System assembly, sub

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N0010423RNC38
Agency
Naval Supply Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC
6605 Navigational Instruments
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Supply Systems Command is seeking a contractor to manufacture a SYSTEM ASSEMBLY, SUB, a navigational instrument likely related to submarine or surface ship systems. The solicitation, identified by contract opportunity ID 8e84ca56782f4636b77dc89308aa714a, requires a firm-fixed price contract for high-precision equipment manufacturing. Critical contract requirements include strict mercury-free manufacturing standards, compliance with multiple military specifications (MIL-STD-130, MIL-I-45208), and adherence to ISO 9001/9002 quality management standards. The solicitation was originally posted on March 23, 2023, with an initial closing date extended to April 21, 2023. Contractors must demonstrate robust quality assurance processes, provide detailed traceability documentation, and be prepared to obtain government approval for any design changes or substitutions.

The contract appears to have no specific small business set-aside designation and is open to multiple potential manufacturers. While specific award value is not disclosed, the procurement involves manufacturing of a specialized submarine/surface ship system component within the Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing sector (NAICS 334511). The contract requires comprehensive documentation, including surplus material certificates, detailed parts traceability, and compliance with complex technical specifications. Contractors must be prepared to provide comprehensive quality documentation, maintain rigorous inspection records for four years after final delivery, and adhere to strict packaging and preservation standards using MIL-STD 2073 guidelines. The manufacturing location and exact delivery timeline are not explicitly specified, but the solicitation suggests potential for incremental deliveries with specific unit delivery schedules to be proposed by the contractor.

Notice text

3 versions

Update #3 · Latest ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.|

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

TIME OF DELIVERY (JUNE 1997)|20|||||||||||||||||||||

STOP-WORK ORDER (AUG 1989)|1||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||TBD||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

EQUAL OPPORTUNITY (SEP 2016)|2|||

SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||

INTEGRITY OF UNIT PRICES (NOV 2021)|1||

WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery. |One year from date of delivery. |||||

SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)|4|||||

EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||

LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997)|1||

LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1||

REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7||||||||

LIST OF AWARD ATTACHMENTS|5||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||

SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)|4|||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||

BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|334511|1250||||||||||||

COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1||

INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2|X||

REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA (NOV 2021))|7||||||||

TYPE OF CONTRACT (APR 1984)|1|Firm-fixed price|

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|

REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA (MAY 2024))|1||

The purpose of this amendment is to add the following clauses to the original solicitation:

WSSTERMCZ04

252.215-7009

252.215-7010

252.217-7026

252.222-7006

252.231-7000

52.204-2

52.209-9

52.215-1

52.215-10

52.215-12

52.215-15

52.215-16

52.215-19

52.215-20

52.215-21

52.215-22

52.215-23

52.219-1

52.219-16

52.227-6

52.230-1

52.230-2

52.230-7

52.246-24

\

The purpose of this amendment is to extend the closing date of the solicitation to 21 APR 2023.

All other terms and conditions remain unchanged.

All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to this procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent

by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

In accordance with DFAR 217.7301, Contractors shall identify their sources of supply in contracts for supplies. If the item currently being procured is a non-value added item, please provide:

Actual Manufacturer:

Cage Code:

Address:

Delivery Lead Time: __________________________

If incremental deliveries are possible, please provide a proposed schedule toinclude specific delivery times for all units.

Offer valid for ___________________ days.

Please provide email address for follow-up communications_______________________________________.

Packaging location if different than Offeror:

Name/Cage ___________________________________________

Address______________________________________________

NOTICE TO CONTRACTOR'S PROVIDING SURPLUS MATERIAL:

A surplus material certificate and label MUST accompany your quotation for surplus/new surplus/new manufactured surplus material. ALL surplus material MUST have traceability back to a Government contract in order to be consideredfor award. Without this information

we are unable to determine when the Government purchased and inspected the item and therefore, we cannot be assured of technical acceptability.

If submitting your quotation via EDI, a faxed or email copy of the surplus certificate, along with a photo of the box and label MUST be sent to the buyerASAP.

The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.

IF QUOTING AS A DISTRIBUTOR OR DEALER TO THE OEM, PLEASE SUBMIT FULL TRACEABILITY BACK TO THE OEM WITH YOUR QUOTE.

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SYSTEM ASSEMBLY,SUB .

2. APPLICABLE DOCUMENTS

2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,

however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

DOCUMENT REF DATA=MIL-STD-130 | | |J |970601|A| | |

DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |

DOCUMENT REF DATA=ISO9001 | | |94 |940701|A| | |

DOCUMENT REF DATA=ISO9002 | | |94 |940701|A| | |

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The SYSTEM ASSEMBLY,SUB furnished under this

contract/purchase order shall be the design represented by Cage Code(s)

reference number(s). Cage _______ ref. no.

;38056 378D119-01;

3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130.

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and

approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the

substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer

will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not

effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace

new.

Code 6: Part redesigned - Parts not interchangeable.

3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material

will be cause for rejection.

If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The

contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting

Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.

The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of

contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are

located so as not to constitute a contamination hazard.

If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a

polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the

requirements of this contract are concerned.

These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.

Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:

Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a

component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface

ship atmosphere.

4. QUALITY ASSURANCE

4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,

the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the

specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers

certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.

4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any

inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance

does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during

the performance of the contract and for a period of four years after final delivery of supplies.

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES

6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)

(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.

A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.

B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.

C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:

Commander, Indian Head Division, Naval Surface Warfare Center

Code 8410P, 101 Strauss Avenue

Indian Head, MD 20640-5035

D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for

certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.

E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:

Contracting Officer

NAVICP-MECH

Code 87321

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, Pa. 17055-0788

F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:

Commanding Officer

NAVICP-MECH

Code 009

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, Pa. 17055-0788

G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:

Naval Inventory Control Point

Code 1 Support Branch

700 Robbins Avenue

Phildelphia, Pa. 19111-5094

H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.

Update #2 ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

TIME OF DELIVERY (JUNE 1997)|20|||||||||||||||||||||

STOP-WORK ORDER (AUG 1989)|1||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||TBD||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

EQUAL OPPORTUNITY (SEP 2016)|2|||

SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||

INTEGRITY OF UNIT PRICES (NOV 2021)|1||

SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)|4|||||

EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3||||

LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997)|1||

LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1||

REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7||||||||

LIST OF AWARD ATTACHMENTS|5||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||

SMALL BUSINESS PROGRAM REPRESENTATIONS (DEVIATION 2023-O0002) (DEC 2022)|4|||X||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||

BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|334511|1250||||||||||||

COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1||

INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2|X||

REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA (NOV 2021))|7||||||||

TYPE OF CONTRACT (APR 1984)|1|Firm-fixed price|

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|

REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JAN 2023))|1||

The purpose of this amendment is to add the following clauses to the original solicitation:

WSSTERMCZ04

252.215-7009

252.215-7010

252.217-7026

252.222-7006

252.231-7000

52.204-2

52.209-9

52.215-1

52.215-10

52.215-12

52.215-15

52.215-16

52.215-19

52.215-20

52.215-21

52.215-22

52.215-23

52.219-1

52.219-16

52.227-6

52.230-1

52.230-2

52.230-7

52.246-24

\

The purpose of this amendment is to extend the closing date of the solicitation to 21 APR 2023.

All other terms and conditions remain unchanged.

All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to this procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent

by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

In accordance with DFAR 217.7301, Contractors shall identify their sources of supply in contracts for supplies. If the item currently being procured is a non-value added item, please provide:

Actual Manufacturer:

Cage Code:

Address:

Delivery Lead Time: __________________________

If incremental deliveries are possible, please provide a proposed schedule toinclude specific delivery times for all units.

Offer valid for ___________________ days.

Please provide email address for follow-up communications_______________________________________.

Packaging location if different than Offeror:

Name/Cage ___________________________________________

Address______________________________________________

NOTICE TO CONTRACTOR'S PROVIDING SURPLUS MATERIAL:

A surplus material certificate and label MUST accompany your quotation for surplus/new surplus/new manufactured surplus material. ALL surplus material MUST have traceability back to a Government contract in order to be consideredfor award. Without this information

we are unable to determine when the Government purchased and inspected the item and therefore, we cannot be assured of technical acceptability.

If submitting your quotation via EDI, a faxed or email copy of the surplus certificate, along with a photo of the box and label MUST be sent to the buyerASAP.

The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.

IF QUOTING AS A DISTRIBUTOR OR DEALER TO THE OEM, PLEASE SUBMIT FULL TRACEABILITY BACK TO THE OEM WITH YOUR QUOTE.

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SYSTEM ASSEMBLY,SUB .

2. APPLICABLE DOCUMENTS

2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,

however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

DOCUMENT REF DATA=MIL-STD-130 | | |J |970601|A| | |

DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |

DOCUMENT REF DATA=ISO9001 | | |94 |940701|A| | |

DOCUMENT REF DATA=ISO9002 | | |94 |940701|A| | |

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The SYSTEM ASSEMBLY,SUB furnished under this

contract/purchase order shall be the design represented by Cage Code(s)

reference number(s). Cage _______ ref. no.

;38056 378D119-01;

3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130.

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and

approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the

substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer

will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not

effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace

new.

Code 6: Part redesigned - Parts not interchangeable.

3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material

will be cause for rejection.

If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The

contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting

Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.

The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of

contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are

located so as not to constitute a contamination hazard.

If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a

polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the

requirements of this contract are concerned.

These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.

Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:

Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a

component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface

ship atmosphere.

4. QUALITY ASSURANCE

4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,

the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the

specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers

certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.

4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any

inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance

does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during

the performance of the contract and for a period of four years after final delivery of supplies.

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES

6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)

(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.

A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.

B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.

C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:

Commander, Indian Head Division, Naval Surface Warfare Center

Code 8410P, 101 Strauss Avenue

Indian Head, MD 20640-5035

D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for

certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.

E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:

Contracting Officer

NAVICP-MECH

Code 87321

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, Pa. 17055-0788

F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:

Commanding Officer

NAVICP-MECH

Code 009

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, Pa. 17055-0788

G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:

Naval Inventory Control Point

Code 1 Support Branch

700 Robbins Avenue

Phildelphia, Pa. 19111-5094

H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.

Update #1 ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

TIME OF DELIVERY (JUNE 1997)|20|||||||||||||||||||||

STOP-WORK ORDER (AUG 1989)|1||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|TBD|TBD|TBD|TBD|TBD|||TBD||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

EQUAL OPPORTUNITY (SEP 2016)|2|||

SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||

INTEGRITY OF UNIT PRICES (NOV 2021)|1||

SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)|4|||||

EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3||||

LIST OF AWARD ATTACHMENTS|5||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||

BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|334511|1250||||||||||||

TYPE OF CONTRACT (APR 1984)|1|Firm-fixed price|

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|

The purpose of this amendment is to extend the closing date of the solicitation to 21 APR 2023.

All other terms and conditions remain unchanged.

All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to this procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent

by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

In accordance with DFAR 217.7301, Contractors shall identify their sources of supply in contracts for supplies. If the item currently being procured is a non-value added item, please provide:

Actual Manufacturer:

Cage Code:

Address:

Delivery Lead Time: __________________________

If incremental deliveries are possible, please provide a proposed schedule toinclude specific delivery times for all units.

Offer valid for ___________________ days.

Please provide email address for follow-up communications_______________________________________.

Packaging location if different than Offeror:

Name/Cage ___________________________________________

Address______________________________________________

NOTICE TO CONTRACTOR'S PROVIDING SURPLUS MATERIAL:

A surplus material certificate and label MUST accompany your quotation for surplus/new surplus/new manufactured surplus material. ALL surplus material MUST have traceability back to a Government contract in order to be consideredfor award. Without this information

we are unable to determine when the Government purchased and inspected the item and therefore, we cannot be assured of technical acceptability.

If submitting your quotation via EDI, a faxed or email copy of the surplus certificate, along with a photo of the box and label MUST be sent to the buyerASAP.

The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.

IF QUOTING AS A DISTRIBUTOR OR DEALER TO THE OEM, PLEASE SUBMIT FULL TRACEABILITY BACK TO THE OEM WITH YOUR QUOTE.

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SYSTEM ASSEMBLY,SUB .

2. APPLICABLE DOCUMENTS

2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,

however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

DOCUMENT REF DATA=MIL-STD-130 | | |J |970601|A| | |

DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |

DOCUMENT REF DATA=ISO9001 | | |94 |940701|A| | |

DOCUMENT REF DATA=ISO9002 | | |94 |940701|A| | |

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The SYSTEM ASSEMBLY,SUB furnished under this

contract/purchase order shall be the design represented by Cage Code(s)

reference number(s). Cage _______ ref. no.

;38056 378D119-01;

3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130.

3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and

approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the

substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer

will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not

effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace

new.

Code 6: Part redesigned - Parts not interchangeable.

3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material

will be cause for rejection.

If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The

contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting

Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.

The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of

contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are

located so as not to constitute a contamination hazard.

If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a

polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the

requirements of this contract are concerned.

These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.

Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:

Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a

component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface

ship atmosphere.

4. QUALITY ASSURANCE

4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,

the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the

specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers

certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.

4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any

inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance

does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.

4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during

the performance of the contract and for a period of four years after final delivery of supplies.

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES

6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)

(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.

A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.

B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.

C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:

Commander, Indian Head Division, Naval Surface Warfare Center

Code 8410P, 101 Strauss Avenue

Indian Head, MD 20640-5035

D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for

certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.

E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:

Contracting Officer

NAVICP-MECH

Code 87321

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, Pa. 17055-0788

F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:

Commanding Officer

NAVICP-MECH

Code 009

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, Pa. 17055-0788

G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:

Naval Inventory Control Point

Code 1 Support Branch

700 Robbins Avenue

Phildelphia, Pa. 19111-5094

H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
System assembly, sub Award Award Notice
System assembly, sub This notice · Latest solicitation Solicitation
System assembly, sub Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity