Sac Landing Pier Design-Build, NPS-PORE

Awarded Award Notice Posted

Solicitation number
P16PS02120
Agency
National Park Service Department of the Interior
Awarded
to H2L1 Engineering Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
P16PC00754 Federal contract award
NAICS code
237120 Oil and Gas Pipeline and Related Structures Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Added: Jul 18, 2016 1:14 pm Modified: Sep 23, 2016 3:29 pmTrack Changes IGF::OT::IGF X:NOGRN, COMPLETE THE SACRAMENTO LANDING PIER AND ADD MARINE FUEL STATION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA

Update #3 ·

Added: Jul 18, 2016 1:14 pm Modified: Aug 31, 2016 10:52 pmTrack Changes COMPLETE THE SACRAMENTO LANDING PIER AND ADD MARINE FUEL STATION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA.



This Amendment 0001 documents the August 24, 2016 Site Visit by providing the Site Visit Sign In Sheet, Site Visit Notes, answers to questions received to date, and project site photos, as follows:



P16PS02120_Attachment 16_Site Visit Sign In Sheet.pdf

P16PS02120_Attachment 17_Site Visit Notes Q&A.pdf

P16PS02120_Attachment 18_Photos.pdf



In light of this information, the due date for proposals has been extended; PROPOSALS MUST BE RECEIVED BY: 3:00pm, TUESDAY, September 13, 2016.

Update #2 ·

Added: Jul 18, 2016 1:14 pm Modified: Aug 10, 2016 7:38 pmTrack Changes COMPLETE THE SACRAMENTO LANDING PIER AND ADD MARINE FUEL STATION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA.



The National Park Service at Point Reyes National Seashore has a requirement to complete the Sacramento Landing Pier and add a marine fuel station. The project area is located at Sacramento Landing on the west shore of Tomales Bay, Point Reyes National Seashore, Marin County, California.



The Sacramento Landing Pier is used by National Park Service personnel only; the public is prohibited from using the pier. The 257-foot long timber pier, ramp, and timber floating dock were improved in a 2007 project that replaced about 70 percent (%) of the pier and the ramp to the main dock. This project will remove and replace the remaining 30% of pier (about 76 LF) as well as add a new marine fueling system.



The project shall consist of the design, furnish, and re-construction of a portion of a timber pier and design, furnish, and installation of a new fueling system at Sacramento Landing. This project shall consist of all pier, fueling system, site, and utility work to make this project complete and ready for use. The project shall be investigated, designed, material provided, installed, and completed with warranties as follows: 1) Remove and replace approximately 76 linear feet (LF) of existing timber pier that was not replaced as part of the 2007 project. The new work will essentially replace a portion of the pier in-kind with similar materials and add guardrails for this project; 2) Investigate and design location of proposed fuel tank to protect from coastal hazards; 3) Design, furnish, and install a new marine fueling system with a 1,00-gallon upland tank that delivers gasoline to the floating dock; 4) Design, furnish, and install electrical service to new fuel tank and provide electrical lighting upgrades at pier; and 5) Close out project including, but not limited to, providing as-built drawings; Operations & Maintenance (O&M) Manual(s); and training for operation of systems.



The project range is estimated to be between $250,000 and $500,000. The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237120, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.



This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.



The Request for Proposal (RFP) and all attachments can be accessed via the link to FedConnect, or by going directly to the FedConnect website at https://www.fedconnect.net. Once at the FedConnect home page, click "Search Public Opportunities Only." Next screen, under Search Criteria, change the drop-down menu selection to read "Reference Number," then type in solicitation number P16PS02120 and click "search." Next screen, click the underlined text that is the title of the solicitation, shown as "Sac Landing Pier Design-Build, NPS-PORE." Next screen is the overview screen. On the right-hand side, is the list of documents posted, showing the SF-1442 solicitation form and all attachments. The attachments must be opened individually, and can be downloaded and saved or printed. Besides the SF-1442 solicitation form, there are fifteen (15) attachments, such as Attachment 01 (Bid Schedule), etc.



A Site Visit has been scheduled for Wednesday, August 24, 2016 at 9:00a.m. See Section L of the RFP for more information. While not required, attendance at the Site Visit is highly recommended.



Interested parties may explore the Point Reyes National Seashore website to acquaint themselves with the general area and to view park maps at http://www.nps.gov/PORE.

Update #1 ·

Added: Jul 18, 2016 1:14 pm NATIONAL PARK SERVICE

POINT REYES NATIONAL SEASHORE

COMPLETE THE SACRAMENTO LANDING PIER AND ADD MARINE FUEL STATION



The National Park Service at Point Reyes National Seashore has a requirement to complete the Sacramento Landing Pier and add a marine fuel station. The project area is located at Sacramento Landing on the west shore of Tomales Bay, Point Reyes National Seashore, Marin County, California.



The Sacramento Landing Pier is used by National Park Service personnel only; the public is prohibited from using the pier. The 257-foot long timber pier, ramp, and timber floating dock were improved in a 2007 project that replaced about 70 percent (%) of the pier and the ramp to the main dock. This project will remove and replace the remaining 30% of pier (about 76 LF) as well as add a new marine fueling system.



The project shall consist of the design, furnish, and re-construction of a portion of a timber pier and design, furnish, and installation of a new fueling system at Sacramento Landing. This project shall consist of all pier, fueling system, site, and utility work to make this project complete and ready for use. The project shall be investigated, designed, material provided, installed, and completed with warranties as follows: 1) Remove and replace approximately 76 linear feet (LF) of existing timber pier that was not replaced as part of the 2007 project. The new work will essentially replace a portion of the pier in-kind with similar materials and add guardrails for this project; 2) Investigate and design location of proposed fuel tank to protect from coastal hazards; 3) Design, furnish, and install a new marine fueling system with a 1,00-gallon upland tank that delivers gasoline to the floating dock; 4) Design, furnish, and install electrical service to new fuel tank and provide electrical lighting upgrades at pier; and 5) Close out project including, but not limited to, providing as-built drawings; Operations & Maintenance (O&M) Manual(s); and training for operation of systems.



The project range is estimated to be between $250,000 and $500,000. The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237120, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.



This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.



The Request for Proposal (RFP) will be available on/about August 2, 2016 by electronic means only and can be downloaded along with all related attachments from the FedBizOpps website at http://www.fbo.gov or FedConnect: http://www.fedconnect.net. The RFP will close 30 days from the actual date of issuance. The Contractor is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFP.



The Government intends to award a single, fixed price contract. Award selection will be made on a Best Value determination made after consideration of price and factors other than price. Award is subject to the availability of funding at the time of award.



A Site Visit will be scheduled. See Section L of the RFP (when issued) for more information. While not required, attendance at the Site Visit is highly recommended.



Interested parties may explore the Point Reyes National Seashore website to acquaint themselves with the general area and to view park maps at http://www.nps.gov/PORE.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity