Shock absorber, dire

Closed Solicitation Posted

Solicitation number
N0038320QN413
Agency
Naval Supply Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333999 All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
1620 Aircraft Landing Gear Components

Notice details come from SAM.gov. Updated .

Notice text

CONTACT INFORMATION|4|N731.15|M3D|2156971232|CHRISTIE.GUMMEL@NAVY.MIL|

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|XX||||||||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|N/A|N00383|N/A|N/A|N/A|N/A|||||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2|||

EQUAL OPPORTUNITY (SEP 2016)|2|||

EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)|4|||||

WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR FROM THE DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT|||||

EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUL 2014)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM (DEC 2017)|5||||||

LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009)|1||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (NOV 2014))|5||||||

BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)|12|336413|1250|||||||||||

REPRESENTATION REGARDING CERTIAN TELECOMMUNICATIONS AND VIDEO SUREILLANCESERVICES OR EQUIPMENT (AUG 2019))|2|||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||XX|

THIS RFQ IS FOR REPAIR.

1. SCOPE

1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.

1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be

provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this

procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.

1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by

IPC/EIAJ-STD-001C paragraph 5.1.4.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

ALL TESTING AND INSPECTIONS SHALL BE PERFORMED IAW THE STATEMENT OF WORK DATED 28 NOVEMBER 2018, REVISION "A". AND DD1423 CDRL DATED 27 NOVEMBER 2018.

SOW AND CDRL WILL BE PROVIDED BY N231.

4. QUALITY ASSURANCE

ALL TESTING AND INSPECTIONS SHALL BE PERFORMED IAW THE STATEMENT OF WORK DATED 28 NOVEMBER 2018, REVISION "A". AND DD1423 CDRL DATED 27 NOVEMBER 2018.

SOW AND CDRL WILL BE PROVIDED BY N231.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.

Block 9: Statement B, US Government, Naval Inventory Control Point

Block 12: First submission to be made upon submission of ;FAT/PLT; testing sample.

^ Block 14: Make submission to ;DCMA/QAR

ACO

NAVSUP code N23; .

Block 13: Second submission required if the process/operation changes after approval of ;FAT/PLT; test.

^^ Block 14: Make submission to ;DCMA/QAR

ACO

NAVSUP code N23; .

Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.

Block 9: Statement B, US Government, Naval Inventory Control Point

Block 12: First submission to be made upon submission of ;FAT/PLT; testing sample.

^ Block 14: Make submission to ;NAVSUP N23

ACO

DCMA; .

Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.

Block 9: Statement B, US Government, Naval Inventory Control Point

Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.

Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized,

separate certifications are required.

BLOCK #5: Contract Reference:

;Material and process subcontractors must be approved by Boeing in accordance with Boeing Approved Vendor list D1-4426;

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity