- The City of St. Pete Beach has issued a Request for Bid (RFB) for the Boca Ciega Stormwater Outfall Improvements Project, located in Pinellas County, Florida. This procurement seeks a contractor to complete comprehensive stormwater infrastructure improvements in the Belle Vista neighborhood, involving critical infrastructure upgrades such as demolition of existing pipes and manholes, excavation work, and installation of 18-inch and 15-inch HDPE pipes. Key project deliverables include removing 42...
- The City of St. Petersburg, Florida, is soliciting proposals for a multi-year flatwork construction contract to provide comprehensive construction services for infrastructure projects throughout the city. The procurement seeks qualified contractors to perform work including sidewalks, driveways, curb ramps, curb and gutter, traffic separators, and associated construction activities within public rights-of-way and city facilities. Contractors must be capable of self-performing or subcontracting...
- The City of Tarpon Springs, located in Pinellas County, Florida, is soliciting bids for the Craig Park Seawall - Phase 1 project (Bid No. 260015-B-JL), a comprehensive infrastructure improvement initiative designed to protect Craig Park from tidal flooding. The procurement involves replacing approximately 3,300 linear feet of existing seawall, raising the waterfront elevation to 5.0 feet above mean sea level, reconstructing sidewalks, replacing the existing observation deck, and installing...
- The City of St. Pete Beach is soliciting proposals from qualified professional engineering firms to provide Combined Project Development & Environment (PD&E) and Preliminary Design Services for the Don CeSar & Boca Ciega Area Resiliency Adaptation Project. The procurement seeks comprehensive coastal and stormwater resiliency infrastructure solutions to address chronic tidal, dry-weather, and rainfall flooding in the Boca Ciega area. Specific deliverables include environmental...
The City of Clearwater in Pinellas County, Florida, is seeking a qualified contractor for an annual contract focused on stormwater infrastructure improvements and repairs, specifically targeting slope stabilization and seawall protection. This procurement is designed to establish a competitive, as-needed service agreement for comprehensive infrastructure maintenance. The successful contractor will be responsible for providing all necessary labor, equipment, and materials to perform work across various locations within the City of Clearwater's jurisdiction, adhering strictly to city specifications and existing infrastructure requirements. The contract will have an initial one-year term, with the city reserving the option to renew for up to three additional consecutive years, potentially extending the total contract duration to four years. While the exact contract details are not fully specified, the city emphasizes that all quantities are estimates, and there is no guaranteed minimum or maximum purchase commitment. The procurement is scheduled with a proposal due date of February 10, 2026, indicating ample preparation time for interested contractors to develop comprehensive responses. The solicitation documents do not explicitly mention any set-aside designations, disadvantaged enterprise requirements, or specific restrictions on bidding organizations. No information is provided about incumbent vendors or existing technological infrastructure that might require integration. Similarly, the documents do not outline a specific budget range or potential award value for the contract. The scope appears open to qualified contractors with demonstrated capability in stormwater infrastructure improvements, slope stabilization, and seawall protection services. Interested parties should carefully review the full solicitation documents to understand detailed submission requirements, evaluation criteria, and specific technical specifications. The City of Clearwater's approach suggests a flexible, performance-based contract model that allows for adaptive infrastructure maintenance across multiple potential project sites within the city's jurisdiction.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Slope_Stabilization.pdf | 425KB | 12/31/25 |