Whitney Point Crib Wall Remediation - Abstract of Bids

Closed Solicitation Posted

Solicitation number
W912DR23B0013
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z2PZ Repair Or Alteration Of Other Non-Building Facilities
More information

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Army Corps of Engineers Engineering District Baltimore is for the Whitney Point Crib Wall Remediation project. The scope of work involves demolishing the existing failing concrete crib retaining wall alongside Whitney Point Dam and reconstructing it by placing earthen fill over the roadway to buttress the wall and provide slope stability. Offerors must also obtain the necessary permits, including from the Broome County Soil and Water Conservation District. Proposals were due by April 25, 2023 and three bids were received ranging from $1,880,000 to $2,568,265.

This small business set-aside solicitation has a NAICS code of 237990 and PSC code of R499. Bids were submitted by Scrimgeour's Farm All, McCarthy Concrete Incorporated, and Mohawk Valley Materials. The work will involve demolishing the existing 80-year old crib wall and reconstructing it and making embankment repairs at Whitney Point Dam in New York to prevent wall collapse and stability issues. Offerors were evaluated based on technical qualifications, past performance, and price/cost.

Notice text

3 versions

Update #3 · Latest ·

This Small Business Set-Aside project consists of, but is not limited to, the demolition, construction, and installation of the following: Whitney Point Dam has a roadway alongside its spillway. During original construction, a concrete crib retaining wall was installed to stabilize the slope adjacent to the roadway. The crib wall is approaching 80 years old, is falling apart, and actions are required to prevent it from collapsing which could also lead to stability problems in the adjacent slope. The scope of the project is to close the roadway and place earthen fill materials on top of the roadway to buttress the wall (basically bury the wall and continue the slope down instead of keeping the road). Minor work will be included to provide roadway access via a different route since the current roadway will be closed/buried. This approach will be far less expensive than replacement of the wall and is acceptable to the owner. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Broome County Soil and Water Conservation District will be required.Amendment 01 will answer questions and post the sign in sheet from the site visit.

Amendment 02 Abstract of Bids

Update #2 ·

This Small Business Set-Aside project consists of, but is not limited to, the demolition, construction, and installation of the following: Whitney Point Dam has a roadway alongside its spillway. During original construction, a concrete crib retaining wall was installed to stabilize the slope adjacent to the roadway. The crib wall is approaching 80 years old, is falling apart, and actions are required to prevent it from collapsing which could also lead to stability problems in the adjacent slope. The scope of the project is to close the roadway and place earthen fill materials on top of the roadway to buttress the wall (basically bury the wall and continue the slope down instead of keeping the road). Minor work will be included to provide roadway access via a different route since the current roadway will be closed/buried. This approach will be far less expensive than replacement of the wall and is acceptable to the owner. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Broome County Soil and Water Conservation District will be required.Amendment 01 will answer questions and post the sign in sheet from the site visit.

Update #1 ·

This Small Business Set-Aside project consists of, but is not limited to, the demolition, construction, and installation of the following: Whitney Point Dam has a roadway alongside its spillway. During original construction, a concrete crib retaining wall was installed to stabilize the slope adjacent to the roadway. The crib wall is approaching 80 years old, is falling apart, and actions are required to prevent it from collapsing which could also lead to stability problems in the adjacent slope.. The scope of the project is to close the roadway and place earthen fill materials on top of the roadway to buttress the wall (basically bury the wall and continue the slope down instead of keeping the road). Minor work will be included to provide roadway access via a different route since the current roadway will be closed/buried. This approach will be far less expensive than replacement of the wall and is acceptable to the owner. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Broome County Soil and Water Conservation District will be required.

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment 02 Abstract of Bids WP Crib Wall_.W912DR23B0013.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity