Replacement of Trail Bridge at Windfall Lake
Awarded Award Notice Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 12010919Q0100
- Agency
- Region 10 - Alaska Region Forest Service, Department of Agriculture
- Awarded
- to Oregon Woods, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 12010919C0040 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Windfall Lake Trail Juneau, Alaska 99801, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Awarded Vendors: Oregon Woods. Contract Award Dollar Amount: $297,300. Contract Award Date: 2019-09-23.
Update #2 ·
This update posts the RFQ and associated documents. This is the same RFQ that was posted to FBO as a combined synopsis solicitation. Documents and all updates/Q-A/amendments will be posted to this notice.
************************
This presolicitation notice is for replacement of a trail bridge (approximate length of existing bridge is 73') at MP 2.286 on the Windfall Lake Trail in Juneau, Alaska. The existing bridge consists of four steel open web joists, timber deck, timber handrail and timber abutments. The contractor furnished and installed replacement bridge consists of four steel open web joists, timber deck, steel cable handrail and glu-lam timber abutments. Work includes trail construction for a short re-alignment of the existing trail, construciton of new trail approaches leading to the new bridge and construction of timber crib steps.
The magnitude of construction is between $100,000 and $250,000.
The government anticipates issuing a solicitation within the next week with quotes due in early September..
Update #1 ·
This presolicitation notice is for replacement of a trail bridge (approximate length of existing bridge is 73') at MP 2.286 on the Windfall Lake Trail in Juneau, Alaska. The existing bridge consists of four steel open web joists, timber deck, timber handrail and timber abutments. The contractor furnished and installed replacement bridge consists of four steel open web joists, timber deck, steel cable handrail and glu-lam timber abutments. Work includes trail construction for a short re-alignment of the existing trail, construciton of new trail approaches leading to the new bridge and construction of timber crib steps.
The magnitude of construction is between $100,000 and $250,000.
The government anticipates issuing a solicitation within the next week with quotes due in early September..
Attachments
| File | Type | Posted |
|---|---|---|
| RFQ_-_Attachment__3_Forest_Service_Supplemental_Specifications.pdf | ||
| RFQ_-_Attachment__1_Section_C_-_SOW-Specifications.pdf | ||
| 12010919Q0100_RFQ.pdf | ||
| RFQ_-_Attachment__4_Windfall_Trail_Bridge_Plans.pdf | ||
| RFQ_-_Attachment__2_Wage_Determination.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Windfall Lake Trail Bridge | Solicitation | |
| Replacement of Trail Bridge at Windfall Lake | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity