Nozzle, fuel injecti

Awarded Award Notice Posted

Solicitation number
FA8122-16-R-0024
Agency
AFLCMC Tinker AFB Lifecycle Management Center, Department of Defense
Awarded
to Parker-Hannifin Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
FA812217C0012 Federal contract award
NAICS code
336412 Aircraft Engine and Engine Parts Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Jun 10, 2016 12:50 pm Modified: Sep 20, 2016 1:02 pmTrack Changes AMENDMENT 0001
THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE PROPOSAL DUE DATE BY 30 DAYS AS FOLLOWS DUE TO SYSTEMS ERROR BETWEEN ACPS AND FBO. 

FROM: DUE DATE 23 SEPT 2016 @ 3:00PM CST

TO: DUE DATE 24 OCT 2016 @ 3:00PM CST
 

ALL OTHER TERMS AND CONDITIONS AS SET FORTH IN THE SOLICITATION HEREIN REMAIN IN FULL FORCE AND EFFECT.  

PR Number(s): FD20301600683 Line Item: 0001 NSN: 2915013470854PR NOZZLE,FUEL INJECTI P/N: 1755M38P01, P/N: 1755M38P03, P/N: 6900031E1, P/N: 6900031E3, Description: Regulates fuel sprayed into the engine Supp. Description: Steel Quantity: 1.0000 EA Delivery: 15EA @ 45days ARO; 15ea e 15EA @ 45days ARO; 15ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 115.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0002 NSN: 2915013085486PR NOZZLE,FUEL INJECTI P/N: 9559M41G01, P/N: 9559M41G05, P/N: 6850093E01, P/N: 6850093E05, Description: The main fuel nozzle is designed to inject precisely metered fuel into combustion chamber of engine. Supp. Description: Steel Quantity: 1.0000 EA Delivery: 40ea @ 45days aro; 40ea e 40ea @ 45days aro; 40ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 430.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0003 Data Description: (0001) Data CONTRACT DATA REQUIREMENTS LISTS (CDRLs) IAW DD FORM 1423-1. THIS REQUIREMENT WILL NOT... Quantity: 1.0000 LO Delivery: DELIVER 1 UNIT(S) IAW THE DELIVER 1 UNIT(S) IAW THE STATEMENT OF WORK (SOW) PARA 2.1 REPORTING AND EXHIBIT 'A' CDRLS. Destn: SW3211,NA, , - . Quantity: 1.00 Unit of Issue: LO Duration of Contract Period: 2 year BASIC Electronic procedure will be used for this solicitation. This is expected to be export controlled. This is a CSI item. GFP will apply as GFM (repairable assets) Contractor must furnish all facilities, labor, tooling, material and equipment to perform all required repair and reporting. CondemnationS do not count as production. Parts that exceed present remanufacture and inspection limits shall be condemned at the contractor's facility and processed through Plant Clearance Automated Reutilization Screening System (PCARSS). To: Parker-Hannifin, , ., - .

Update #2 ·

Added: Jun 10, 2016 12:50 pm Modified: Jun 13, 2016 12:23 pmTrack Changes THS AMENDMENT 01 REVISE THE RESPONSE DATE:

FROM: 10 JUNE 2016
TO:      27 JUNE 2016

RESPONSE RETURN CUTOFF IS 3:00PM CST




PR Number(s): FD20301600683 Line Item: 0001 NSN: 2915013470854PR NOZZLE,FUEL INJECTI P/N: 1755M38P01, P/N: 1755M38P03, P/N: 6900031E1, P/N: 6900031E3, Description: Regulates fuel sprayed into the engine Supp. Description: Steel Quantity: 1.0000 EA Delivery: 15EA @ 45days ARO; 15ea e 15EA @ 45days ARO; 15ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 115.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0002 NSN: 2915013085486PR NOZZLE,FUEL INJECTI P/N: 9559M41G01, P/N: 9559M41G05, P/N: 6850093E01, P/N: 6850093E05, Description: The main fuel nozzle is designed to inject precisely metered fuel into combustion chamber of engine. Supp. Description: Steel Quantity: 1.0000 EA Delivery: 40ea @ 45days aro; 40ea e 40ea @ 45days aro; 40ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 430.00 Unit of Issue: EA PR Number(s): FD20301600683 Line Item: 0003 Data Description: (0001) Data CONTRACT DATA REQUIREMENTS LISTS (CDRLs) IAW DD FORM 1423-1. THIS REQUIREMENT WILL NOT... Quantity: 1.0000 LO Delivery: DELIVER 1 UNIT(S) IAW THE DELIVER 1 UNIT(S) IAW THE STATEMENT OF WORK (SOW) PARA 2.1 REPORTING AND EXHIBIT 'A' CDRLS. Destn: SW3211,NA, , - . Quantity: 1.00 Unit of Issue: LO Duration of Contract Period: 2 year BASIC Electronic procedure will be used for this solicitation. This is expected to be export controlled. This is a CSI item. GFP will apply as GFM (repairable assets) Contractor must furnish all facilities, labor, tooling, material and equipment to perform all required repair and reporting. CondemnationS do not count as production. Parts that exceed present remanufacture and inspection limits shall be condemned at the contractor's facility and processed through Plant Clearance Automated Reutilization Screening System (PCARSS). To: Parker-Hannifin, , ., - .

Update #1 ·

Added: Jun 10, 2016 12:50 pm PR Number(s): FD20301600683 Line Item: 0001 NSN: 2915013470854PR NOZZLE,FUEL INJECTI P/N: 1755M38P01, P/N: 1755M38P03, P/N: 6900031E1, P/N: 6900031E3, Description: Regulates fuel sprayed into the engine Supp. Description: Steel Quantity: 1.0000 EA

Delivery: 15EA @ 45days ARO; 15ea e 15EA @ 45days ARO; 15ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 115.00 Unit of Issue: EA

PR Number(s): FD20301600683 Line Item: 0002 NSN: 2915013085486PR NOZZLE,FUEL INJECTI P/N: 9559M41G01, P/N: 9559M41G05, P/N: 6850093E01, P/N: 6850093E05, Description: The main fuel nozzle is designed to inject precisely metered fuel into combustion chamber of engine. Supp. Description: Steel Quantity: 1.0000 EA

Delivery: 40ea @ 45days aro; 40ea e 40ea @ 45days aro; 40ea every 30days thereafter. Destn: SW3211,NA, , - . Quantity: 430.00 Unit of Issue: EA

PR Number(s): FD20301600683 Line Item: 0003 Data

Description: (0001) Data CONTRACT DATA REQUIREMENTS LISTS (CDRLs) IAW DD FORM 1423-1. THIS REQUIREMENT WILL NOT... Quantity: 1.0000 LO

Delivery: DELIVER 1 UNIT(S) IAW THE DELIVER 1 UNIT(S) IAW THE STATEMENT OF WORK (SOW) PARA 2.1 REPORTING AND EXHIBIT 'A' CDRLS. Destn: SW3211,NA, , - . Quantity: 1.00 Unit of Issue: LO

Duration of Contract Period: 2 year BASIC

Electronic procedure will be used for this solicitation.

This is expected to be export controlled. This is a CSI item.

GFP will apply as GFM (repairable assets) Contractor must furnish all facilities, labor, tooling, material and equipment to perform all required repair and reporting.

CondemnationS do not count as production. Parts that exceed present remanufacture and inspection limits shall be condemned at the contractor's facility and processed through Plant Clearance Automated Reutilization Screening System (PCARSS).

To: Parker-Hannifin, , ., - .

Attachments

Files attached to this notice, newest first
File Type Posted
FA812216R0024_1774928_ATTACH.docx DOCX document
FA812216R0024_1831708_ATTACH.pdf PDF
FA812216R0024_1774932_ATTACH.docx DOCX document
FA812216R0024_1781424_CDRL1_REPORT.pdf PDF
FA812216R0024_1781479_ATTACH.pdf PDF
FA812216R0024_1838456_PKGRQMT_REPORT.pdf PDF
FA812216R0024_1838458_TRNSPDATA_REPORT.pdf PDF
FA812216R0024_1781475_ATTACH.pdf PDF
FA812216R0024.RTF RTF text file
FA812216R0024_1781473_ATTACH.pdf PDF
FA812216R0024_1781477_ATTACH.pdf PDF
Show all 11

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity