Recovery - AZ PRA cach 10(2)
Awarded Award Notice Posted
- Solicitation number
- DTFH68-10-B-00008
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to Ledcor CMI Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH68-10-C-00017 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Canyon DeChelly National Monument P.O. Box 588 Chinle, Arizona 86503, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Added: Jun 01, 2010 4:13 pm Schedule C in the amount of $8,751,057.50 plus incentives in the amount of $295,939.88.
Update #3 ·
Added: Oct 16, 2009 5:12 pm
Modified: Mar 02, 2010 10:36 amTrack Changes
This solicitation will be advertised on an unrestricted basis (full and open) on or about March 5, 2010.
PROJECT DETAILS: The solicitation for this project will include 3 bid schedules, with the largest schedule being 10.48 miles of roadway. There will also be 3 options: (1) paved ditch repair on North Rim Spur Road; (2) Pavement overlay of the Thunderbird Lodge Parking Area; and (3) pavement overlay of the Cottonwood Campground. Estimated price range is between $6 and $12 million.
Principal work items for this project include: lump sum construction survey and staking; lump sum contractor testing; 5,100 m2 of clearing and grubbing; 3,350 m of removal of asphalt curb; 5,900 m3 of unclassified borrow; 3,900 m of ditch recondition; 103,400 m2 of 100 mm depth pulverizing; 19,500 of method 2 roadway aggregate; 38,600 tons of superpave pavement; 1,075 tons of minor hot asphalt concrete; 149 tons of prime coat; 138 tons of tack coat; 3,575 m of asphalt curb; 1,550 m of concrete curb and gutter; 1,250 m2 of asphalt paved ditches; 850 m2 of concrete sidewalk, 830 m of guardrail system; 35,330 m of barbed wire fence; 67 metal gates; 2250 hours of traffic control; and 115 m of handrail fixtures. All of the above along with associated removal of items, roadway excavation, subexcavation, asphalt pavement milling, pipe culverts, pavement markings; and traffic control items. All items are estimates and are subject to change.
Tentative advertisement date is March 5, 2010. The bid opening date will be approximately 30 days after the project is advertised.
PLEASE NOTE: The Invitation for Bid is expected to be available for download on or after March 5, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD AT NO COST IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. Other information regarding this solicitation will also be available at the above website.
Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360.
One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.
Update #2 ·
Added: Oct 16, 2009 5:12 pm
Modified: Oct 27, 2009 12:33 pmTrack Changes
THIS SOLICITATION HAS BEEN POSTPONED UNTIL FURTHER NOTICE. Please continue to check this website and WWW.CFLHD.GOV for further information.
PROJECT DETAILS: The solicitation for this project will include 3 bid schedules, with the largest schedule being 10.48 miles of roadway. There will also be 3 options: (1) paved ditch repair on North Rim Spur Road; (2) Pavement overlay of the Thunderbird Lodge Parking Area; and (3) pavement overlay of the Cottonwood Campground. Estimated price range is between $6 and $10 million.
Principal work items for this project include: lump sum construction survey and staking; lump sum contractor testing; 5,100 m2 of clearing and grubbing; 3,350 m of removal of asphalt curb; 5,900 m3 of unclassified borrow; 3,900 m of ditch recondition; 103,400 m2 of 100 mm depth pulverizing; 19,500 of method 2 roadway aggregate; 38,600 tons of superpave pavement; 1,075 tons of minor hot asphalt concrete; 149 tons of prime coat; 138 tons of tack coat; 3,575 m of asphalt curb; 1,550 m of concrete curb and gutter; 1,250 m2 of asphalt paved ditches; 850 m2 of concrete sidewalk, 830 m of guardrail system; 35,330 m of barbed wire fence; 67 metal gates; 2250 hours of traffic control; and 115 m of handrail fixtures. All of the above along with associated removal of items, roadway excavation, subexcavation, asphalt pavement milling, pipe culverts, pavement markings; and traffic control items. All items are estimates and are subject to change.
Tentative advertisement date is November 10, 2009.
PLEASE NOTE: The Invitation for Bid is expected to be available for download on or after November 10, 2009, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. Other information regarding this solicitation will also be available at the above website.
Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360.
Update #1 ·
Added: Oct 16, 2009 5:12 pm
PROJECT DETAILS: The solicitation for this project will include 3 bid schedules, with the largest schedule being 10.48 miles of roadway. There will also be 3 options: (1) paved ditch repair on North Rim Spur Road; (2) Pavement overlay of the Thunderbird Lodge Parking Area; and (3) pavement overlay of the Cottonwood Campground. Estimated price range is between $6 and $10 million.
Principal work items for this project include: lump sum construction survey and staking; lump sum contractor testing; 5,100 m2 of clearing and grubbing; 3,350 m of removal of asphalt curb; 5,900 m3 of unclassified borrow; 3,900 m of ditch recondition; 103,400 m2 of 100 mm depth pulverizing; 19,500 of method 2 roadway aggregate; 38,600 tons of superpave pavement; 1,075 tons of minor hot asphalt concrete; 149 tons of prime coat; 138 tons of tack coat; 3,575 m of asphalt curb; 1,550 m of concrete curb and gutter; 1,250 m2 of asphalt paved ditches; 850 m2 of concrete sidewalk, 830 m of guardrail system; 35,330 m of barbed wire fence; 67 metal gates; 2250 hours of traffic control; and 115 m of handrail fixtures. All of the above along with associated removal of items, roadway excavation, subexcavation, asphalt pavement milling, pipe culverts, pavement markings; and traffic control items. All items are estimates and are subject to change.
Tentative advertisement date is November 10, 2009.
PLEASE NOTE: The Invitation for Bid is expected to be available for download on or after November 10, 2009, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. Other information regarding this solicitation will also be available at the above website.
Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360.
Attachments
| File | Type | Posted |
|---|---|---|
| CACHA001.pdf | ||
| IFB.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity