Replace electrical breakers, smith hall, USCG academy, new london, CT project #8173326

Awarded Award Notice Posted

Solicitation number
HSCGG1-17-B-PFA005
Agency
Coast Guard Department of Homeland Security
Awarded
to Enfield Enterprises LLC
Set-aside
No set-aside

Opportunity facts

Contract number
HSCGG1-17-C-PFA005 Federal contract award
NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

Added: Feb 15, 2017 4:49 pm Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to remove existing circuit breakers and remanufacture and re-install the circuit breakers for the Main Distribution Switchgear in Smith Hall.

The project scope includes all labor, materials, equipment, transportation, supervision and disposal required to remove, remanufacture and replace rack-out circuit breakers in the 480V Main Distribution Switchgear, at Smith Hall. - (a) The project consists of all work necessary to remove and remanufacture (15) FM-25 600A frame rack-out circuit breaker, (3) FP-50 1600A frame rack-out circuit breakers and (1) 4000A frame rack-out circuit breaker residing in the 4000A Main Distribution Switchgear for Smith Hall. The rack-out circuit breakers are dated around 1972 and are in need of maintenance. It has been noted that the circuit breakers won't trip when manually released and are not likely to charge the springs for breaker closing. (b) Smith Hall is the science building at the USCG Academy. The electrical replacements will directly impact ongoing scientific experiments. Therefore, power outages are to be limited in duration during the replacement process. Replacement work is to take place during weekends or during after hour periods and must be completed prior to normal working hours (M-F: 0730-1600). The breakers shall be installed by licensed electricians, those qualified to perform power equipment replacement work and familiar with installing and operating draw-out circuit breakers.


Period of Performance: Breaker installation shall take place during off-hours and weekends so as not to disturb class work, labs and research. Estimated period of performance is a total of 19 weeks (including submittal time, lead time and install time), and is based on removal and installation of 5 breakers per visit with an approximate lead time of 3 weeks for breaker refurnishing. All work shall be completed no later than 21 April 2017.


 

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Replace electrical breakers, smith hall, USCG academy, new london, CT project #8173326 This notice · Latest Award Notice
Replace breakers at smith hall, USCG academy, new london, CT project #8173326 Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity