Motor Control Center Replacement Fort Peck, MT
Awarded Award Notice Posted
- Solicitation number
- W9128f16R0021
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Awarded
- to Colstrip Electric, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9128F-16-C-0026 Federal contract award
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Fort Peck Dam Site Fort Peack, Montana 59223, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: May 17, 2016 6:56 pm
Update #1 ·
Added: Jan 08, 2016 3:01 pm
On or about 22 January 2016, this office will issue Request for Proposals for construction of the Replace Motor Control Center, Fort Peck Dam, MT. The solicitation will close on or about 23 February 2016.
This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION.
A site visit date and time will be issued with the advertisement package.
DO NOT submit requests for plans and specifications to the site visit personnel listed above. See ‘Obtaining Solicitation Documents' below.
_______________________________________________________________________________
Project Description: (Approx. quantities)
The purpose of this project is to replace approximately 13-480V Motor Control Centers and 9 - 480V power panels at the Fort Peck project in Fort Peck, MT. This involves removing the original panels and supplying, installing and connecting the new panels to the existing wiring. Additionally, the contractor maybe required to perform a settings analysis and shall provide and install new trip settings in accordance with operational, protection and arc-flash requirements. This work will be performed at Fort Peck project in Fort Peck, MT. Plant 1 was placed into service in 1950 with Plant 2 following in 1956. This project will be evaluated using the Best Value format based on the contractor's submitted proposal.
The estimated construction cost of this project is between $1,000,000 and $2,500,000. ______________________________________________________________________________
The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 580 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety.
Bidders (Offerors):
Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov).
Find solicitation announcement in Fed Biz Opps (www.fbo.gov)
1. Use the ‘Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities' (large arrow in the middle of the page) or use the ‘Opportunities' tab followed by the ‘Advanced Search' tab.
2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files' or from the ‘Packages' tab.
4. If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors' tab and then ‘Add me to Interested Vendors' link at the bottom of the page.
Questions regarding contractual matters should be made to: Matthew Hibbert 402 995 2480.
Commander
U.S. Army Engineer District, Omaha
ATTENTION: CENWO-CT-C
1616 Capitol Avenue
Omaha, NE 68102 4901
Attachments
| File | Type | Posted |
|---|---|---|
| MCC_Contract_Walk_Through_Schedule.doc | DOC document | |
| Am0003.pdf | ||
| Am0002.pdf | ||
| Am0001.pdf | ||
| Motor_Control_Center_Dwgs.pdf | ||
| Motor_Control_Center_Specs.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Motor Control Center Replacement Fort Peck, MT | Award Notice | |
| Motor Control Center | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity