About this opportunity

The United States Department of Agriculture Agricultural Research Service is seeking a contractor to upgrade an existing power pole and electrical equipment at its Aquatic Animal Health Research Unit in Auburn, Alabama. The project requires installing a new pole and mounting structure, disconnecting and reconnecting power, upgrading electrical panels and breakers, and testing all systems. Quotes are due by December 8, 2023 and will be evaluated based on technical specifications and price. Award will be made to the lowest priced technically acceptable offer.

The opportunity is set aside for total small business and has a place of performance in Auburn, Alabama. The NAICS code is 238210 for electrical contractors and related services. The solicitation number is 12405B24Q0011 and seeks one offer to complete the pole upgrade within 60 days of award. The government estimates a budget between $50,000-$150,000 to replace one pole, electrical panels, and related infrastructure at the research facility.

Notice text

2 versions

Update #2 · Latest ·

Scope

A new pole with appropriate guide wires will be installed in the same location as the existing pole. Replacement of this pole will require the power supply to fish houses be disconnected. A temporary generator will need to be used to supply power to fish houses while repairs are being made.  A new mounting structure for the electrical equipment will also be installed in the same location as the existing mounting structure.  All work will conform to all relevant and enforceable electrical codes and industry standard practices for such installations. (PER ATTACHED SPECIFICATIONS)

•          Disconnect main overhead powerlines from the existing pole and isolate to provide a safe workplace.  Temporary power to the fish houses and water pumps will be provided by existing emergency generator.  Disconnect existing generator from the existing leaning pole and electrical equipment.  Move all electrical equipment, (panel, breakers, transfer switch, etc.) in the current location that is necessary to use to continue power supply to fish houses and pumps by the emergency generator from the existing pole and install on temporary pole at a location suitable for the Lab personnel.  

  • Energize emergency generator and temporary panel to the 5 fish houses and water pumps and test for reliability.

•          Remove old pole and install new pole of appropriate size.

•          Install/anchor guide pole with guide wire on opposite side of concrete slab.

•          Install guide wire from new power pole to new guide pole.

•          Upgrade structure holding the electrical panels and transfer switch with rust resistant metal or approved, electrical rated, commercial synthetic material components.

•          Remove and appropriately dispose of all old unused electrical boxes/equipment.

•          Upgrade electrical panel with new 400-amp, 44 space, outdoor panel, and new breakers.

•          Install new grounding rods as required by electrical code for new panel.

•          Install new wires and conduit from panel up to overhead lines.

•          All newly installed electrical connections and components (panels, breakers, etc.) on the new mounting structure, including existing transfer switch, must function properly and be accepted by Lab personnel after the emergency generator is re-hooked up to the new power pole.  Test emergency generator connection to the new pole to ensure that it’s operable.

Contractor will verify all dimensions and site conditions prior to beginning work. Contractor shall provide labor, specified materials, equipment, and tools required to perform the job fully and completely. 

Contractor will submit detailed submittals for approval by the site Research Leader prior to ordering and installing any equipment.  Installation of equipment will not interfere with research and will be always coordinated with the site Research Leader.

The contractor shall always be responsible for safeguarding all Government property and his work and ensuring the safety of his crew and ARS employees.  

The Contractor is required to secure their equipment and leave the site prior to lock down of the facility each day.  The premises shall be left in a clean, orderly, and acceptable condition.  The Government is not responsible for loss or damage to the Contractors’ equipment during the contract.

Government Furnished Property and Services

The Government shall provide, without cost, the materials and services listed below.

  • The Government will provide Utilities (power, water, etc.) where available
  • The Government will not provide any materials, equipment, or fuel
  • The Government will not provide any equipment or services

SITE VISIT scheduled for Monday, December 4, 2023, at 10:00 am.  Please contact Cecilia McNamee at cecilia.mcnamee@usda.gov for specifics.

Update #1 ·

Scope

A new pole with appropriate guide wires will be installed in the same location as the existing pole. Replacement of this pole will require the power supply to fish houses be disconnected. A temporary generator will need to be used to supply power to fish houses while repairs are being made.  A new mounting structure for the electrical equipment will also be installed in the same location as the existing mounting structure.  All work will conform to all relevant and enforceable electrical codes and industry standard practices for such installations. (PER ATTACHED SPECIFICATIONS)

•          Disconnect main overhead powerlines from the existing pole and isolate to provide a safe workplace.  Temporary power to the fish houses and water pumps will be provided by existing emergency generator.  Disconnect existing generator from the existing leaning pole and electrical equipment.  Move all electrical equipment, (panel, breakers, transfer switch, etc.) in the current location that is necessary to use to continue power supply to fish houses and pumps by the emergency generator from the existing pole and install on temporary pole at a location suitable for the Lab personnel.  

  • Energize emergency generator and temporary panel to the 5 fish houses and water pumps and test for reliability.

•          Remove old pole and install new pole of appropriate size.

•          Install/anchor guide pole with guide wire on opposite side of concrete slab.

•          Install guide wire from new power pole to new guide pole.

•          Upgrade structure holding the electrical panels and transfer switch with rust resistant metal or approved, electrical rated, commercial synthetic material components.

•          Remove and appropriately dispose of all old unused electrical boxes/equipment.

•          Upgrade electrical panel with new 400-amp, 44 space, outdoor panel, and new breakers.

•          Install new grounding rods as required by electrical code for new panel.

•          Install new wires and conduit from panel up to overhead lines.

•          All newly installed electrical connections and components (panels, breakers, etc.) on the new mounting structure, including existing transfer switch, must function properly and be accepted by Lab personnel after the emergency generator is re-hooked up to the new power pole.  Test emergency generator connection to the new pole to ensure that it’s operable.

Contractor will verify all dimensions and site conditions prior to beginning work. Contractor shall provide labor, specified materials, equipment, and tools required to perform the job fully and completely. 

Contractor will submit detailed submittals for approval by the site Research Leader prior to ordering and installing any equipment.  Installation of equipment will not interfere with research and will be always coordinated with the site Research Leader.

The contractor shall always be responsible for safeguarding all Government property and his work and ensuring the safety of his crew and ARS employees.  

The Contractor is required to secure their equipment and leave the site prior to lock down of the facility each day.  The premises shall be left in a clean, orderly, and acceptable condition.  The Government is not responsible for loss or damage to the Contractors’ equipment during the contract.

Government Furnished Property and Services

The Government shall provide, without cost, the materials and services listed below.

  • The Government will provide Utilities (power, water, etc.) where available
  • The Government will not provide any materials, equipment, or fuel
  • The Government will not provide any equipment or services

SITE VISIT scheduled for 11/6/2023 at 9:00 am.  Please contact Cecilia McNamee at cecilia.mcnamee@usda.gov for specifics.

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_12405B24Q0011.pdf PDF
IMG_0395.JPG JPG image
IMG_0392.JPG JPG image
IMG_0394.JPG JPG image
IMG_0393.JPG JPG image
SOW - Fish House Power Pole Upgrade - Aquatics Lab - EW Final.docx DOCX document
Beta Sam Solicitation.docx DOCX document
Clauses and Provisions.docx DOCX document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity