Valve, gate

Closed Solicitation Posted

Solicitation number
N0010422QCB19
Agency
Naval Supply Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333999 All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
4820 Valves, Nonpowered

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Navy Naval Supply Systems Command seeks the manufacture and quality requirements for VALVE, GATE. The contractor must meet all requirements specified in the solicitation including applicable drawings and documentation. Evaluation will consider compliance to specifications, quality assurance records, and packaging requirements. Proposals are due by January 24, 2022.

There is no set-aside designated for this requirement. The NAICS code is 332919 and PSC code is 750. The solicitation references Cage Codes 30263 and 76364 as potential incumbents. MIL-STD-2073 applies for packaging. The contractor must provide unit pricing and total firm fixed price with procurement turnaround time and inspection/acceptance CAGE codes if different than the source. Place of performance is FOB origin.

Notice text

CONTACT INFORMATION|4|N771.30|HQL|717-605-5907|MEGAN.A.PERZIA.CIV@US.NAVY.MIL|

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||||||||||||||||||||

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|COMBO INVOICING AND RECEIVING||TO BE DETERMINED (TBD)|N00104|TBD|TBD|SEE SCHEDULE|TBD|TBD||TBD||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WEPON SYSTEMS SUPPORT|

EQUAL OPPORTUNITY (SEP 2016)|2|||

BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||

BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2021)|13|332919|750 (# of employees)||||||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|

This order is issued pursuant to Special Emergency Procurement Authority.

Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^

All freight is FOB Origin.

This RFQ is for a buy. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.

Government source inspection is required.

Unit Price:__________ FIRM

Total Price:__________ FIRM

Procurement Turnaround Time (PTAT) :__________

Awardee CAGE: __________

Inspection & Acceptance CAGE, if not at source:__________

Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the VALVE,GATE .

2. APPLICABLE DOCUMENTS

DRAWING DATA=2177917 |80064| M| |D|0001 | M|49998|1097633

DRAWING DATA=2177917 |80064| M| |D|0002 | L|49998|0205848

DRAWING DATA=2177917 |80064| M| |D|0003 | L|49998|0185915

DRAWING DATA=2177917 |80064| M| |D|0004 | L|49998|0199386

DRAWING DATA=2177917 |80064| M| |D|0005 | L|49998|0171662

DRAWING DATA=2177917 |80064| M| |D|0006 | L|49998|0317896

DRAWING DATA=2177917 |80064| M| |D|0007 | L|49998|0190067

DRAWING DATA=2177917 |80064| M| |D|0008 | L|49998|0082495

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The VALVE,GATE furnished under this

contract/purchase order shall be the design represented by Cage Code(s)

reference number(s). Cage _______ ref. no.

;30263 803-2177917-10AAF

76364 803-2177917-10AAF;

3.2 Marking - This item shall be physically identified in accordance

with ;MIL-STD-130, REV K, JAN 00; .

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and

approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the

substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government

evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new.

Code 6: Part redesigned - Parts not interchangeable.

3.4 Items supplied under this contract/purchase order shall be free of asbestos. All items containing asbestos are no longer acceptable. Any alternative item/material must be approved by the NAVICP-MECH Contracting Officer.

4. QUALITY ASSURANCE

4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any

inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance

does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity