NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Council, Idaho 83612, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks road brushing services on the Payette and Boise National Forests in Idaho. The Forest Service is requesting the brushing of specific roads listed in the schedule of items, requiring the removal of materials under 6 inches in diameter from road edges and shoulders to specified widths and heights. Quotes are due by August 19, 2022 and will be evaluated for award of a contract to complete this brushing work between an estimated start date of August 26, 2022 through a finish date of July 1, 2023.

This is a total small business set-aside solicitation. The place of performance is in Council, Idaho, on the Payette and Boise National Forests. The contractor will be removing materials from road edges to widths of 5 feet from outside edge of shoulder or ditch and 3 feet from outside edge of shoulder on fill slopes, to a maximum height of 14 feet above the road surface. Clearing on inside edges of major curves will extend out to 8 feet and materials will be cut as close as practical to tree boles without scarring trees that remain.

Notice text


This solicitation is for the brushing of roads on the Payette and Boise NF in 2022. This
brushing will occur on all roads listed in the schedule of items. Upon completion of the road
brushing the roads will have had all material under 6” dia. removed from within 5’ of the outside
edge of the shoulder or ditch if it exists on the cutslope. All material under 6” dia. From within
3’ of the outside edge of the shoulder on the fill slope. Material will be removed up to a height
of 14’ above the road surface. Clearing on the inside edge of major curves will be extended out
to 8’. Cuts shall be as smooth and as close to the tree bole as practical. Care will be taken not to
scar trees that remain. All cut material will be removed from the drainage features and roadway.
Period of Performance:
Contract time begins on the effective date of the Notice to Proceed (NTP) and runs until the
appropriate number of calendar day’s elapse. Due to the late start date, road brushing will be
started as quickly after award of contract during fiscal year 2022 with the balance of all
unfinished work to be completed as soon as roads are clear in the spring months of 2023.
Estimated time to start work is August 26, 2022, with an estimated finish date of July 1, 2023.
Location: This work occurs in the East Fork of the Weiser River area on the Council Ranger
District of the Payette NF and Cascade area of the Boise NF See attached maps.

Attachments

Files attached to this notice, newest first
File Type Posted
1240LR22Q0131.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
PNF road brushing RFQ Award Award Notice
PNF road brushing RFQ This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity