5 versions

Update #5 · Latest ·

Added: Mar 02, 2010 5:50 pm Modified: Apr 14, 2010 7:16 pmTrack Changes Amendment No. 3 is now posted at www.fedconnect.net

RECOVERY - INTERAGENCY SITE PAVING. This procurement is being funded via the American Recovery and Reinvestment Act of 2009 (ARRA).

Work includes preparing an existing site, installing a storm drain system, an under drain, installing a water line, a hydrant, an overhead fill, placing and compacting crushed aggregate, paving with hot asphalt concrete and installing wheel stops and pavement markings. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Lake County, Lakeview District Office, Oregon. Estimated start work is May 1, 2010 and performance time is 30 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. Paper copies are no longer available. Estimated issue date is March 16, 2010. All responsible sources may submit an offer which will be considered.

Full or partial funding for requirements to be completed by resultant contract award(s) may utilize funds provided by the American Recovery and Reinvestment Act of 2009. Inclusion of unique provisions required to implement the Act, including those for significant reporting and transparency requirements by the successful offeror(s), will be required in any resultant contract. The Awardee will be subject to Section 1512(c) of the Recovery Act which requires each contractor to report on its use of Recovery Act funds under the awarded contract. These reports will be made available to the public.

Treasury Accounting Symbol for this project is TAS::14 1112::TAS

Update #4 ·

Added: Mar 02, 2010 5:50 pm Modified: Mar 19, 2010 12:27 pmTrack Changes Amendment No. 2 is now posted at www.fedconnect.net

RECOVERY - INTERAGENCY SITE PAVING. This procurement is being funded via the American Recovery and Reinvestment Act of 2009 (ARRA).

Work includes preparing an existing site, installing a storm drain system, an under drain, installing a water line, a hydrant, an overhead fill, placing and compacting crushed aggregate, paving with hot asphalt concrete and installing wheel stops and pavement markings. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Lake County, Lakeview District Office, Oregon. Estimated start work is May 1, 2010 and performance time is 30 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. Paper copies are no longer available. Estimated issue date is March 16, 2010. All responsible sources may submit an offer which will be considered.

Full or partial funding for requirements to be completed by resultant contract award(s) may utilize funds provided by the American Recovery and Reinvestment Act of 2009. Inclusion of unique provisions required to implement the Act, including those for significant reporting and transparency requirements by the successful offeror(s), will be required in any resultant contract. The Awardee will be subject to Section 1512(c) of the Recovery Act which requires each contractor to report on its use of Recovery Act funds under the awarded contract. These reports will be made available to the public.

Treasury Accounting Symbol for this project is TAS::14 1112::TAS

Update #3 ·

Added: Mar 02, 2010 5:50 pm Modified: Mar 19, 2010 12:09 pmTrack Changes Amendment No. 1 is now posted at www.fedconnect.net

This solicitation is now posted at www.fedconnect.net

RECOVERY - INTERAGENCY SITE PAVING. This procurement is being funded via the American Recovery and Reinvestment Act of 2009 (ARRA).

Work includes preparing an existing site, installing a storm drain system, an under drain, installing a water line, a hydrant, an overhead fill, placing and compacting crushed aggregate, paving with hot asphalt concrete and installing wheel stops and pavement markings. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Lake County, Lakeview District Office, Oregon. Estimated start work is May 1, 2010 and performance time is 30 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. Paper copies are no longer available. Estimated issue date is March 16, 2010. All responsible sources may submit an offer which will be considered.

Full or partial funding for requirements to be completed by resultant contract award(s) may utilize funds provided by the American Recovery and Reinvestment Act of 2009. Inclusion of unique provisions required to implement the Act, including those for significant reporting and transparency requirements by the successful offeror(s), will be required in any resultant contract. The Awardee will be subject to Section 1512(c) of the Recovery Act which requires each contractor to report on its use of Recovery Act funds under the awarded contract. These reports will be made available to the public.



Treasury Accounting Symbol for this project is TAS::14 1112::TAS

Update #2 ·

Added: Mar 02, 2010 5:50 pm Modified: Mar 16, 2010 6:41 pmTrack Changes LAKEVIEW INTERAGENCY SITE PAVING

Update #1 ·

Added: Mar 02, 2010 5:50 pm RECOVERY - INTERAGENCY SITE PAVING. This procurement is being funded via the American Recovery and Reinvestment Act of 2009 (ARRA).

Work includes preparing an existing site, installing a storm drain system, an under drain, installing a water line, a hydrant, an overhead fill, placing and compacting crushed aggregate, paving with hot asphalt concrete and installing wheel stops and pavement markings. Project price range is between $100,000 and $250,000. NAICS: 237310. Project site located at Lake County, Lakeview District Office, Oregon. Estimated start work is May 1, 2010 and performance time is 30 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. This solicitation will be posted electronically at www.fedconnect.net. Paper copies are no longer available. Estimated issue date is March 16, 2010. All responsible sources may submit an offer which will be considered.

Full or partial funding for requirements to be completed by resultant contract award(s) may utilize funds provided by the American Recovery and Reinvestment Act of 2009. Inclusion of unique provisions required to implement the Act, including those for significant reporting and transparency requirements by the successful offeror(s), will be required in any resultant contract. The Awardee will be subject to Section 1512(c) of the Recovery Act which requires each contractor to report on its use of Recovery Act funds under the awarded contract. These reports will be made available to the public.



Treasury Accounting Symbol for this project is TAS::14 1112::TAS

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity