Mobile Deployable Medical Shelters
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911YN20Q0003
- Agency
- Florida National Guard Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 314910 Textile Bag and Canvas Mills
- PSC
- 8340 Tents And Tarpaulins
- Place of performance
- Saint Augustine, Florida 32084, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Medical Deployable Shelter Requirements:
Minimum requirements: The system will have to include the following: a shelter with a liner and floor, power generation, Environmental Control Unit (ECU),with trailer that is HUMMVE towable.
The minimum requirements are listed below however, some small variances that do not affect the overall capabilities of the system would be acceptable.
a) Shelter minimum specifications- tan colored shelter with 400-600 Sq. ft., with a floor, black out capable doors and windows, ECU & electrical cable ports, liner,
ability to withstand winds of 50 mph and gusts up to 80 mph, and have a 4 person erecting detail be able to set up in 15 minutes or less.
b) Generator minimum specifications- Minimum 18kW of Prime Power at 60Hz frequency, with 110V outlets.
c) ECU minimum specifications-5 ton ECU with heating (10kW) and cooling (60,000 BTU).
d) Trailer minimum specifications-Tan HUMMV towable trailer with landing gear third wheel that can accommodate generator, ECU, and shelter.
e) Delivered within 90 days of the order being placed.
***52.232-18 Pending Funds availability, the government may increase order to two (2) units. IAW FAR 52.217-6 option for increased quanity and/or 52.217-7 option quanity separately priced.
Attaching Q&A set 1 on 12.13.2019 for Shelter technical question responses.
Attaching Q&A Set 2 on 12.20.2019 and extending Due Date to Jan 6, 2020 at 3PM.EST
Amendment 0001 attached moving Closing Date to 10 January 2020, 3PM.EST
Attaching Q&A set 3 on 1.3.2020 for Shelter technical question responses
Update #4 ·
Medical Deployable Shelter Requirements:
Minimum requirements: The system will have to include the following: a shelter with a liner and floor, power generation, Environmental Control Unit (ECU),with trailer that is HUMMVE towable.
The minimum requirements are listed below however, some small variances that do not affect the overall capabilities of the system would be acceptable.
a) Shelter minimum specifications- tan colored shelter with 400-600 Sq. ft., with a floor, black out capable doors and windows, ECU & electrical cable ports, liner,
ability to withstand winds of 50 mph and gusts up to 80 mph, and have a 4 person erecting detail be able to set up in 15 minutes or less.
b) Generator minimum specifications- Minimum 18kW of Prime Power at 60Hz frequency, with 110V outlets.
c) ECU minimum specifications-5 ton ECU with heating (10kW) and cooling (60,000 BTU).
d) Trailer minimum specifications-Tan HUMMV towable trailer with landing gear third wheel that can accommodate generator, ECU, and shelter.
e) Delivered within 90 days of the order being placed.
***52.232-18 Pending Funds availability, the government may increase order to two (2) units. IAW FAR 52.217-6 option for increased quanity and/or 52.217-7 option quanity separately priced.
Attaching Q&A set 1 on 12.13.2019 for Shelter technical question responses.
Attaching Q&A Set 2 on 12.20.2019 and extending Due Date to Jan 6, 2020 at 3PM.EST
Amendment 0001 attached moving Closing Date to 10 January 2020, 3PM.EST
Update #3 ·
Medical Deployable Shelter Requirements:
Minimum requirements: The system will have to include the following: a shelter with a liner and floor, power generation, Environmental Control Unit (ECU),with trailer that is HUMMVE towable.
