NV FLAP US50(1) Round Hill Pines Access
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF22B000005
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Zephyr Cove, Nevada, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for a construction project located on US Route 50 near Zephyr Cove, Nevada. The Department of Transportation Federal Highway Administration seeks a contractor to widen US 50 and construct a new access road to the Round Hill Pines Beach Resort to increase safety and improve accessibility. The scope of work involves 0.34 miles of construction on US 50, including widening and resurfacing, and 0.13 miles of a new access road. The anticipated schedule runs from February 2022 for advertisement through contract award in April 2022 and completion in October 2022.
There is no set-aside designation for this project. Significant work quantities include 50,400 cubic yards of embankment construction, 2,850 tons of asphalt pavement, and 330 cubic yards of lean concrete backfill. The engineer's estimate is between $1 million and $5 million for this project, which will involve tree removal and coordination with a prior US Forest Service project. Surveys must also be conducted between March 1 and August 31 to identify and protect active bird nests if vegetation removal is necessary.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS PROJECT WILL BE ADVERTISED AS FULL AND OPEN COMPETITION WITH HUBZONE PRICE PREFERENCE.
PROJECT NUMBER: NV FLAP US50(1)
PROJECT NAME: Round Hill Pines Access
PROJECT DESCRIPTION: The NV FLAP US50(1), Round Hill Pines Access project is located approximately 0.5 miles south of Zephyr Cove, NV near Lake Tahoe. The project is proposing to widen US 50 and construct a new access road to the Round Hill Pines Beach Resort. The purpose of the project is to increase safety and improve accessibility for visitors entering and exiting the Round Hill Pines Beach Resort from US 50. The current US 50 entrance configuration into the Round Hill Pines Beach Resort has safety concerns due to the limited sight distance for vehicles traveling in both directions along US 50 and unprotected turning movements across US 50 for vehicles accessing the resort.
SCOPE OF THE WORK: The project consists of 0.34 miles of construction on US 50 and 0.13 miles of new entrance to the Round Hill Pines Beach Resort (Round Hill Pines Access Road). US 50 work includes widening to accommodate a median left turn lane and acceleration lane, as well as a mill and overlay of existing US 50. Round Hill Pines Access Road work involves new roadway construction of the access road between the new intersection with US 50 and the Forest Service parking area. Large fills up to approximately 30 feet are anticipated near the intersection of US 50 and the Round Hill Pines Access Road. Other improvements include roadway drainage improvements, signing, and striping.
SIGNIFICANT QUANTITIES:
- 20420-0000 Embankment Construction: 50,400 CUYD
- 40301-0100 Asphalt Concrete Pavement, Type 1: 2,850 TON
- 61401-0000 Lean Concrete Backfill: 330 CUYD
- 63506-0500 Temporary Traffic Control, Flagger: 3,500 HOUR
ANTICIPATED SCHEDULE:
- Advertisement: February 2022
- Contract Award: April 2022
- Notice to Proceed: April 2022
- Construction Complete: October 2022
ENGINEER’S ESTIMATE:
- The proposed project is estimated at a cost between $1 million and $5 million.
MISCELLANEOUS:
- Tree removals on United States Forest Service land are anticipated to occur prior to start of this project. The contractor will be responsible for disposal of removed trees from the project site.
- This project will tie into a United States Forest Service project that will be completed prior to start of this project.
- TRPA grading season for the project area is May 1 – October 15.
- The contractor will be required to provide a qualified biologist to conduct surveys in the construction limits for active bird nests within 10 days prior to vegetation removal from March 1 – August 31. If active nests are identified, notify the CO and delay vegetation removal.
Notice history
| Notice | Type | Posted |
|---|---|---|
| NV FLAP US50(1) Round Hill Pines Access | Award Notice | |
| NV FLAP US50(1) Round Hill Pines Access | Solicitation | |
| NV FLAP US50(1) Round Hill Pines Access | Pre-Solicitation | |
| NV FLAP US50(1) Round Hill Pines Access | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity