Definitive Contract 1282X920C0009
- Not listed
- This is a firm fixed-price purchase order contract awarded by the Department of Agriculture Forest Service R2-Rocky Mountain Region to Backwoods Construction, Inc., a self-certified small disadvantaged business, for the Trail Riders Bridge Replacement Project. The contract, valued at $124,362.32, involves the replacement of an existing trail bridge with a 4-foot x 36-foot steel prefabricated through truss bridge, as well as the restoration of 357 linear feet of single-track bridge. The project...
- This is a $150,509.89 firm fixed-price definitive contract awarded by the United States Department of Agriculture (USDA) Forest Service to Mountain Methods, Inc., a certified Small Business Administration (SBA) HUBZone and Minority-Owned firm, for the replacement of the Upper Silver Creek Trail Bridge in Stanislaus National Forest, California. The contract is a total small business set-aside and stems from a previous bridge collapse due to heavy snow. The project involves designing, fabricating,...
- This is a firm fixed-price purchase order awarded by the Department of the Interior's Bureau of Land Management (BLM) Colorado Region to C & C Building & Design, Inc., a small business subchapter S corporation. The contract, which has a potential value of $129,673.98, is for the design and construction of a bridge in Crested Butte, Colorado. The original solicitation was a total small business set-aside, with a NAICS code of 237990 (Other Heavy and Civil Engineering Construction) and a...
- This is a Firm Fixed Price contract awarded by the U.S. Department of Agriculture (USDA) Forest Service, Rocky Mountain Region (Region 2) to JCF Bridge & Concrete, Inc., a self-certified small disadvantaged business, for the Horseshoe CG Bridge Replacement project in the Arapaho-Roosevelt National Forest. The contract, valued at $456,768.00, is for the design, construction, and replacement of a damaged bridge. The contract has a completion date of September 30, 2020 and was set aside for...
- This contract award to Medved Global Inc., a small business contractor, is for the construction and installation of a prefabricated Big R bridge on the Paonia Ranger District of the Grand Mesa National Forest. The $66,280.00 Firm Fixed Price contract was awarded by the U.S. Department of Agriculture (USDA) Forest Service, Rocky Mountain Region, to address inadequate loading capacity of an existing timber deck bridge. The work includes delivery and installation of the prefabricated bridge, as...
- This is a $32,000 firm fixed-price purchase order awarded by the U.S. Bureau of Land Management (BLM) Colorado Region to Anson Excavating & Pipe, Inc., a self-certified small disadvantaged business, for the BLM-CO Milk Creek Timber Bridge Deck Replacement project. The contract has a total small business set-aside designation. The work involves replacing the timber bridge deck, installing water bars, and sediment removal near Wolcott, Colorado. The contract has a period of performance through...
- The USDA Forest Service awarded a $254,346 firm fixed price definitive contract to Robins Construction LLLP. The contract is for construction of the Chama Basin Trail Bridge No. 738-0.1 located on the Conejos Ranger District of the Rio Grande National Forest in Colorado. Work will include removing trees, excavating, constructing abutments and wingwalls, backfilling, installing riprap and approach rails, erecting steel girders, constructing the bridge deck, finishing grading and seeding. This...
- The U.S. Forest Service, Region 2 (Rocky Mountain Region), awarded a $2.4 million firm fixed-price contract to GCS LLC, a Service-Disabled Veteran-Owned Small Business headquartered in Ottawa, Illinois, for the replacement of West Muddy Creek Bridges #4 and #5 within the Grand Mesa, Uncompahgre, and Gunnison National Forests near Delta, Colorado. The contract, awarded January 30, 2026, carries a total small business set-aside designation and requires completion by January 30, 2027. GCS LLC...
- <p>This is a $56,150.00 firm fixed price definitive contract awarded by the U.S. Department of Agriculture, Forest Service to Koocanusa Excavating, Inc. for the ARRA / Kootenai National Forest trail bridges replacement project. The contract includes the replacement of the Little Therriault Trail Bridge, Rock Creek Trail Bridges 2 and 4, and the St. Paul Trail Bridge. This contract does not have a set-aside designation. The work is to be completed by April 1, 2011.</p>
- <p>This is a definitive contract awarded by the U.S. Forest Service, Rocky Mountain Region (Region 2) to Tropical Contracting, LLC, a small disadvantaged and woman-owned business, to replace the Weller Trail Bridge in Aspen, Colorado. The contract has a firm fixed price of $273,286.00 and a completion date of May 19, 2015. The contract was set aside for small businesses.</p>
This is a $245,544 firm fixed-price contract awarded by the U.S. Department of Agriculture Forest Service R2-Rocky Mountain Region to Mueller Construction Services, Inc. for the Maroon Creek Trail Bridge Replacements project. The contract was set aside for small businesses and involves the replacement of two trail bridges in Aspen, Colorado. The work includes ordering, fabricating, and delivering prefabricated steel bridge materials, installing traffic control and erosion control measures, removing the existing bridges and abutments, and installing the new bridges and trail surface. The contract's potential value was estimated to be between $100,000 and $240,000 during the original solicitation, which was posted on May 28, 2020 with a due date of July 2, 2020.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Maroon Creek Trail Bridge | 1282X920R0001 | Department of Agriculture Forest Service R2-Rocky Mountain Region | Solicitation 1/2 | 5/27/20, 8:21 PM | |
Maroon Creek Trail Bridges | 1282X920C0009 | Department of Agriculture Forest Service R2-Rocky Mountain Region | Award Notice 2/2 | 8/4/20, 3:02 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00003 | Close Out | ($3k) | 1/24/23 | |
| P00002 | Other Administrative Action | $0 | 10/16/20 | |
| P00001 | Other Administrative Action | $0 | 9/30/20 | |
| Not listed | Not listed | $248.2k | 7/27/20 |