The minimum requirements are listed below however, some small variances that do not affect the overall capabilities of the system would be acceptable.
a) Shelter minimum specifications- tan colored shelter with 400-600 Sq. ft., with a floor, black out capable doors and windows, ECU & electrical cable ports, liner,
ability to withstand winds of 50 mph and gusts up to 80 mph, and have a 4 person erecting detail be able to set up in 15 minutes or less.
b) Generator minimum specifications- Minimum 18kW of Prime Power at 60Hz frequency, with 110V outlets.
c) ECU minimum specifications-5 ton ECU with heating (10kW) and cooling (60,000 BTU).
d) Trailer minimum specifications-Tan HUMMV towable trailer with landing gear third wheel that can accommodate generator, ECU, and shelter.
e) Delivered within 60 days of the order being placed.
***52.232-18 Pending Funds availability, the government may increase order to two (2) units. IAW FAR 52.217-6 option for increased quanity and/or 52.217-7 option quanity separately priced.
Attaching Q&A set 1 on 12.13.2019 for Shelter technical question responses.
Attaching Q&A Set 2 on 12.20.2019 and extending Due Date to Jan 6, 2020 at 3PM.EST
Update #2 ·
Medical Deployable Shelter Requirements:
Minimum requirements: The system will have to include the following: a shelter with a liner and floor, power generation, Environmental Control Unit (ECU),with trailer that is HUMMVE towable.
The minimum requirements are listed below however, some small variances that do not affect the overall capabilities of the system would be acceptable.
a) Shelter minimum specifications- tan colored shelter with 400-600 Sq. ft., with a floor, black out capable doors and windows, ECU & electrical cable ports, liner,
ability to withstand winds of 50 mph and gusts up to 80 mph, and have a 4 person erecting detail be able to set up in 15 minutes or less.
b) Generator minimum specifications- Minimum 18kW of Prime Power at 60Hz frequency, with 110V outlets.
c) ECU minimum specifications-5 ton ECU with heating (10kW) and cooling (60,000 BTU).
d) Trailer minimum specifications-Tan HUMMV towable trailer with landing gear third wheel that can accommodate generator, ECU, and shelter.
e) Delivered within 60 days of the order being placed.
***52.232-18 Pending Funds availability, the government may increase order to two (2) units. IAW FAR 52.217-6 option for increased quanity and/or 52.217-7 option quanity separately priced.
Attaching Q&A set 1 on 12.13.2019 for Shelter technical question responses.
Update #1 ·
Medical Deployable Shelter Requirements:
Minimum requirements: The system will have to include the following: a shelter with a liner and floor, power generation, Environmental Control Unit (ECU),with trailer that is HUMMVE towable.
The minimum requirements are listed below however, some small variances that do not affect the overall capabilities of the system would be acceptable.
a) Shelter minimum specifications- tan colored shelter with 400-600 Sq. ft., with a floor, black out capable doors and windows, ECU & electrical cable ports, liner,
ability to withstand winds of 50 mph and gusts up to 80 mph, and have a 4 person erecting detail be able to set up in 15 minutes or less.
b) Generator minimum specifications- Minimum 18kW of Prime Power at 60Hz frequency, with 110V outlets.
c) ECU minimum specifications-5 ton ECU with heating (10kW) and cooling (60,000 BTU).
d) Trailer minimum specifications-Tan HUMMV towable trailer with landing gear third wheel that can accommodate generator, ECU, and shelter.
e) Delivered within 60 days of the order being placed.
***52.232-18 Pending Funds availability, the government may increase order to two (2) units. IAW FAR 52.217-6 option for increased quanity and/or 52.217-7 option quanity separately priced.
Attachments
| File | Type | Posted |
|---|---|---|
| STRUCTURE QUESTIONS (003).pdf | ||
| W911YN20Q00030001 Med Deploy Shelter-Mod.pdf | ||
| STRUCTURE QUESTIONS-2 (002).pdf | ||
| STRUCTURE QUESTIONS (002).pdf | ||
| W911YN20Q0003 Med Deploy Shelter.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mobile Deployable Medical Shelters | Award Notice | |
| Mobile Deployable Medical Shelters | Solicitation | |
| Mobile Deployable Medical Shelters | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity