Nimbus Dam Weir Access Stair

Closed Pre-Solicitation Posted

Solicitation number
140R2019Q0031
Agency
Bureau of Reclamation Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

Contract number
140R2019C0017 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Nimbus Dam Weir Access Stair
.

Update #4 ·

Nimbus Dam Weir Access Stair
.

Update #3 ·

Nimbus Dam Weir Access Stair
.

Update #2 ·

Nimbus Dam Weir Access Stair
.

Update #1 ·

The Mid-Pacific Region of the Bureau of Reclamation intends to issue a Request for quote for a firm fixed-price construction contract to design and size stairs to allow access from the top of Nimbus Dam to the Inspection Weir located down- stream at the face of the dam which is located north of Sacramento in Sacramento County at the Nimbus Dam site. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $36.5M. This procurement is a Total Small Business Set-Aside. This notice is not a request for quote and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this construction project is between $25,000.00 and $100,000.00.
Solicitation 140R2019Q0031 will be posted electronically via www.fedbizopps.gov on or about February 25, 2019. The date for receipt of quotes will be approximately March 15, 2019.
All quotations shall be submitted via e-mail to ryousefgoarji@usbr.gov ; no quotation shall be accepted via FBO/Fed Connect. The solicitation shall be downloaded at the above website; no paper copy of this solicitation will be distributed.
Prospective contractors MUST be actively registered in System for Award Management (SAM) database at https://www.sam.gov to be eligible for award.
Questions concerning this solicitation should be directed to Rosana Yousef Goarji at ryousefgoarji@usbr.gov.
PRINCIPAL COMPONENTS OF WORK:
Contractor shall furnish all labor, supervision, equipment, materials and incidentals necessary to perform the following work:
• Design and size stairs to allow access from the top of Nimbus Dam to the Inspection Weir located down- stream at the face of the dam.
• Survey and lay out the stair and landing locations on site based off of the submitted and approved drawings
• Excavate the concrete landing pad for construction per the Contractor submitted design documents.
• Provide and install concrete reinforcement and anchoring hardware (bolts, j-bolt, etc.) per design documents.
• Place concrete landing pad.
• etc, …..
.

Attachments

Files attached to this notice, newest first
File Type Posted
FedConnect File —

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity