Place of performance
The project area is located northeast of Pierce, Idaho in the Orogrande Creek watershed in Clearwater County. Access to project roads is by Usfs Road 250. From U.S. Highway 12, head north on State Highway 11, at Greer Junction. Travel north on State Highway 11 to Pierce, ID. Just as you are entering Pierce, turn right onto Usfs Road 250 the Pierce-Superior road. Travel on Usfs Road 250 for approximately 23 miles to the project location. Access to individual project roads is described on worklists and maps. Orofino, Idaho 83544, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Jun 28, 2016 4:12 pm

Seven Offers Received.

Update #2 ·

Added: Jun 02, 2016 11:11 am

CLOSE: 15 JUNE 2016, 2:30 PM LOCAL

Update #1 ·

Added: May 06, 2016 1:06 pm a. Scope of Contract. The Nez Perce-Clearwater National Forest decommissions roads to reduce erosion and landslide risks; protect and restore water quality, watershed function and condition; and improve soil productivity. This contract includes road decommissioning and related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.

b. Description of Work. The Middle Bugs Road Decommissioning project consists of decommissioning approximately 13 miles of road in the Orogrande Creek watershed using Roadway Obliteration Method I (recontour) and placing 4.6 miles of road into long-term storage using Roadway Obliteration Method II (outslope). Additional decommissioning and road maintenance may be determined and would be directed by the C.O. Road decommissioning treatments include drainage structure removal, decompaction, recontouring, strong outsloping and seeding of disturbed areas. All fill material and culverts in stream channel crossings and dry swales will be removed. Stream channels will be restored to natural grade and dimensions and grade control structures installed. Native vegetation, slash and duff material available on site will be transplanted to the decompacted and recontoured or outsloped roadway. Project roads include segments with gradients >25%, multiple fill and cutslope failures that require reconstruction for access, and deep fills. Trees greater than 20" DBH exist on some segments which may be worked around and preserved or may have to be removed for access or to ea.

Pre-Bid Tour. No pre-bid tour.


c. Start Work. It is estimated that work will begin on June 15, 2016. The contractor shall give 14 days notice prior to starting any ground disturbing work. All work must be completed no later than August 31, 2017.


 

Attachments

Files attached to this notice, newest first
File Type Posted
Nez_Perce-Clearwater_NF_-_Pine_Hook_Rd_Decomm_(AG-02RC-S-16-0064).doc DOC document
PineHookRdDecom_Worklists.docx DOCX document
PineHookRdDecom_AppendixA_Specifications.docx DOCX document
PineHookRdDecomProj_DrawingsAll.pdf PDF
PineHookRdDecomPreSolicitMapEast.jpg JPG image
PineHookRdDecomWestAreaPreSolicitMap.jpg JPG image