Nozzle, fuel injecti
Awarded Award Notice Posted
- Solicitation number
- FA8122-16-R-0024
- Agency
- AFLCMC Tinker AFB Lifecycle Management Center, Department of Defense
- Awarded
- to Parker-Hannifin Corporation
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA812217C0012 Federal contract award
- NAICS code
- 336412 Aircraft Engine and Engine Parts Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Jun 10, 2016 12:50 pm
Modified: Sep 20, 2016 1:02 pmTrack Changes
AMENDMENT 0001
THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE PROPOSAL DUE DATE BY 30 DAYS AS FOLLOWS DUE TO SYSTEMS ERROR BETWEEN ACPS AND FBO.
FROM: DUE DATE 23 SEPT 2016 @ 3:00PM CST
TO: DUE DATE 24 OCT 2016 @ 3:00PM CST
ALL OTHER TERMS AND CONDITIONS AS SET FORTH IN THE SOLICITATION HEREIN REMAIN IN FULL FORCE AND EFFECT.
PR Number(s): FD20301600683 Line Item: 0001 NSN: 2915013470854PR NOZZLE,FUEL INJECTI P/N: 1755M38P01, P/N: 1755M38P03, P/N: 6900031E1, P/N: 6900031E3, Description: Regulates fuel sprayed into the engine Supp. Description: Steel Quantity: 1.0000 EA Delivery: 15EA @ 45days ARO; 15ea e 15EA @ 45days ARO; 15ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 115.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0002 NSN: 2915013085486PR NOZZLE,FUEL INJECTI P/N: 9559M41G01, P/N: 9559M41G05, P/N: 6850093E01, P/N: 6850093E05, Description: The main fuel nozzle is designed to inject precisely metered fuel into combustion chamber of engine. Supp. Description: Steel Quantity: 1.0000 EA Delivery: 40ea @ 45days aro; 40ea e 40ea @ 45days aro; 40ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 430.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0003 Data Description: (0001) Data CONTRACT DATA REQUIREMENTS LISTS (CDRLs) IAW DD FORM 1423-1. THIS REQUIREMENT WILL NOT... Quantity: 1.0000 LO Delivery: DELIVER 1 UNIT(S) IAW THE DELIVER 1 UNIT(S) IAW THE STATEMENT OF WORK (SOW) PARA 2.1 REPORTING AND EXHIBIT 'A' CDRLS. Destn: SW3211,NA, , - . Quantity: 1.00 Unit of Issue: LO Duration of Contract Period: 2 year BASIC Electronic procedure will be used for this solicitation. This is expected to be export controlled. This is a CSI item. GFP will apply as GFM (repairable assets) Contractor must furnish all facilities, labor, tooling, material and equipment to perform all required repair and reporting. CondemnationS do not count as production. Parts that exceed present remanufacture and inspection limits shall be condemned at the contractor's facility and processed through Plant Clearance Automated Reutilization Screening System (PCARSS). To: Parker-Hannifin, , ., - .
Update #2 ·
Added: Jun 10, 2016 12:50 pm
Modified: Jun 13, 2016 12:23 pmTrack Changes
THS AMENDMENT 01 REVISE THE RESPONSE DATE:
FROM: 10 JUNE 2016
TO: 27 JUNE 2016
RESPONSE RETURN CUTOFF IS 3:00PM CST
PR Number(s): FD20301600683 Line Item: 0001 NSN: 2915013470854PR NOZZLE,FUEL INJECTI P/N: 1755M38P01, P/N: 1755M38P03, P/N: 6900031E1, P/N: 6900031E3, Description: Regulates fuel sprayed into the engine Supp. Description: Steel Quantity: 1.0000 EA Delivery: 15EA @ 45days ARO; 15ea e 15EA @ 45days ARO; 15ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 115.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0002 NSN: 2915013085486PR NOZZLE,FUEL INJECTI P/N: 9559M41G01, P/N: 9559M41G05, P/N: 6850093E01, P/N: 6850093E05, Description: The main fuel nozzle is designed to inject precisely metered fuel into combustion chamber of engine. Supp. Description: Steel Quantity: 1.0000 EA Delivery: 40ea @ 45days aro; 40ea e 40ea @ 45days aro; 40ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 430.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0003 Data Description: (0001) Data CONTRACT DATA REQUIREMENTS LISTS (CDRLs) IAW DD FORM 1423-1. THIS REQUIREMENT WILL NOT... Quantity: 1.0000 LO Delivery: DELIVER 1 UNIT(S) IAW THE DELIVER 1 UNIT(S) IAW THE STATEMENT OF WORK (SOW) PARA 2.1 REPORTING AND EXHIBIT 'A' CDRLS. Destn: SW3211,NA, , - . Quantity: 1.00 Unit of Issue: LO Duration of Contract Period: 2 year BASIC Electronic procedure will be used for this solicitation. This is expected to be export controlled. This is a CSI item. GFP will apply as GFM (repairable assets) Contractor must furnish all facilities, labor, tooling, material and equipment to perform all required repair and reporting. CondemnationS do not count as production. Parts that exceed present remanufacture and inspection limits shall be condemned at the contractor's facility and processed through Plant Clearance Automated Reutilization Screening System (PCARSS). To: Parker-Hannifin, , ., - .
Update #1 ·
Added: Jun 10, 2016 12:50 pm
PR Number(s): FD20301600683 Line Item: 0001 NSN: 2915013470854PR NOZZLE,FUEL INJECTI P/N: 1755M38P01, P/N: 1755M38P03, P/N: 6900031E1, P/N: 6900031E3, Description: Regulates fuel sprayed into the engine Supp. Description: Steel Quantity: 1.0000 EA
Delivery: 15EA @ 45days ARO; 15ea e 15EA @ 45days ARO; 15ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 115.00 Unit of Issue: EA
PR Number(s): FD20301600683 Line Item: 0002 NSN: 2915013085486PR NOZZLE,FUEL INJECTI P/N: 9559M41G01, P/N: 9559M41G05, P/N: 6850093E01, P/N: 6850093E05, Description: The main fuel nozzle is designed to inject precisely metered fuel into combustion chamber of engine. Supp. Description: Steel Quantity: 1.0000 EA
Delivery: 40ea @ 45days aro; 40ea e 40ea @ 45days aro; 40ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 430.00 Unit of Issue: EA
PR Number(s): FD20301600683 Line Item: 0003 Data
Description: (0001) Data CONTRACT DATA REQUIREMENTS LISTS (CDRLs) IAW DD FORM 1423-1. THIS REQUIREMENT WILL NOT... Quantity: 1.0000 LO
Delivery: DELIVER 1 UNIT(S) IAW THE DELIVER 1 UNIT(S) IAW THE STATEMENT OF WORK (SOW) PARA 2.1 REPORTING AND EXHIBIT 'A' CDRLS. Destn: SW3211,NA, , - . Quantity: 1.00 Unit of Issue: LO
Duration of Contract Period: 2 year BASIC
Electronic procedure will be used for this solicitation.
This is expected to be export controlled. This is a CSI item.
GFP will apply as GFM (repairable assets) Contractor must furnish all facilities, labor, tooling, material and equipment to perform all required repair and reporting.
CondemnationS do not count as production. Parts that exceed present remanufacture and inspection limits shall be condemned at the contractor's facility and processed through Plant Clearance Automated Reutilization Screening System (PCARSS).
To: Parker-Hannifin, , ., - .
Attachments
| File | Type | Posted |
|---|---|---|
| FA812216R0024_1774928_ATTACH.docx | DOCX document | |
| FA812216R0024_1831708_ATTACH.pdf | ||
| FA812216R0024_1774932_ATTACH.docx | DOCX document | |
| FA812216R0024_1781424_CDRL1_REPORT.pdf | ||
| FA812216R0024_1781479_ATTACH.pdf | ||
| FA812216R0024_1838456_PKGRQMT_REPORT.pdf | ||
| FA812216R0024_1838458_TRNSPDATA_REPORT.pdf | ||
| FA812216R0024_1781475_ATTACH.pdf | ||
| FA812216R0024.RTF | RTF text file | |
| FA812216R0024_1781473_ATTACH.pdf | ||
| FA812216R0024_1781477_ATTACH.pdf |
Show all 11
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity