Definitive Contract 140P1221C0006
- Not listed
- The Department of the Interior National Park Service Intermountain Region awarded a $70,472 firm fixed price delivery order to Acierto LLC. The order is for the Zion-East Well Component Replacement project located in Springdale, Utah. As part of its mission to preserve and protect national parks and monuments, the National Park Service maintains critical water infrastructure to support visitors and operations. Acierto will replace components of the Zion-East Well to ensure a reliable water...
- The Department of the Interior's National Park Service Intermountain Region awarded a Firm Fixed Price Delivery Order contract to Ahmb, LLC, a self-certified small disadvantaged business and joint venture women-owned small business, to provide design services for the design development and construction documents for a new water system at the Kolob Canyon Visitor Center in Zion National Park. The contract, which has a potential value of $186,068.97, was awarded on September 21, 2018, with a...
- The U.S. Department of the Interior National Park Service Intermountain Region awarded a $406,435.86 firm-fixed-price definitive contract to Solid Ground, LLC, a Native Hawaiian Organization-owned limited liability company, to replace the grotto tank-to-lodge waterline and a portion of the water distribution system at Zion National Park in Springdale, Utah. This construction contract is not set aside for any specific program. Solid Ground, LLC is an 8(a) certified small disadvantaged business...
- The Department of the Interior National Park Service Intermountain Region awarded a $999,735 firm fixed price contract to Solid Ground, LLC for the ZION PMIS 245850 & 245854 bundled water system projects. As a 8(a) sole source set aside, the contract supports the agency's mission by delivering critical water infrastructure upgrades across two sites within Zion National Park in Springdale, Utah. Solid Ground will serve as the prime contractor, leveraging its expertise under the contract's...
- This is a firm fixed-price definitive contract awarded by the Intermountain Region of the National Park Service, a civilian agency, to Farah Construction Inc., a minority-owned small disadvantaged business. The contract, valued at $227,304.97, is for the replacement of water systems components at the Zion National Park in Springdale, Utah. The contract was not set aside for any particular small business program. Farah Construction Inc. is the prime contractor and there are no major...
- This is a $1,523,860.59 firm-fixed-price contract awarded by the National Park Service's Pacific West Region to Site Work Solutions, a HUBZone small business, for the replacement of two damaged water storage tanks and associated infrastructure at Lassen Volcanic National Park in California. The contract was awarded under a HUBZone set-aside, with the primary work to be performed at the Drakesbad Guest Ranch and the KYVC (Southwest Visitor's Center) locations within the park. Key aspects of the...
- This is a $1,002,703.29 firm fixed price definitive contract awarded by the National Park Service, part of the U.S. Department of the Interior, to Toyakoi - RIO Vista JV II, LLC, a tribally owned, minority-owned small disadvantaged business. The contract is for the rehabilitation of Campground Loop E at Zion National Park in Springdale, Utah. The work includes delineating 7 group campsites, installing pedestrian walkways, an irrigation system, site furnishings, a new road system, shade...
- The Department of the Interior National Park Service Intermountain Region awarded a $609,375.37 firm fixed price delivery order to RIO Vista Management LLC, a minority-owned, woman-owned small business, to refurbish and paint potable water storage tanks at Zion National Park in Springdale, Utah. This contract was not set aside. RIO Vista Management LLC is an experienced construction management firm that has been awarded over 30 federal contracts and delivery orders as a prime contractor,...
- <p>The Department of the Interior National Park Service Intermountain Region (DOI-NPS) awarded a $919,222.21 firm fixed price delivery order contract to Acierto LLC to replace the Zion Soen Box Culvert located in Springdale, Utah. The contract runs from September 16, 2022 through April 14, 2023 and tasks Acierto LLC with replacing the existing culvert to improve water flow and prevent flooding in Zion National Park.</p>
- The U.S. National Park Service (NPS) awarded a $458,824 firm-fixed-price delivery order contract to RIO Vista Management LLC, a minority-owned, woman-owned small disadvantaged business, for the remodeling of the Zion National Park Visitor Center and Lodge Comfort Station. The contract has a total ceiling value of $467,824 and was set aside for total small business participation. RIO Vista Management LLC is performing the renovation work under the negotiated contract, which has a completion...
The National Park Service awarded a $1.8 million firm fixed-price contract to Lahi LLC under solicitation 140P1221R0006 to replace the water system at Kolob Canyons Visitor Center in Zion National Park, Utah. The contract calls for constructing a new 50,000 gallon water storage tank, replacing well pumping equipment, and installing new water mains and service lines to improve the visitor center's water distribution system. The Department of the Interior National Park Service Intermountain Region is the funding agency for this contract to improve infrastructure at the Zion National Park site. The award was set aside for Service-Disabled Veteran-Owned Small Businesses like Lahi LLC to perform the work between September 2021 and September 2022.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
ZION-NEW WATER SYSTEM AT KOLOB CANYON | 140P1221R0006 | Department of the Interior National Park Service Intermountain Region | Solicitation 2/3 | 6/1/21, 2:38 PM | |
ZION-NEW WATER SYSTEM AT KOLOB CANYONS | 140P1221R0006 | Department of the Interior National Park Service Intermountain Region | Pre-Solicitation 1/3 | 3/26/21, 6:07 PM | |
ZION-NEW WATER SYSTEM AT KOLOB CANYON | 140P1221R0006 | Department of the Interior National Park Service Intermountain Region | Award Notice 3/3 | 9/24/21, 12:34 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00006 | Supplemental Agreement for work within scope | $44.3k | 8/23/22 | |
| P00005 | Definitize Change Order | $4.7k | 7/22/22 | |
| P00004 | Change Order | $0 | 6/3/22 | |
| P00003 | Definitize Change Order | $3.5k | 4/7/22 | |
| P00002 | Change Order | $0 | 3/16/22 |