NM 152(1), NM 152 Bridges
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF20B000029
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- NM 87901 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for a bridge replacement project involving two bridges in New Mexico. The Department of Transportation Federal Highway Administration is seeking to replace Bridges 1520 and 1521, which were built in 1929 and are in need of replacement due to being single lane and geometrically obsolete. The new bridges will be constructed to accommodate two lanes of traffic as well as pedestrians, equestrians and bicyclists. Proposals are sought to remove the existing bridges, construct the new bridges using precast concrete girders, and perform related work like approach slabs and retaining walls. The evaluation criteria will focus on schedule, technical approach, and price. The deadline for questions is August 15th, with responses issued by August 22nd and proposals due by September 5th.
There is no set-aside designation for this project. The primary NAICS code is 237990 and PSC code is X2320. The bridges are located in New Mexico and the estimated value is between $5-10 million depending on technical approaches. Bridge 1520 will be a new location immediately downstream of the existing and will be 115 feet long, while Bridge 1521 will replace the existing in the same location and be 103 feet 6 inches long.
Notice text
The project is for bridge replacement of two (2) truss bridges. The bridges were built in 1929 and are single lane bridges. The existing bridges create a "bottleneck" and are geometrically obsolete in the sense that they are restricted in width and height. The new bridges are designed with increased width to accommodate two lanes of traffic, increased traffic load, pedestrians, equestrians, and bicyclists.
Schedule A: Bridge #1520 (east bridge) crosses Percha Creek. It will be constructed immediately downstream of the existing bridge, and the existing bridge will remain in place. The new bridge will have a curved deck supported by straight precast concrete girders. Length of the bridge will be 115 feet measured along the center line of roadway and will be founded on spread footings with 15-foot approach slab at both ends. Retaining walls will be constructed on the north side of the bridge to eliminate the encroachment on right of way and to retain parts of the historical trail.
Option X: The west bridge #1521 crosses Middle Percha Creek. The proposed bridge will be constructed in the same location of the existing bridge and the existing bridge will be removed. NM Bridge #1521 is located on a tangent, will have a length of 103 feet and 6 inches and will be founded on spread footings with 12-foot approach slab at both ends.
Specific items of work will include the following:
- Removal of bridge structure
- Precast, prestressed concrete girder (NM BT 63);
- Reinforcing steel
- Reinforcing steel, epoxy coated
- Bridge Railing, concrete
- Structure transition railing
- Reinforce concrete retaining wall
- Construct and maintain diversion
- Safety features
Notice history
| Notice | Type | Posted |
|---|---|---|
| NM 152(1), NM 152 Bridges | Award Notice | |
| NM 152(1), NM 152 Bridges | Solicitation | |
| NM 152(1), NM 152 Bridges | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity