Sole Source - DFC Elec Infrastructure - Y-Side Substation Transformer Replacement
Closed Solicitation Posted
- Solicitation number
- 47PJ0022R0102
- Agency
- Region 8 Public Buildings Service, General Services Administration
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Lakewood, Colorado 80225, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the General Services Administration seeks to award a sole-source contract to Sturgeon Electric Company to complete electrical infrastructure upgrades at the Denver Federal Center in Lakewood, Colorado. The project includes replacing one of two existing 22.4MVA substation transformers and associated switchgear, demolishing old equipment, installing a new foundation and underground cabling, and testing and commissioning all new electrical components. Proposals are due by January 1, 2023 with award estimated at $2,942,436.32 to be completed according to the contractor's standard commercial practices.
No set-aside provisions apply, with NAICS codes 236220 and PSC code Z1CA indicating electric power distribution work. As the current O&M contractor for the entire Denver Federal Center electrical grid, Sturgeon Electric is identified as the only contractor qualified to perform this work in order to prevent any disruption to the critical electrical infrastructure supporting multiple federal tenants. All work is to be completed at the Denver Federal Center located at 633 17th St., Lakewood, Colorado 80225 by December 31, 2023.
Notice text
Construction activity at the Denver Federal Center to repair/replace the Y-Side Substation transformer, one of two existing primary substation transformers at the DFC. Project would include Project would include the engineer and design a set of construction documents and specifications for the civil, structural, and electrical work for the replacement of the “Y” side Substation. The design shall incorporate the transformer and switchgear. Including the manufacturer engineering, purchase, and deliver a new “Y” side Substation transformer to match the performance characteristics of the existing “X” side Substation transformer. Project would include engineering, purchase, and deliver a new 15kv “Y” side switchgear. New switchgear sections shall match the existing section’s purpose with new circuit breakers, protective relays, and metering cabinets. Design a new foundation sized and engineered to meet the geotechnical conditions and weight of the new transformer and equipment to be installed. Construct an oil retention pit or curb, with tank. Remove and install a new concrete duct bank from the transformer to the existing switchgear pad. Coordinate demolition of existing equipment as well as installation dependent on timing of equipment delivery.
Attachments
| File | Type | Posted |
|---|---|---|
| JOTFOC 11-04-22 fully executed.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity