Definitive Contract 1284N819C0004
- Not listed
- The Indian Health Service awarded a delivery order valued at $844,904.13 to Hess Contracting LLC for mold remediation services at the Fort Duchesne, Utah facility. The contract, designated PH25UO01C6, was awarded on July 1, 2025, with an ultimate completion date of March 31, 2026, under a firm fixed-price arrangement with no small business set-aside designation. Hess Contracting LLC, a Preston, Idaho-based construction and facilities management company, will execute this mold remediation project...
- This is a $13,050.00 firm fixed-price purchase order awarded by the Department of the Interior National Park Service Intermountain Region to Water And Mold Remediation LLC, a small disadvantaged business, for mold remediation services at a housing unit located within the Fort Union National Monument in New Mexico. The contractor will be required to remove and dispose of approximately 380 square feet of mold-contaminated materials, treat and remove mold from 180 square feet of exposed wood...
- All Purpose Cleaning, Inc., doing business as Servicemaster All Purpose Cleaning Inc., received a $69,875 firm fixed-price purchase order from Air Force Space Command on September 5, 2025, to perform mold remediation services at Building 1075, Malmstrom Air Force Base in Montana. This Total Small Business set-aside contract requires comprehensive mold removal and remediation within approximately 7,000 square feet of crawlspace contaminated with hazardous conditions, including high humidity,...
- <p>This is a firm fixed-price delivery order for mold remediation services awarded by the Southwest Region of the Defense Department to A-1 Environmental Company. The contract has a ceiling value of $4,968.00 and a completion date of February 10, 2010. The work is described as a "RECOVERY PROJECT#38867, MOLD REMEDIATION N ROOM 202 BLDG. 41008" and is funded under the "RECOVERY--TAS::21 2022::TAS" appropriation. No set-aside designation is indicated.</p>
- The Office of Acquisitions and Grants awarded a purchase order to Bylt LLC for $13,510.30 on June 3, 2026, for mold removal services at the Fredericksburg Magnetic Observatory's Absolutes Building. This is a Total Small Business set-aside with a Women-Owned Small Business preference. Work is performed at Woodford, Virginia and includes comprehensive mold remediation across the attic, main floor, and crawl space of a 1955-constructed wood frame building. The contractor must be IICRC-certified,...
- <p>This is a firm fixed-price Delivery Order contract awarded by the Southwest Region of the Department of Defense (DoD) to A-1 Environmental Company for $8,294.00. The contract is for the removal of mold from Room 300 under the RECOVERY project number 38867. The contract has no set-aside designation and was awarded on February 11, 2010 with a completion date of the same day. The contractor, A-1 Environmental Company, is the prime contractor for this award.</p>
- The Department of Energy's Office of Fossil Energy awarded Vali Cooper International LLC, doing business as VCI, a $21,083 delivery order for architect-engineer services in support of mold remediation at Building 413 in New Orleans, Louisiana. Under the terms of the firm fixed-price contract, VCI will provide title III services, including assessment and remediation of mold contamination, at the specified facility from December 2020 through April 2021. The funding falls under the auspices of...
- Malosi Solutions LLC has been awarded a $18,495 firm fixed price purchase order for emergency mold remediation services under contract number 2B16-1. The contract is set aside for service-disabled veteran-owned small businesses and has a period of performance through February 8, 2024. Malosi Solutions will provide the mold remediation services at the Department of Veterans Affairs Veterans Health Administration facility located in Salt Lake City, Utah. As a prime contractor specializing in...
- This is a $487,609.00 firm fixed-price purchase order awarded by the Department of Veterans Affairs (VA) Veterans Health Administration to CLC Services Inc., a service-disabled veteran-owned small business (SDVOSB) based in Pleasanton, Texas. The contract is for mold remediation services at Building 25 of the Des Moines VA Healthcare System, including removing contaminated flooring, ceiling tiles, and drywall. This contract opportunity was set aside exclusively for SDVOSBs. CLC Services Inc. has...
- The U.S. Forest Service, Rocky Mountain Region awarded a firm fixed-price purchase order valued at $31,405.50 to Worsley Inspections LLC dba CNC Contractor Services to provide mold remediation services at the Middle Fork Guard Station in Lander, Wyoming. The solicitation sought these services from June 2023 through August 2024 to mitigate mold resulting from a broken pipe. The contract is set aside for total small business and will be performed from June through September 2023. As part of its...
MOLD MITIGIATION - DUCHESNE OFFICE MECHANICAL AND STORAGE ROOMS - FLOORS AND WALLS WORK TO PROGRESS PER THE PROPOSED WORK REPORT PROVIDED BY SERVICEMASTER. THE WATER DAMAGED, AND MOLD INFESTED FLOOR SHEATHING WILL BE REMOVED. CURRENTLY THERE ARE 2 THIN LAYERS OF A WOODEN FLOOR SHEATHING. BOTH WILL BE REMOVED AND DISPOSED OF. A NEW FLOOR SYSTEM OF LVT WILL BE INSTALLED. IT IS A RIGID, SOLID, WATERPROOF FLOOR SYSTEM THAT IS USED IN MITIGATION MEASURES OF THIS SCOPE. THE LVT FLOOR SYSTEM WILL BE CUT AND PIECED UNDERNEATH THE FURNACE EQUIPMENT WITHOUT THE NEED TO REMOVE THE EQUIPMENT. THE LVT FLOOR SYSTEM WILL BE CUT TO FIT, AND PUZZLE PIECED AROUND THE EQUIPMENT. THIS IS THE SAME WAY THAT THE EXISTING WOOD SHEATHING WAS INSTALLED. THE FURNACE EQUIPMENT BEARS DIRECTLY ON THE FLOOR JOISTS AND THE LVT FLOOR SYSTEM IS CUT TO FIT AROUND AND PROVIDE FULL COVERAGE UNDERNEATH THE FURNACES. THE MOLD HAS ENCROACHED INTO THE WALLS BETWEEN THE MECHANICAL ROOM AND STORAGE ROOM. FOUR INCHES HIGH OF SHEETROCK WILL BE REMOVED AND REPLACED ALONG THAT WALL AND THE EXISTING VINYL COVING/MOLDING WILL BE REMOVED, DISPOSED, AND REPLACED WITH NEW AFTER THE 4-INCH HEIGHT OF DRYWALL HAS ALSO BEEN REMOVED AND REPLACED. ANTIMICROBIAL AGENTS WILL BE APPLIED TO THE FLOOR AND WALL SYSTEMS. ALL WORK WILL BE HEPA VACUUMED AND MONITORED AND THE WORK WILL BE PERFORMED IN NEGATIVE AIR PRESSURE ENVIRONMENT TO CONTAIN ANY POTENTIAL MOLD TRANSMISSION THROUGHOUT THE BUILDING. PROJECT COR: LANCE VALENTINE, ENGINEER PHONE: 435.781.5113
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00002 | Change Order | $0 | 4/26/19 | |
| P00001 | Supplemental Agreement for work within scope | $969 | 4/9/19 | |
| Not listed | Not listed | $4.3k | 4/2/19 |