North Branch Peshtigo River Culvert Replacement

Awarded Award Notice Posted

Solicitation number
AG-569R-S-16-0023
Agency
Region 9 - Eastern Region Forest Service, Department of Agriculture
Awarded
to Mahto Construction, Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG569RC160028 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
North Peshtigo River @ FR2174, Chequamegon-Nicolet National Forest, Forest County, WI Argonne, Wisconsin 54511, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: May 20, 2016 1:42 pm The Chequamegon-Nicolet National Forest announces an opportunity for the North Branch Peshtigo River Culvert Replacement project. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $25,000 and $100,000 for the total project. The applicable North American Industry Classification System (NAICS) Code is 237310. The Small Business Administration size standard is $36.5 million. Contractors are required to be actively registered with the System for Award Management (SAM). No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website, www.fbo.gov. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The project consists of removal and disposal of existing 3' diameter corrugated metal pipe. New installation of a 12' span x 4' rise x 48' pre-cast concrete box culvert with wing-walls and headwalls. Construction items shall include stream diversion, erosion control, aggregate fill, and all necessary miscellaneous tasks to complete the project in accordance with lines, grades, and elevations as shown in the plans, and identified in the contract drawings and specifications. Site visits may be coordinated by contacting CJ Cochrane at (715) 674-4481. Technical questions may also be directed to Mr. Cochrane.

Attachments

Files attached to this notice, newest first
File Type Posted
J2_-_Drawings_and_Maps.pdf PDF
J1_-_Specifications.docx DOCX document
AG-569R-S-16-0023.rtf RTF text file
J3_-_Davis_Bacon_Wage_Determination.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
North Branch Peshtigo River Culvert Replacement Latest Award Notice
North Branch Peshtigo River Culvert Replacement This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity