Pad assembly, termin
Awarded Award Notice Posted
- Solicitation number
- SPE7M216R0002
- Agency
- Land and Maritime Defense Logistics Agency, Department of Defense
- Awarded
- to Kastalon Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- SPE7M216C0036 Federal contract award
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- PSC
- Not on record
- Place of performance
- Dla Land And Maritime 3990 E. Broad St. Columbus, Ohio 43218, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Mar 02, 2016 8:26 am
Federal Business Opportunities (FedBizOpps) Synopsis Information Form
1. ACTION CODE: (X ) P = Presolicitation ( ) M = Modification to a Previous Presolicitation Notice
2. CLASSIFICATION CODE: 1710
3. NAICS CODE: 336413
4. TITLE: PAD ASSEMBLY, TERMIN
5. RESPONSE DATE: 4-17-2016
6. PRIMARY POINT OF CONTACT: RYAN GULICK
7. SECONDARY POINT OF CONTACT:
8. SOLICITATION NUMBER: SPE7M216R0002
9. DESCRIPTION:
NSN(s): 1710-00-814-5903
Item Description:
PAD ASSEMBLY,TERMINAL IMPACT
END ITEM USE: DECK, AIRCRAFT CARRIER
NC BASIC 82N ALRE
CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL, REQUESTS
FOR VARIANCE (DEVIATION OR WAIVER) FEBRUARY 2015
1. REQUIREMENTS
A. THE CONFIGURATION CHANGE MANAGEMENT SECTION OF SAE EIA-649-1
CONFIGURATION MANAGEMENT REQUIREMENT FOR DEFENSE CONTRACTS, PARAGRAPH
3.3, SHALL BE USED FOR CONFIGURATION CONTROL OF MATERIAL PURCHASED UNDER
THIS CONTRACT.
B. FURNISHED ITEM(S) SHALL CONFORM TO THE APPROVED CONFIGURATION
REQUIREMENTS/REVISION SPECIFIED, UNLESS A PRE-PRODUCTION REQUEST FOR
VARIANCE (DEVIATION) OR A POST-PRODUCTION REQUEST FOR VARIANCE (WAIVER),
IS PROCESSED AND APPROVED AS PROVIDED BY PARAGRAPH 3. IN THIS STANDARD
TEXT OBJECT (STO). HEREAFTER, THE TERM #REQUEST FOR VARIANCE (RFV)#
WILL ALSO INCLUDE REQUESTS FOR DEVIATIONS AND WAIVERS.
2. THE DEFINITIONS FROM EIA-649-1 APPLY TO ITEMS BEING PROCURED UNDER
THIS SOLICITATION/CONTRACT, WITH THE FOLLOWING CLARIFICATION OF
DEVIATION & WAIVER:
A. PRE-PRODUCTION RFV (PREVIOUSLY KNOWN AS DEVIATION) REQUESTS
PERMISSION TO PRODUCE A PRODUCT THAT DOES NOT CONFORM TO CONTRACT
REQUIREMENTS/DOCUMENTATION FOR A LIMITED AMOUNT OF TIME AND FOR
SPECIFIED EFFECTIVITY. (A DEVIATION DIFFERS FROM AN ENGINEERING CHANGE
IN THAT AN APPROVED ENGINEERING CHANGE REQUIRES CORRESPONDING REVISION
OF THE ITEM'S CURRENT APPROVED CONFIGURATION DOCUMENTATION, WHEREAS A
DEVIATION DOES NOT.).
B. POST-PRODUCTION RFV (PREVIOUSLY KNOWN AS WAIVER) REQUESTS
APPROVAL OF PRODUCT FOUND DURING MANUFACTURE, OR AFTER HAVING BEEN
SUBMITTED FOR GOVERNMENT INSPECTION OR ACCEPTANCE, THAT DEPARTS FROM
SPECIFIED REQUIREMENTS, BUT NEVERTHELESS IS CONSIDERED SUITABLE FOR USE
"AS IS" OR AFTER REPAIR BY AN APPROVED METHOD.
3. CONTRACTOR RESPONSIBILITIES.
A. AN ENGINEERING CHANGE PROPOSAL (ECP) IS USED TO MAKE PERMANENT
CHANGES IN THE GOVERNMENT TECHNICAL DATA PACKAGE (TDP). PENDING
APPROVAL OF AN ECP, CONTRACTUAL RELIEF SHOULD BE REQUESTED IN WRITING BY
THE CONTRACTOR USING A RFV.
B. REFER TO FAR PART 48 VALUE ENGINEERING FOR COST SAVING
IMPROVEMENTS TO THE TECHNICAL DATA PACKAGE (TDP).
C. ALL ECPS SUBMITTED BY THE CONTRACTOR WILL BE DEEMED ROUTINE.
IF THE CONTRACTOR CONSIDERS AN ECP AS AN EMERGENCY OR URGENT; THEY
SHALL INCLUDE IN THEIR ECP SUBMITTAL AN EXPLANATION AND ALL APPLICABLE
SUPPORTING DOCUMENTATION. ALL ECPS WILL BE REVIEWED FOR A DETERMINATION
ON CRITICALITY, AND, IF CONCURRED TO BE AN EMERGENCY, THE APPROPRIATE
PROCESSING TIME-FRAME NEGOTIATED WITH THE ESAS WILL BE FOLLOWED AND THE
CONTRACTOR WILL BE NOTIFIED OF ANTICIPATED RESPONSE TIME.
D. FOR ECPS, SPECIFICATION CHANGE NOTICES (SCNS) OR RFV, THE
CONTRACTOR MUST SUBMIT THE APPLICABLE DOCUMENTATION LISTED IN
SUB-PARAGRAPHS D.(1) THROUGH D.(4)TO THE ADMINISTRATIVE CONTRACTING
OFFICER(ACO), WITH AN INFORMATION COPY TO THE PROCURING CONTRACTING
OFFICER (PCO). FAILURE TO SUBMIT A COMPLETE LEGIBLE PACKAGE MAY RESULT
IN RETURN OF THE ECP/RFV WITHOUT PROCESSING.
(1) DOCUMENTATION LISTED IN PARAGRAPH 3.3.1 (FOR ECPS), 3.3.2
(RFV), 3.3.3 (FOR SCNS) OR 3.3.4 (FOR NOTICES OF REVISION (NORS)) OF THE
LATEST REVISION OF EIA-649-1.
(2) DD FORM 1692 (CURRENT REVISION) FOR ECP.
(3) DD FORM 1694 (CURRENT REVISION) FOR RFV.
(4) DD FORM 1695 (CURRENT REVISION) FOR NOR.
4. DLA#S RESPONSIBILITIES:
A. UPON RECEIPT OF THE ECP OR RFV, THE PCO WILL ENSURE THAT THE
APPLICABLE PRODUCT SPECIALIST RECEIVES THE COPY FROM DCMA.
B. WITHIN FIVE (5) WORKING DAYS FROM THE DATE OF RECEIPT OF THE
CONTRACTOR'S ECP OR RFV FROM DCMA, THE PS MUST SUBMIT THE REQUESTS AND
ANY SUPPORTING DOCUMENTATION VIA A 339 TO THE APPROPRIATE ENGINEERING
SUPPORT ACTIVITY (ESA), WHEN APPLICABLE.
C. ROUTINE ECPS WILL BE PROCESSED WITHIN 90 DAYS FROM RECEIPT BY
THE ESA. RFVS WILL BE EVALUATED AND PROCESSED WITHIN 30 DAYS FROM
RECEIPT BY THE ESA OR AS NEGOTIATED WITH THE ESA.
(1) THE CONTRACTOR WILL BE NOTIFIED IN WRITING OF APPROVAL BY
THE RETURN OF AN APPROVED COPY OF THE ECP OR RFV. APPROVAL WILL BE
REFLECTED BY SIGNATURE OF THE CONTRACTING ACTIVITY OR A REVIEW ACTIVITY
SPECIFICALLY IDENTIFIED IN THE CONTRACT.
(2) THE CONTRACTOR WILL BE NOTIFIED IN WRITING OF DISAPPROVAL
INCLUDING REASON(S) FOR DISAPPROVAL.
5. FOR AN APPROVED RFV OR AN APPROVED ECP, WHEN THE REQUEST AFFECTS THE
CONTRACT, A MODIFICATION WILL BE ISSUED TO THE CONTRACT INCORPORATING
THE APPLICABLE REQUIREMENT CHANGES. ONLY A CONTRACTING OFFICER IS
AUTHORIZED TO ISSUE A MODIFICATION INCORPORATING THE APPROVED RFV AND/OR
ECP.
6. QUESTIONS REGARDING THE STATUS OF PREVIOUSLY SUBMITTED ECP OR RFV
SHOULD BE DIRECTED TO THE PCO.
7. THE SUBMISSION OF AN ECP OR RFV BY THE CONTRACTOR DOES NOT AFFECT
THE REQUIRED DELIVERY DATE OF THE CONTRACT. IF A DELIVERY DATE CHANGE
IS NEEDED, IT MUST BE NEGOTIATED WITH THE CONTRACTING OFFICER AND
DOCUMENTED VIA MODIFICATION TO THE CONTRACT.
8. THE PERIOD OF TIME FOR EVALUATION AND APPROVAL/DISAPPROVAL OF AN ECP
AND/OR A RFV, AS SPECIFIED IN PARAGRAPH 4. C., SHALL NOT CONSTITUTE
EXCUSABLE DELAY IN THE PERFORMANCE OF THIS CONTRACT BY THE CONTRACTOR OR
IN ANY WAY RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH THE CONTRACT
DELIVERY SCHEDULE. THE SUBMISSION OF AN ECP AND/OR RFV BY THE
CONTRACTOR SHALL NOT PRECLUDE THE GOVERNMENT FROM EXERCISING ITS RIGHTS
UNDER ANY CLAUSE OF THE CONTRACT. (END)
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
THIS MATERIAL MUST MEET NAVAIR AIRCRAFT LAUNCH &
RECOVERY EQUIPMENT TRACEABILITY REQUIREMENTS. BARE
ITEM MARKINGS SHALL BE IAW THE TECHNICAL DATA
DRAWINGS PROVIDED.
BARE ITEM MATERIAL SHALL BE MARKED WITH CONTRACT
NUMBER, NAWC CAGE, AND PART NUMBER UNLESS OTHERWISE
SPECIFICIED ON ASSOCIATED DRAWING. IF A CONFLICT
EXISTS WITH MARKING REQUIREMENTS OF THIS 82N ALRE/SE
ITEM, THE ASSOCIATED DRAWING REQUIREMENTS SHALL APPLY.
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED
DRAWING AND AS OF THE DATE OF THIS SOLICITATION
ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE
BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED
PART NUMBERS ARE PROVIDED, THE ITEMS
FURNISHED MUST MEET THE REQUIREMENTS OF THE
CITED DRAWING. OFFERORS WHO ARE INTERESTED IN
QUALIFYING THEIR PRODUCT FOR PURPOSE OF FUTURE
ACQUISITION MUST CONTACT THE COGNIZANT DESIGN
ACTIVITY SPECIFIED ON THE SOURCE CONTROLLED
DRAWING.
ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES
THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT
THIS TIME.
REMINDER: THIS IS A CRITICAL ITEM AND ALL
MAJOR AND MINOR WAIVER/DEVIATION REQUESTS MUST
BE FORWARDED TO THE DSCC CONTRACTING OFFICER WHO
WILL COORDINATE THE REVIEW AND APPROVAL THROUGH
THE RESPONSIBLE ENGINEERING SERVICE ACTIVITY.
KASTALON, INC. DBA KASTALON 2A197 P/N A000101C REV 0
IAW BASIC DRAWING NR 80020 408320
REVISION NR K DTD 07/10/2007
PART PIECE NUMBER: -4
IAW REFERENCE DRAWING NR 80020 MPR1212
REVISION NR R DTD 10/19/1990
PART PIECE NUMBER:
Unit of Issue: EA
Destination Information: INSPECTION AND ACCEPTANCE AT DESTINATION, FOB ORIGIN.
Delivery Schedule: 180 DAYS
All responsible sources may submit an offer/quote which shall be considered.
One or more of the items under this acquisition may be subject to an Agreement on Government Procurement approved and implemented in the United States by the Trade Agreements Act of 1979.
All offers shall be in the English language and in U.S. dollars.
All interested suppliers may submit an offer.
Based upon market research, the Government is not using the policies contained in Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested persons may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice
The Contracting Officer may utilize on-line Reverse Auctioning as a means of conducting price discussions under this solicitation. During the course of the on-line auction, offerors' proposed prices will be publicly disclosed to other offerors and anyone else having access to the on-line auction. This public disclosure is anonymous, meaning that each offeror's identity will be concealed from other offerors (although it will be known to the Government), and only generic identifiers will be used publicly for each offeror's proposed pricing (e.g., "Offeror A"). By submitting a proposal in response to the solicitation, offerors agree to participate in the Reverse Auction and that their prices may be publicly disclosed, including to other offerors, during the Reverse Auction. An offeror's final auction price will be considered its final proposal revision. No price revisions will be accepted after the close of the Reverse Auction, unless the Contracting Officer decides that further discussions are needed and final proposal revisions are again requested in accordance with FAR 15.307.
The solicitation will be available in FedBizOpps on its issue date of March 17th 2016.
Specifications, plans or drawings are not available.
This acquisition is for supplies for which the Government does not possess complete, unrestrictive technical data; therefore, the Government intends to solicit and contract with only approved sources under the authority of 10 U.S.C. 2304(c)(1). Approved sources are: CAGE 2A197 KASTALON
While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Pad assembly, termin | Award Notice | |
| Pad assembly, termin | Award Notice | |
| Pad assembly, termin | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity