WY-warehouse concrete work
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140R6A19Q0005
- Agency
- Bureau of Reclamation Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- PSC
- Not on record
- Place of performance
- Bureau Of ReclamationWyoming Area Office705 Pendell BlvdMillsWY82644USA 82644 USA
- More information
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Bureau of Reclamation Wyoming Area Office has a need for the removal and disposal of asphalt pavement, installation of concrete sidewalk, concrete pavement to create positive drainage, and install new handicap ramp..
Update #1 ·
THIS IS NOT A SOLICITATION FOR QUOTES. THIS IS A SYNOPSIS OF AN UPCOMING SOLICITATION.
The Bureau of Reclamation, Wyoming Area Office, has a requirement to remove and dispose of approximately 600 square feet of asphalt, install new concrete sidewalk, install concrete pavement, and installation of trench drains. The work is located at the Great Plains Region Wyoming Area Office Mills Complex which is located approximately 3 miles West of Casper, Wyoming in Natrona County. Physical address is 705 Pendell Boulevard, Mills, Wyoming.
The principal features of work are as follows:
1. Remove and dispose of approximately 600 square foot of asphalt pavement.
2. Install approximately 75 linear feet of 4-foot-wide concrete sidewalk, located between two staircases on the north side of the Warehouse building. Concrete sidewalk shall be 4†thick Portland Cement Concrete Pavement over 4†leveling base course.
3. Install approximately 290 square feet of concrete pavement, including rebar, on the northeast corner of the Warehouse building parking lot such that positive drainage is achieved. Concrete sidewalk shall be 4†thick Portland Cement Concrete Pavement over 6†Grading “W†base course.
4. Apply handicap parking traffic markings on newly installed concrete pavement.
5. Install three 6-inch-wide trench drains across the newly installed concrete sidewalk and concrete ramp. Connect existing building downspouts to the new trench drains.
Solicitation packages will be available on or around August 12, 2019. Quotation should be received on or before September 12, 2019, by 4:00 p.m. MST; at the office of the Bureau of Reclamation, Wyoming Area Office, Attn: Audrey Whetham, P.O. Box 1630, Mills, WY 82644 or by e-mail to awhetham@usbr.gov. You may fax a request for RFQ package with your Federal Tax Identification Number and Dun and Bradstreet on the request to 307-261-5691. You may also request by e-mail to awhetham@usbr.gov. The completion date for this project is
November 30, 2019. The NACIS code is 238110. The small business size standard is 15 million. The estimated price range for this job is less than $25,000
.
Attachments
| File | Type | Posted |
|---|---|---|
| FedConnect File | — |
Notice history
| Notice | Type | Posted |
|---|---|---|
| WY-warehouse concrete work | Award Notice | |
| WY-warehouse concrete work | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity