Replace Spillway Bridge, Marion, Kansas

Awarded Award Notice Posted

Solicitation number
W912BV18R0039
Agency
ENDIST Tulsa US Army Corps of Engineers, Department of Defense
Awarded
to Dondlinger & Sons Construction Co Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912BV18C0019 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Marion, Kansas Marion, Kansas, United States

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

Awarded Vendors: Dondlinger & Sons Construction Co., Inc.. Contract Award Dollar Amount: $4,856,700.00. Contract Award Date: 2018-09-27.

Update #8 ·

Amendment 01 issued to add site visit information..

Update #7 ·

Added: Jul 30, 2018 4:49 pm Amendment 01 issued to add site visit information.

Update #6 ·

Issue Solicitation W912BV18R0039.

Update #5 ·

Added: Jul 27, 2018 10:35 am Issue Solicitation W912BV18R0039

Update #4 ·

PRE-SOLICITATION NOTICE FOR REPLACE SPILLWAY BRIDGE, MARION, KANSAS

This is a pre-solicitation notice; for the above noted construction project. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation or any follow up postings.


The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for Replace Spillway Bridge, Marion, Kansas.


This will be a total turnkey contract with all work being performed by the Contractor. The Contractor shall provide all materials, equipment, labor, instruments, tools, subcontractora, supervision, and magement to complete all work required by this contract. The scope of work in general includes, but not limited to the following:
a. Provide traffic control;
b. Maintain access and function of all spillway gate operating equipment throughout duration of contract.
c. Replace electrical lines and panel box for spillway operating equipment.
d. Demolish existing 3-span (approx. 150-ft total length) pre-twnsioned concrete box girder bridge;
e. Modify existing substructure. Complex and precise demolition required, use of impact demolition heavily restricted or not allowed;
f. Initial, immediate, and final surveys required;
g. Repair existing pier cracks/spalls;
h. Replace bridge with pre-tensioned concrete girders and slab;
i. Replace bridge appurtenances;
j. Licensed Professional Engineer to provide crane placement plan(s), address critical lifts, perform evaluation of construction loads by equipment and storage of materials during construction, etc.


Proposed project will be competitive, firm-fixed priced, construction only contract procured in accordance with FAR 15, Best Value Tradeoff Method. This is an "Unrestricted" acquisition.


In accordance with FAR 36/DFARs 236, the magnitude construction cost price range for this project is : $1,000,000-$5,000,000 Million.


Estimated duration of the project is TBD.


The North American Industry Classification System code for this procurement is 237310 which has a small business size standard of $36.5M.


Anticipated solicitation issuance date is on or about 16 July 2018 and estimated proposal due date will be on or about 17 August 2018 .

.

Update #3 ·

Added: May 08, 2018 3:50 pm Modified: Jun 05, 2018 5:27 pmTrack Changes PRE-SOLICITATION NOTICE FOR REPLACE SPILLWAY BRIDGE, MARION, KANSAS

This is a pre-solicitation notice; for the above noted construction project. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation or any follow up postings.


The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for Replace Spillway Bridge, Marion, Kansas.


This will be a total turnkey contract with all work being performed by the Contractor. The Contractor shall provide all materials, equipment, labor, instruments, tools, subcontractora, supervision, and magement to complete all work required by this contract. The scope of work in general includes, but not limited to the following:
a. Provide traffic control;
b. Maintain access and function of all spillway gate operating equipment throughout duration of contract.
c. Replace electrical lines and panel box for spillway operating equipment.
d. Demolish existing 3-span (approx. 150-ft total length) pre-twnsioned concrete box girder bridge;
e. Modify existing substructure. Complex and precise demolition required, use of impact demolition heavily restricted or not allowed;
f. Initial, immediate, and final surveys required;
g. Repair existing pier cracks/spalls;
h. Replace bridge with pre-tensioned concrete girders and slab;
i. Replace bridge appurtenances;
j. Licensed Professional Engineer to provide crane placement plan(s), address critical lifts, perform evaluation of construction loads by equipment and storage of materials during construction, etc.


Proposed project will be competitive, firm-fixed priced, construction only contract procured in accordance with FAR 15, Best Value Tradeoff Method. This is an "Unrestricted" acquisition.


In accordance with FAR 36/DFARs 236, the magnitude construction cost price range for this project is : $1,000,000-$5,000,000 Million.


