RECOVERY-Brush Creek Utilities

Awarded Award Notice Posted

Solicitation number
AG-9702-S-10-0155
Agency
Operations Center Southwest Economic Recovery Operations, Department of Agriculture
Awarded
to North Star Construction & Engineering Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-9702-C-10-0061 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

Added: Apr 12, 2010 2:24 pm RECOVERY-This solicitationw as awarded under the authority of the Small Business Administration 8(a) Set-Aside Program



This notice is for information purposes only.



The project is located on the Plumas National Forest in California. Work shall consist of installing a complete replacement water distribution system on a historic existing work center compound including fishing out an existing pump, furnishing and installing a new submersible pump, new water mains, new service waterlines, conduit and pull boxes for fture conversion of the aboveground electric distribution and telephone systems, salvaging five fire hydrants from the existing system and capping those lines to maintain the function of the existing system, installing the five fire hydrants in the new system, trenching, clearing, and backfilling as described in the specifications and shown on the drawings. The project also includes installing electric components associated with the new pump. An old water well is to be abandoned (plugged). Other incidental work items included: base rock, asphalt for patching roadways where trenching requires cutting through existing pavement, connecting the new system into the existing system, installing a new backflow device, furnishing a pressure regulating valve and connecting the services to the existing buildings as shown and noted on the drawings. Option 1 adds electric and telephone conduits to work for four building services. Option 2 extends the existing water distribution line from the hydrant at the end of the line and adds electric and telephone conduit over a part of the total line. Work includes salvaging the fire hydrant at the end of the existing line and reinstalling it at the end of the new line. All work in Option 2 shall meet the specifications for the remainder of the contract.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity