Stidham union patio project
Awarded Award Notice Posted
- Solicitation number
- 140A0319B0010
- Agency
- Central Office Bureau of Indian Affairs and Indian Education, Department of the Interior
- Awarded
- to Firelake Construction Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 140A0319C0008 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
PROJECT TITLE: STIDHAM UNION PATIO PROJECT
. Awarded Vendors: FIRELAKE CONSTRUCTION, INC.
14217 W 95TH ST
LENEXA
KS
66215-5208
US. Contract Award Dollar Amount: $165,803.00. Contract Award Date: 2019-04-18.
Update #2 ·
PROJECT TITLE: STIDHAM UNION PATIO PROJECT
THIS AMENDMENT ANSWERS CLARIFICATION QUESTIONS SUBMITTED;
1. Please confirm the location to where the existing concrete is to be removed and replaced is to the first break line on the south edge of building wall. ANS: YES AT 4' BREAKLINE WHERE DOORS ARE LOCATED
2. Please confirm if an option is to be priced to remove the entire concrete patio (clear to the north brick building wall) except for the section in front of the doors. In this area, the existing concrete from the closest break line north toward the building would remain. ANS: YES REMOVE CONRETE THAT GOES AGAINST BRICK ON SOUTH SIDE OF PATIO
3. Please confirm if French drains are to be installed in front of the building doors on the upper patio and if these must extend the full length (east/west) of the patio. ANS:NO
4. Please confirm if the dye in the concrete is to be incorporated in the mix/pre-mixed or the variety that sprinkles on top. ANS: MIXED IN MAIN BODY, SPRINKLED IN ON REMAINING IN FRONT OF DOORS TWO (2) LOCATIONS
5. Please confirm if the existing aluminum fronts of the firewood storage boxes are to be re-used or replaced. The SOW states to replace these with stainless steel, however, would the government prefer aluminum to reduce the amount of weight to be pulled? In addition, please confirm if the entire fire wood bin system is to be replaced (rack, track, etc.). Are the locking mechanisms on the fire wood bins to have a removable cylinder that would be compatible for HINU to install their own cylinders? If so, please provide cylinder/lock specifications. ANS: ALUMINUM DOORS ARE FINE, REPLACE ENTIRE BIN SYSTEM, CYLINDER WILL BE A BEST LOCK
6. During the site visit it was noted on the south east side of the patio there were a set of brick stairs that descended onto the patio. The bottom step of the stairs rested on the concrete patio to be removed and were not mentioned in the SOW for removal and replacement. Does the government require this brick step be covered under this contract? ANS; REMOVE THE FIRST BRICK STEP AND REPLACE.
7. Regarding the half-circle brick sidewalk on the lower patio area, please confirm these bricks are to be removed and replaced with like bricks rather than pavers or stamped/dyed concrete. ANS: REPLACED WIT LIKE BRICKS.
8. Please confirm if lower patio/garden area is to be altered to allow proper drainage (either via drain tile or sloping the ground). It appears the area is currently ¿dished¿ and retains water drainage from the upper patio. ANS: WE WOULDLIKE THIS AREA TO DRAIN
9. Regarding the sidewalks that lead away from the patio towards Winona Hall and Minoka Hall, please confirm if their new intersection with the street curb is to be ADA compliant (ie. raised textured mat inlay, etc.). ANS: YES.
Update #1 ·
PROJECT TITLE: STIDHAM UNION PATIO PROJECT
DESCRIPTION: Contractor will be responsible for providing all labor, materials and incidentals for the renovation of an existing patio, in accordance with the statement of work, contract terms and conditions.
PROJECT LOCATION: Haskell Indian Nations University, Lawrence, KS, Douglas County.
ATTACHMENTS:
1. Wage Rates
MAGNITUDE OF PROJECT: As required under FAR Part 36.204, Project Magnitude is $100,000-$250,000.
BID: Bid should be submitted on Page 2 of the SF-1442. Bids can be submitted by mail or email to the Contracting Officer, Jocelyn LittleChief. Project name and solicitation number should be cited on the outside of the envelope or in the subject line of the email. Email address is : Jocelyn.littlechief@bia.gov.
NAICS CODE: The North American Industry Classification Code (NAICS) is 236220 - Commercial and Institutional Building Construction, with a size standard of $36.5m.
SET ASIDE: This procurement is being set-aside exclusely for Small Business Concerns. Contractor will be required to be registered in SAM as a small business under the NAICS Code at the time of submitting a bid.
Contractor is required to comply with the Davis Bacon Act.
Bonding: FAR Clause 52.228-15, Performance and Payment Bonds-Construction, will apply, along with FAR Clause 52.228-1 Bid Guarantee.
Contracting questions can be directed to Jocelyn LittleChief at jocelyn.littlechief@bia.gov or by calling 405.247.1527. For technical questions regarding the SOW contact Steve LaCour at 785.813.5626.
Site Visit: For information on the site visit meeting see Section L..
Attachments
| File | Type | Posted |
|---|---|---|
| FedConnect File | — |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity