Michigan River Bridge Replacement
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1240LT22R0056
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Walden, Colorado 80480, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service intends to solicit proposals to remove an existing temporary bridge and install a new single span steel beam superstructure with timber planking and micropile foundation on National Forest System Road 792.1 over the South Fork Michigan River near Gould, Colorado. Interested vendors must attend a mandatory site visit on May 20, 2022 to view the project location prior to the anticipated solicitation release in late May 2022. The solicitation documents will include plans, specifications, and evaluation criteria. Proposals will be due by June 15, 2022.
This requirement has been set aside for total small business participation. The primary NAICS code is 237990 and PSC code R499, with an anticipated award value between $250,000-$500,000. The contract performance period will be from July 5, 2022 through September 30, 2023. Interested parties must monitor the designated website for any amendments and ensure registration in SAM.gov.
Notice text
2 versions
Update #2 · Latest ·
UPDATE - SITE VISIT is being rescheduled due to upcoming snow in the forecast. The new date for the site visit is Thursday, May 26, 2022 at 10:00 a.m.
PRESOLICITATION and SITE VISIT
This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the Michigan River Bridge Replacement project. The Medicine Bow-Routt National Forests and Thunder Basin National Grassland intends to issue a solicitation for the removal of a temporary ACROW bridge single reinforced single land truss bridge and install a single span steel beam superstructure with timber running planks and micropile foundation on National Forest System Road (NFSR) 792.1 -0.1 over South Fork Michigan River near Gould in Jackson County, Colorado (latitude 40.501970°, longitude -106.022007°).
A site visit is being conducted prior to solicitation as the site is expected to be inaccessible prior to the actual solicitation and award of the project. This is not a solicitation and in no way commits the Government to award a contract. The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective vendors may see the site and proposed work prior to heavy snowfall and issuing the solicitation. This solicitation is anticipated to be issued in May of 2022.
The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance.
A site visit is planned prior to issuance of the solicitation.
Date: May 20, 2022
Time: 10:00 a.m. MT
Location: Michigan River Bridge
Project Location: The Michigan River Bridge located on National Forest System Road 792.1, south of Highway 14 near Gould, Colorado.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000.
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.
Place of Contract Performance:
Gould ,Colorado in Jackson County
Estimated Period of performance:
July 5, 2022 to September 30, 2023
Update #1 ·
PRESOLICITATION and SITE VISIT
This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the Michigan River Bridge Replacement project. The Medicine Bow-Routt National Forests and Thunder Basin National Grassland intends to issue a solicitation for the removal of a temporary ACROW bridge single reinforced single land truss bridge and install a single span steel beam superstructure with timber running planks and micropile foundation on National Forest System Road (NFSR) 792.1 -0.1 over South Fork Michigan River near Gould in Jackson County, Colorado (latitude 40.501970°, longitude -106.022007°).
A site visit is being conducted prior to solicitation as the site is expected to be inaccessible prior to the actual solicitation and award of the project. This is not a solicitation and in no way commits the Government to award a contract. The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective vendors may see the site and proposed work prior to heavy snowfall and issuing the solicitation. This solicitation is anticipated to be issued in May of 2022.
The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance.
A site visit is planned prior to issuance of the solicitation.
Date: May 20, 2022
Time: 10:00 a.m. MT
Location: Michigan River Bridge
Project Location: The Michigan River Bridge located on National Forest System Road 792.1, south of Highway 14 near Gould, Colorado.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000.
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.
Place of Contract Performance:
Gould ,Colorado in Jackson County
Estimated Period of performance:
July 5, 2022 to September 30, 2023
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Michigan River Bridge Replacement Plans_Signed.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Michigan River Bridge Replacement | Award Notice | |
| Michigan River Bridge Replacement | Solicitation | |
| Michigan River Bridge Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity