DESHONG LANDSLIDE PROJECT

Solicitation # BPM053390
Posted 9/30/25, 2:56 PM
No Updates
Due 10/23/25, 2:00 PM
Source
View
Similar Opportunities
The Winter Mine Drainage Control Project is a state procurement initiative posted by Maryland on October 1, 2025, with proposal submissions due by October 17, 2025. This contract appears to focus on environmental remediation and infrastructure improvement related to mine drainage management, likely targeting water quality and environmental restoration in mining-affected regions. The project seeks qualified environmental engineering firms or contractors with specialized expertise in mine drainage...
The state of Pennsylvania, specifically Clearfield County, has issued a state and local contract opportunity for a comprehensive land development and environmental management project. The procurement focuses on implementing an Erosion and Sediment Pollution Control Plan in Goshen and West Goshen Townships. Key deliverables include rock construction entrance installation, placement of 4,480 linear feet of 32-inch diameter compost filter sock, clearing and grubbing 27.8 acres, extensive grading...
The Commonwealth of Kentucky's Division of Abandoned Mine Lands (AML) has issued Request for Bid RFB-93-26 25019AMLMAML for a critical construction services project in Perry County, specifically addressing a large, active landslide near a home in Hazard. The procurement seeks a qualified contractor to perform comprehensive landslide mitigation, including removing slide material, hauling waste, stabilizing the slope with a concrete retaining wall, installing a subdrain, and constructing...
The Commonwealth of Kentucky's Division of Abandoned Mine Lands has issued a Request for Bid (RFB-94-26 24002AMLBAML) for a construction services project located in Pike County, specifically targeting a site with complex geological challenges. The procurement seeks a contractor to address environmental and structural issues including a small slide, 4 open portals, 3 collapsed portals, and significant seepage across approximately 3 acres with an expected disturbance of 0.2 acres. The project...
The Commonwealth of Kentucky's Division of Abandoned Mine Lands is seeking a contractor for a construction services project through Request for Bid (RFB-99-26 25060AMLBAML) located in Letcher County. The procurement solicits comprehensive site remediation services, including removing a slide behind a property owner's garage, constructing a 110 linear foot permanent debris barrier wall, an 80 linear foot non-reinforced block wall, installing mine portal wildlife and non-wildlife closures, and...
Carroll County is seeking proposals for a comprehensive 2025 Pipe Culvert and Storm Drain Rehabilitation project, which was officially posted on October 1, 2025, with a submission deadline of October 29, 2025. This procurement opportunity targets infrastructure improvement and maintenance within the county's existing stormwater management system. The project appears to focus on rehabilitating and potentially upgrading existing pipe culverts and storm drain infrastructure, which likely involves...
The West Virginia Department of Environmental Protection (WVDEP), Office of Abandoned Mine Lands and Reclamation, is seeking bids for the AML-Lick Run 5 Project located in Preston County, specifically on a site owned by Kingdom Ministries International. This comprehensive environmental remediation project involves reclaiming a former mining site with four draining portals, a 300-foot highwall, mine spoil, and a coal refuse pile. The project's primary deliverables include pre-construction video...

The DeShong Landslide Project is a state contract opportunity posted by Maryland on September 30, 2025, with proposals due by October 23, 2025. The procurement focuses on comprehensive site remediation and infrastructure improvement, involving multiple critical construction phases. Initial work requires installing erosion and sediment controls consistent with project-specific plans and permitted specifications. Site preparation will include clearing vegetation, removing an existing aluminum awning, and potentially constructing a temporary access road to support primary construction activities. The primary project deliverable involves constructing a concrete block retaining wall with a poured concrete footer, installing subdrain piping, and implementing a concrete inlet with a single grate. The project's final phase requires comprehensive site restoration, including lime application, fertilization, seeding, and mulching of disturbed areas following final topsoil grading.

While specific set-aside designations are not explicitly detailed in the provided documentation, the project appears to be a standard infrastructure improvement contract open to qualified construction and civil engineering contractors. The project's technical complexity suggests potential preference for vendors with demonstrated experience in geotechnical remediation, erosion control, and municipal infrastructure development. No incumbent vendor information or specific budget range was provided in the original contract description. Interested contractors would need to demonstrate capabilities in site preparation, concrete construction, drainage infrastructure installation, and environmental restoration techniques. Potential bidders should carefully review the full contract specifications to ensure comprehensive understanding of technical requirements and project scope.

Generated 10/2/25, 10:06 AM