Replace ETF-B Exhaust Medium Voltage Switchgear
Awarded Award Notice Posted
- Solicitation number
- FA9101-16-R-0069
- Agency
- Air Force Test Center Air Force Materiel Command, Department of Defense
- Awarded
- to Siemens Industry Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA9101-17-C-0008 Federal contract award
- NAICS code
- 221121 Electric Bulk Power Transmission and Control
- PSC
- Not on record
- Place of performance
- Arnold Engineering Development Complex (Aedc) - Arnold Arnold AFB, Tennessee 37389, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Sep 28, 2016 10:58 am
Arnold Engineering Development Complex (AEDC) intends to solicit, negotiate, and award a sole source contract to Siemens Energy, Inc., 1345 Ridgeland Parkway Suite 116 Alpharetta, GA 30004 for the design, equipment and installation required for replacement of medium voltage switchgear and primary unit substations.
The Building 879 medium voltage switchgear replacement project removes one 14 section, indoor 6.9kV metal-clad switchgear line-up and replace with one 16 section, indoor 6.9kV gas insulated switchgear gear line-up, for Building 879. Work consists of all equipment and installation required for replacement of medium voltage switchgear in Building 879. The GIS Switchgear shall be manufactured by Siemens, no substitutions will be accepted.
AEDC has the need to procure medium voltage switchgear that is reliable and safe. Gas Insulated Switchgear (GIS) is the latest technology that provides power without requiring personnel to be equipped with arc flash personal protective equipment (PPE) while operating or maintaining the GIS equipment.
Hours of industry wide research, competitive bidding, and accepted maintenance and reliability practice have resulted in the conclusion that Siemens AG Type 8DA10 Medium Voltage Gas Insulated Switchgear is the only switchgear that confines each of the three phases of power in three separate compartments.
This is a critical requirement from a safety standpoint and mitigates electrical fault severity to avoid costly shutdowns of the entire system.
With the isolation of the phases a factory-trained Siemens employee can remove the damaged phase and replace it with the identical part from a spare cubicle, and return the cubicle to service in a short amount of time.
In most cases this work can be completed with the remainder of the switchgear lineup still in service. If spares are available, a new enclosure could be installed from the spare cubicle but the entire lineup would be unavailable throughout the duration of the repair.
Attachments
| File | Type | Posted |
|---|---|---|
| J-A-.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity