Federal contract opportunity W912EP-10-B-0016 for other heavy and civil engineering construction at U.S. Army Corps of Engineers USACE District, Jacksonville, response was due Sep 10, 2010.

Due
Solicitation Number
W912EP-10-B-0016
Contract Number(s)
W912EP-10-C-0030
Additional Info Link
None listed
Set-Aside
No Set-Aside Used
Synopses View

The project work consists of dredging shoal material from Cuts A, F, & G of Tampa Harbor. The Base consists of dredging 23,000 CY of material from Cut A and placement onto Egmont Key below Mean Low Water (MLW) between monuments 7 and 10. The placement area at Egmont Key is approximately 9.9 nautical miles from Cut A. The depths for Cut A are 43 ft required and 2 ft allowable overdepth. Option A is to repair the erosion on the inside of the dike near the Weir Structures and close off the Weirs to eliminate any discharge from the site. Option B consists of dredging 62,000 CY of material from Cut F with placement in 3D disposal site located approximately 8.1 nautical miles from the dredging site. The dredging depths for Cut F are 43 ft required and 2 ft allowable overdepth. Option C is to dredge 151,000 CY of material from Cut G with placement in 3D disposal site located approximately 7.5 nautical miles from the dredging site. The dredging depths for G are 34 ft required and 2 ft allowable overdepth. Magnitude of construction is between $5,000,000.00 and $10,000,000.00.

The project work consists of dredging shoal material from Cuts A, F, & G of Tampa Harbor. The Base consists of dredging 23,000 CY of material from Cut A and placement onto Egmont Key below Mean Low Water (MLW) between monuments 7 and 10. The placement area at Egmont Key is approximately 9.9 nautical miles from Cut A. The depths for Cut A are 43 ft required and 2 ft allowable overdepth. Option A is to repair the erosion on the inside of the dike near the Weir Structures and close off the Weirs to eliminate any discharge from the site. Option B consists of dredging 62,000 CY of material from Cut F with placement in 3D disposal site located approximately 8.1 nautical miles from the dredging site. The dredging depths for Cut F are 43 ft required and 2 ft allowable overdepth. Option C is to dredge 151,000 CY of material from Cut G with placement in 3D disposal site located approximately 7.5 nautical miles from the dredging site. The dredging depths for G are 34 ft required and 2 ft allowable overdepth.

Magnitude of construction is between $5,000,000.00 and $10,000,000.00. This solicitation will be issued on or about 24 July 2009 with the bid opening on or about 23 August 2010. THIS IS AN UNRESTRICTED ACQUISITION. COAST GUARD CERTIFICATION OF VESSELS IS REQUIRED IN ACCORDANCE WITH THE SEAGOING BARGE ACT. There will be a price preference for certified HUBZone small business concerns that comply with the requirements in the solicitation as stipulated in FAR 19.1307. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call 1-888-227-2423 for more information or visit the CCR website at http://www.ccr.gov. You also must be registered in Online Representations and Certifications Application (ORCA) in order to receive an award from this solicitation. The ORCA website is located at http://orca.bpn.gov. NAICS Code 237990, size standard $20 million.

Place of Performance