLRI-REPAIR REPAVE OTTER CREEK CG ROAD | 140P5320R0022 | Department of the Interior National Park Service Southeast Region | Solicitation 2/3 | 5/27/20, 4:40 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $185.0k | 7/9/20 |