Estimated duration of the project is TBD.


The North American Industry Classification System code for this procurement is 237310 which has a small business size standard of $36.5M.


Anticipated solicitation issuance date is on or about 16 July 2018 and estimated proposal due date will be on or about 17 August 2018 .

Update #2 ·

PRE-SOLICITATION NOTICE FOR REPLACE SPILLWAY BRIDGE, MARION, KANSAS

This is a pre-solicitation notice; for the above noted construction project. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation or any follow up postings.


The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for Replace Spillway Bridge, Marion, Kansas.


This will be a total turnkey contract with all work being performed by the Contractor. The Contractor shall provide all materials, equipment, labor, instruments, tools, subcontractora, supervision, and magement to complete all work required by this contract. The scope of work in general includes, but not limited to the following:
a. Provide traffic control;
b. Maintain access and function of all spillway gate operating equipment throughout duration of contract.
c. Replace electrical lines and panel box for spillway operating equipment.
d. Demolish existing 3-span (approx. 150-ft total length) pre-twnsioned concrete box girder bridge;
e. Modify existing substructure. Complex and precise demolition required, use of impact demolition heavily restricted or not allowed;
f. Initial, immediate, and final surveys required;
g. Repair existing pier cracks/spalls;
h. Replace bridge with pre-tensioned concrete girders and slab;
i. Replace bridge appurtenances;
j. Licensed Professional Engineer to provide crane placement plan(s), address critical lifts, perform evaluation of construction loads by equipment and storage of materials during construction, etc.


Proposed project will be competitive, firm-fixed priced, construction only contract procured in accordance with FAR 15, Best Value Tradeoff Method. This is an "Unrestricted" acquisition.


In accordance with FAR 36/DFARs 236, the magnitude construction cost price range for this project is : $1,000,000-$5,000,000 Million.


Estimated duration of the project is TBD.


The North American Industry Classification System code for this procurement is 237310 which has a small business size standard of $36.5M.


Anticipated solicitation issuance date is on or about 28 May 2018, and estimated proposal due date will be on or about 30 June 2018.

.

Update #1 ·

Added: May 08, 2018 3:50 pm PRE-SOLICITATION NOTICE FOR REPLACE SPILLWAY BRIDGE, MARION, KANSAS

This is a pre-solicitation notice; for the above noted construction project. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation or any follow up postings.


The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for Replace Spillway Bridge, Marion, Kansas.


This will be a total turnkey contract with all work being performed by the Contractor. The Contractor shall provide all materials, equipment, labor, instruments, tools, subcontractora, supervision, and magement to complete all work required by this contract. The scope of work in general includes, but not limited to the following:
a. Provide traffic control;
b. Maintain access and function of all spillway gate operating equipment throughout duration of contract.
c. Replace electrical lines and panel box for spillway operating equipment.
d. Demolish existing 3-span (approx. 150-ft total length) pre-twnsioned concrete box girder bridge;
e. Modify existing substructure. Complex and precise demolition required, use of impact demolition heavily restricted or not allowed;
f. Initial, immediate, and final surveys required;
g. Repair existing pier cracks/spalls;
h. Replace bridge with pre-tensioned concrete girders and slab;
i. Replace bridge appurtenances;
j. Licensed Professional Engineer to provide crane placement plan(s), address critical lifts, perform evaluation of construction loads by equipment and storage of materials during construction, etc.


Proposed project will be competitive, firm-fixed priced, construction only contract procured in accordance with FAR 15, Best Value Tradeoff Method. This is an "Unrestricted" acquisition.


In accordance with FAR 36/DFARs 236, the magnitude construction cost price range for this project is : $1,000,000-$5,000,000 Million.


Estimated duration of the project is TBD.


The North American Industry Classification System code for this procurement is 237310 which has a small business size standard of $36.5M.


Anticipated solicitation issuance date is on or about 28 May 2018, and estimated proposal due date will be on or about 30 June 2018.

Attachments

Files attached to this notice, newest first
File Type Posted
Sign_In_Sheet_for_Marion_Site_Visit.pdf PDF
W912BV18R0039_Amendment_01.pdf PDF
(3)Marion_Replace_Spillway_Bridge_FY18_RTA_Specs_7-26-18.pdf PDF
ReplaceSpillwayBridge-FY18_RTA-Plans.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity