Repave South Summit Lake Campground

Awarded Award Notice Posted

Solicitation number
P16PS01941
Agency
National Park Service Department of the Interior
Awarded
to S.t.rhoades Construction Incorporated
Set-aside
Total Small Business

Opportunity facts

Contract number
INP16PC00209 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Added: Jul 07, 2016 6:29 pm Modified: Aug 17, 2016 7:28 pmTrack Changes REPAVEMENT OF SOUTH SUMMIT LAKE CAMPGROUND, LASSEN VOLCANIC NATIONAL PARK, SHASTA COUNTY, CALIFORNIA.



The National Park Service, Lassen Volcanic National Park, has a requirement for the re-pavement of the South Summit Lake Campground within the Summit Lake area of park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation.



Per FAR 36.204 the project range is estimated to be between $250,000 to $500,000.



The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.



This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered.



Award is subject to the availability of funding at the time of award. The work of this project consists of grinding or pulverizing the existing pavement of the roads and campsites in the South Summit Lake Campground. Re-grade using existing material and add base rock as needed. Compact surface and pave the campground loop roads with hot asphaltic concrete pavement (HACP) as shown in the solicitation documents. The three campground loops and part of the main road total approximately 3,60 linear feet, and approximately 49 campsite parking stalls are to be repaved.



A site tour may be arranged - see Section L for more information.



PROPOSAL MUST BE RECEIVED BY: 1600 PT, MONDAY, AUGUST 29, 2016.

Update #4 ·

Added: Jul 07, 2016 6:29 pm Modified: Aug 09, 2016 11:19 amTrack Changes REPAVEMENT OF SOUTH SUMMIT LAKE CAMPGROUND, LASSEN VOLCANIC NATIONAL PARK, SHASTA COUNTY, CALIFORNIA.



The National Park Service, Lassen Volcanic National Park, has a requirement for the re-pavement of the South Summit Lake Campground within the Summit Lake area of park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation.



Per FAR 36.204 the project range is estimated to be between $250,000 to $500,000.



The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.



This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered.



Award is subject to the availability of funding at the time of award. The work of this project consists of grinding or pulverizing the existing pavement of the roads and campsites in the South Summit Lake Campground. Re-grade using existing material and add base rock as needed. Compact surface and pave the campground loop roads with hot asphaltic concrete pavement (HACP) as shown in the solicitation documents. The three campground loops and part of the main road total approximately 3,60 linear feet, and approximately 49 campsite parking stalls are to be repaved.



A site tour may be arranged - see Section L for more information.



PROPOSAL MUST BE RECEIVED BY: 1600 PT, MONDAY, AUGUST 29, 2016.

Update #3 ·

Added: Jul 07, 2016 6:29 pm Modified: Aug 02, 2016 3:23 pmTrack Changes REPAVEMENT OF SOUTH SUMMIT LAKE CAMPGROUND, LASSEN VOLCANIC NATIONAL PARK, SHASTA COUNTY, CALIFORNIA.



The National Park Service, Lassen Volcanic National Park, has a requirement for the re-pavement of the South Summit Lake Campground within the Summit Lake area of park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation.



Per FAR 36.204 the project range is estimated to be between $250,000 to $500,000.



The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.



This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered.



Award is subject to the availability of funding at the time of award. The work of this project consists of grinding or pulverizing the existing pavement of the roads and campsites in the South Summit Lake Campground. Re-grade using existing material and add base rock as needed. Compact surface and pave the campground loop roads with hot asphaltic concrete pavement (HACP) as shown in the solicitation documents. The three campground loops and part of the main road total approximately 3,60 linear feet, and approximately 49 campsite parking stalls are to be repaved.



A site tour may be arranged - see Section L for more information.



PROPOSAL MUST BE RECEIVED BY: 1600 PT, MONDAY, AUGUST 29, 2016.

Update #2 ·

Added: Jul 07, 2016 6:29 pm Modified: Aug 01, 2016 12:38 pmTrack Changes REPAVEMENT OF SOUTH SUMMIT LAKE CAMPGROUND, LASSEN VOLCANIC NATIONAL PARK, SHASTA COUNTY, CALIFORNIA.



The National Park Service, Lassen Volcanic National Park, has a requirement for the re-pavement of the South Summit Lake Campground within the Summit Lake area of park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to this solicitation.



Per FAR 36.204 the project range is estimated to be between $250,000 to $500,000.



The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years.



This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered.



Award is subject to the availability of funding at the time of award. The work of this project consists of grinding or pulverizing the existing pavement of the roads and campsites in the South Summit Lake Campground. Re-grade using existing material and add base rock as needed. Compact surface and pave the campground loop roads with hot asphaltic concrete pavement (HACP) as shown in the solicitation documents. The three campground loops and part of the main road total approximately 3,60 linear feet, and approximately 49 campsite parking stalls are to be repaved.



A site tour may be arranged - see Section L for more information.



PROPOSAL MUST BE RECEIVED BY: 1600 PT, MONDAY, AUGUST 29, 2016.

Update #1 ·

Added: Jul 07, 2016 6:29 pm RFQ NO. P16PS01941

Pre-Solicitation Announcement



NATIONAL PARK SERVICE

LASSEN VOLCANIC NATIONAL PARK

REPAVEMENT OF SOUTH SUMMIT LAKE CAMPGROUND



The National Park Service (NPS) at has a requirement for the re-pavement of South Summit Lake Campground located at Lassen Volcanic National Park. The work shall include grinding or pulverizing the existing asphalt pavement of the roads and campsites in the South Summit Lake Campground. Re-grade using existing material and add base rock as needed. Compact surface and repave with new asphalt. Summit Lake is located fifteen miles inside the north entrance of the park. The three campground loops and part of the main road totaling approximately 3,600 linear feet and 16 feet wide, and 49 campsite parking stalls are to be repaved. The elevation is around 6,500 feet.



The work will also include grinding, planeing, or pulverizing the existing asphalt pavement of the access trails in the Manzanita Lake Campground. Re-grade using existing material to meet federal accessibility standards (ABAAS). Compact surface and repave with new asphalt. Manzanita Lake Campground is located about three miles inside the north entrance of the park. The trails connecting the three campground loops and the restrooms total approximately 773 linear feet and are to be repaved to a consistent 4 feet wide.



The Contractor shall provide all manpower, equipment, testing, and supplies to perform the repavement and related services as identified within the Statement of Work document and any additional documents or requirements. All work shall be performed in accordance with local, state, and federal laws for repavement. The Contractor shall obtain all necessary permits required to successfully complete the work.



The work under the base line item shall include mobilization, survey and staking, materials, and testing. The work shall also include pulverizing pavement consisting of pulverizing existing pavement as shown in the documents for main road and loops of South Summit Lake Campground. The work shall also include aggregate base consisting of providing and installing aggregate base per the documents. Grade and compact aggregate base and pulverized pavement material and prepare base for asphalt pavement on the main road and loop of South Summit Lake Campground. The work shall also include bituminous concrete pavement consisting of paving the main road and loop of South Summit Lake Campground with hot asphaltic concrete pavement (HACP) as shown in the documents.



The option line items under this contract include mobilization, survey and staking, materials testing, and work elements not included in other Bid Items for Loops C and D of South Summit Lake Campground. The work shall also include pulverizing existing pavement as shown in the documents for Loops C and D of South Summit Lake Campground. The work shall also include aggregate base consisting of providing and installing aggregate base per the documents. The work shall also include grade and compact aggregate base and pulverized pavement material and prepare base for asphalt pavement on Loops C and D of South Summit Lake Campground. The work shall also include bituminous concrete pavement consisting of Pave Loops C and D of South Summit Lake Campground with hot asphaltic concrete pavement (HACP) as shown in the documents.



Site work is anticipated to begin on or before September 13, 2016 and shall be completed no later than 60 days after contract award.



The North American Standard Industrial Classifications System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $36.5 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered.



The Request for Quotation (RFQ) will be available on July, 21, 2016 by electronic means only and can be downloaded along with all related attachments from the FedBizOpps website at http://www.fbo.gov or FedConnect: http://www.fedconnect.net. The RFQ will close 30 days from the actual date of issuance. The Contractor is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFQ.



An organized Site Visit has been scheduled and the date and time released with the solicitation.



The Government intends to award a single, fixed price contract. Award selection will be made on a Best Value determination made after consideration of price and factors other than price. Award is subject to the availability of funding at the time of award.



Interested parties may explore the Lassen Volcanic National Park website to acquaint themselves with the general area and to view park maps at http://www.nps.gov/lavo