Place of performance
The project is located on Memorial Way Road, Forest Service Road Number 487. The site can be accessed from Stanford, Montana by the following route: Take U.S. Highway 87 East to Windham, Montana. Turn South at Windham onto State Highway 239. Follow State Highway 239 to Utica. At Utica, turn South onto County Road 1. Follow County Road 1 from Utica approximately 13 miles to the beginning of the project area. Utica, Montana 59452, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Jun 19, 2012 5:38 pm Modified: Jul 07, 2012 1:36 pmTrack Changes South Fork Judith River Road Repair consists of repairing the damages done to the road during spring 2011 flooding. The work includes placing riprap and embankment to stabilize sections of road. Also included in the work is placing sod mats, erosion control fabric, planting vegetation, replacing bridge wingwalls and deadman anchors, roadway excavation, placing aggregate, and incidental related work.

Disclosure of the Magnitude of Construction Projects:
FAR 36.204(e) - Between $250,000 and $500,000.


Pre bid tour:
No pre-bid tour is planned for this project.


Bid Guarantee:
Yes. FAR 52.228-1 will be included in this solicitation. Guarantee to be equal to 20% of the bid price or $200,000, whichever is less.


Solicitation Date:
It is anticipated the solicitation and all materials will be posted to the FBO website by mid July 2012. Please watch FBO solicitation number AG-03K0-S-12-0017 for updates.

Update #1 ·

Added: Jun 19, 2012 5:38 pm South Fork Judith River Road Repair consists of repairing the damages done to the road during spring 2011 flooding. The work includes placing riprap and embankment to stabilize sections of road. Also included in the work is placing sod mats, erosion control fabric, planting vegetation, replacing bridge wingwalls and deadman anchors, roadway excavation, placing aggregate, and incidental related work.

Disclosure of the Magnitude of Construction Projects:
FAR 36.204(e) - Between $250,000 and $500,000.


Pre bid tour:
No pre-bid tour is planned for this project.


Bid Guarantee:
Yes. FAR 52.228-1 will be included in this solicitation. Guarantee to be equal to 20% of the bid price or $200,000, whichever is less.


Solicitation Date:
It is anticipated the solicitation and all materials will be posted to the FBO website by mid July 2012. Please watch FBO solicitation number AG-0398-S-12-0008 for updates.