Shasta hanger rod emergency installation

Awarded Award Notice Posted

Solicitation number
140R2024C0004
Agency
Bureau of Reclamation Department of the Interior
Awarded
to Shimmick Construction Company, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
140R2024C0004 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z1KA Maintenance Of Dams

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior Bureau of Reclamation awarded a $323,000 contract to Shimmick Construction Company, Inc. on November 15, 2023 to repair and maintain the temperature control device (TCD) at Shasta Dam. Specifically, the contract involves structural support for the hanger rod assembly of the TCD to prevent failure, as engineering analysis identified the existing assembly is at risk of failure, which could lead to the failure of the entire shutter structure.

Notice text

The temperature control device (TCD) is a steel structure consisting of a shutter structure and low level intake structure that are attached to the upstream face of Shasta Dam. The device encloses all five existing power penstock intakes and permits selective level withdrawal of reservoir water. High level withdrawal is controlled by the 250 ft-wide by 300 ft-high shutter structure. Construction of the TCD started in December 1994 and was substantially complete in December 1996.

A special climb inspection was performed March 6-8, 2023. Following the climb inspection, engineering analysis was completed on the hanger rod group located at the right side, downstream corner of Shutter No. 3. The inspection and analysis have confirmed that the Left Side Upstream (LS-US) hanger rod assembly no longer has the ability to provide structural support. With the loss of the LS-US hanger rod assembly, the entire hanger rod group at the right side, downstream corner of Shutter No. 3 is at risk of failure. These hanger rod assemblies are considered critical structural components because the loss of one of these corner hanger rod groups would likely lead to the failure of Shutter No. 3, and adjacent Shutter Nos 2 and 4. Awarded contract 140R2024C0004 to SHIMMICK CONSTRUCTION COMPANY, INC. for 323000 on 2023-11-15.