Pedestrian Bridge Relocation Project

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
W912DR-23-X-0UWC
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Adelphi, Maryland 20783, United States

Notice details come from SAM.gov. Updated .

Notice text

This Sources Sought is not a Request for Proposal, Request for Quote, or Invitation for Bid. There is no commitment by the Government to issue a solicitation, make awards, or pay for respondent's expenditures made in response to this notice.  Interested vendors are responsible for monitoring this notice for any subsequent amendments. All submissions become government property and will not be returned.  Any solicitation issued as a result of this notice will be in a separate announcement.  The purpose of this notice is to survey interest and obtain capability statements from industry.

BACKGROUND

The U.S. Army Corps of Engineers (USACE), Baltimore District is considering a requirement for construction services for the Anacostia Watershed Restoration, Prince George’s County – Site 13 Pedestrian Bridge Relocation Project.  The anticipated magnitude of construction is between $500,000 and $1,000,000.  The North American Industry Classification System (NAICS) code for this procurement is 237310 – “Highway, Street, and Bridge Construction”, which has a small business size standard of $45,000,000.00.  The jobsite is located north of Lyndon Street and West Park Avenue in the Adelphi Community Park. All access to the project site is from West Park Avenue. The proposed pedestrian bridge will be a replacement that is perpendicular to the stream on a riffle. The existing orientation is an angle to the direction of flow as such there a substantial instability of the stream around the bridge. The new orientation will improve stability and flow conveyance. A new paved trail is also proposed in the park to access the new pedestrian bridge.  Maps are available as an attachment to this notice.

PROJECT DESCRIPTION

This project involves demolishing the existing Pedestrian bridge over the Northwest Branch Anacostia and replacing the bridge with a new bridge to the west of the existing bridge. The proposed Pedestrian bridge will be a replacement that is perpendicular to the stream on a riffle. The existing orientation is an angle to the direction of flow as such there a substantial instability of the stream around the bridge. The new orientation will improve stability and flow conveyance. A new paved trail is also proposed in the park to access the new pedestrian bridge. The project area is north of Lyndon Street and West Park Avenue in the Adelphi Community Park. All access to the project site is from West Park Avenue.

Construction duration estimated to be 180 calendar days.

CAPABILITIES STATEMENT

Vendors interested in the potential procurement shall submit a brief capabilities statement no longer than ten pages.  The capabilities statement shall include the following.

1. Company name, address, point of contact, phone number, e-mail address, CAGE code, and UEI number.

2. Business size in relation to the NAICS, including small business category as applicable (e.g., woman-owned small business, service-disabled veteran-owned small business, etc.).

3. Confirmation of the ability to provide a letter from a surety company regarding the bonding capability for a single contract action and aggregate of the interested prime contractor.

4. Narrative with two to four relevant construction projects completed within the past ten years. Describe work performed as a prime or subcontractor, dollar value of the projects, and customer names.  The following are considered relevant to this project.

      a. Experience with the Federal Government submittal process.

          

     b. Experience in either the design, construction, and installation of steel bridges over water, or the procurement and installation        of prefabricated steel bridges over water. Demonstrate experience in any of the following areas as applicable:

  1. Utilizing a crane or multiple cranes in erecting bridges.

       2. Field splicing of prefabricated steel bridges.

       3. Shop and/or field welding of structures in accordance with AWS D1.1 and AWS D1.5.

       4. Erecting bridges on sites with difficult access or where limits of disturbance were kept very tight to minimize environmental                 impact.

      5. Demolition of existing steel bridges over water, demonstrating the ability to stage and/or contain demolition to minimize                      environmental impact.

  c. Successful experience in the design and construction of cast-in-place concrete abutments for bridges. Demonstrate experience    in any of the following areas as applicable:

  1. Design and construction of cast-in-place concrete bridge abutments utilizing shallow foundation elements.

       2. Design and construction of cast-in-place concrete bridge abutments utilizing deep foundation elements.

Email capabilities statement to Ms. Monique Jones, Contract Specialist at monique.l.jones@usace.army.mil and Mr. Ryan Fernandez, Contracting Officer at ryandale.r.fernandez@usace.army.mil no later than 12:00 PM Eastern Standard Time, March 22, 2023; reference Sources Sought W912DR-23-X-0UWC.  Submissions will be shared with the Government project delivery team, but otherwise will be held in strict confidence.  No feedback or evaluations will be provided to respondents regarding their submissions.  If you have any questions, contact Ms. Monique Jones by email.

Attachments

Files attached to this notice, newest first
File Type Posted
A.02.10 Sources Sought Drawings - 02-01-2023.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Pedestrian Bridge Relocation Project Latest solicitation Solicitation
Pedestrian Bridge Relocation Project Pre-Solicitation
Pedestrian Bridge Relocation Project This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity