TRAPPING AREA IS WATERBERRY (NUMBER OF COYOTES ALLOWED TO BE TRAPPED FOR BRACKET PERIOD 1 IS CAPPED AT 25 COYOTES.) ALL OTHER TERMS AND CONDITIONS APPLY PER AG-4660-B-10-0001. THE GOAL OF THIS PROJECT IS TO REMOVE A MINIMUM OF 50 COYOTES FROM EACH SITE. THIS IS A HIGH-VALUE STUDY, AND EACH INDIVIDUAL COYOTE CARRIES GREAT IMPORTANCE FROM THE STUDY STANDPOINT. PERFORMANCE IS BASED ON A HIGH REMOVAL RATE OF COYOTE'S AND IS OF THE UTMOST IMPORTANCE. PERFORMANCE EVALUATION OF THE NUMBER OF COYOTE TRAPPED WILL BE EVALUATED DURING EACH PERIOD. ONE BPA CALL WILL BE ISSUED FOR EACH CONTRACTOR FOR ALL PERFORMANCE PERIODS. A PERFORMANCE PERIOD IS AS FOLLOWS: BRACKET PERIOD 1 - JANUARY 15, 2010 THRU FEBRUARY 15, 2010. TRAPPING WILL BE ALLOWED FROM JANUARY 15 STRAIGHT THRU TO JANUARY 30, 2010 INCLUDING SUNDAY AND HOLIDAYS. BRACKET PERIOD 2 - FEBRUARY 16, 2010 THRU MARCH 15, 2010. TRAPPING WILL BE ALLOWED FROM MARCH 1, 2010 STRAIGHT THRU TO MARCH 13, 2010 INCLUDING SUNDAY. BRACKET PERIOD 3 - MARCH 16, 2010 THRU MARCH 31, 2010. TRAPPING WILL BE ALLOWED FROM MARCH 15, 2010 STRAIGHT THRU TO MARCH 31, 2010 INCLUDING SUNDAYS. ALL OTHER SUNDAYS AND HOLIDAYS ARE AS STATED IN THE STATEMENT OF WORK. WORK MUST BE CONDUCTED BETWEEN JANUARY 15 AND MARCH 31, 2010. THIS WORK MAY EXTEND THROUGH APRIL DEPENDING ON AVAILABILITY OF FUNDS AND BENEFITS TO THE PROJECT. ATTEMPTS TO DISPATCH COYOTES WILL TAKE PLACE DURING THE DAYLIGHT HOURS. ONLY ONE BPA CALL WILL BE ISSUED FOR ALL THREE BRACKET PERIODS. THE NUMBER OF COYOTES TO BE TRAPPED WILL BE CAPPED AT THE TIME OF THE CALL FOR BRACKET PERIOD 1. FOR THE REMAINING TWO BRACKET PERIODS WRITTEN NOTICE WILL BE ISSUED FROM THE CO TO THE CONTRACTOR FOR THE CONTRACTOR TO PROCEED WITH THE NEXT BRACKET PERIOD WITH A STATED LIMITATION ON THE NUMBER OF COYOTES TO BE TRAPPPED FOR THAT PERIOD.