Mariposa Area Road Resurfacing
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 1240LT22R0055
- Agency
- Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Pagosa Springs, Colorado 81147, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service Rocky Mountain Region will solicit proposals for the Mariposa Area Road Resurfacing project to conduct reconditioning and add aggregate surfacing to 8.68 miles of existing aggregate surface roads in the Mariposa area of the Pagosa Ranger District, Archuleta County, Colorado. Contractors must maintain traffic control at all times, keep haul roads open, and provide dust abatement as needed. Proposals are due May 20, 2022. The solicitation and associated drawings and specifications will be issued around April 27, 2022. Evaluation will consider technical approach, past performance, and price.
This requirement has been set aside for total small business and is estimated between $500,000 to $1,000,000. The work includes reconditioning, resurfacing, and compacting aggregate on segments of NFSR 024, NFSR 665 and NFSR 735 from June 27, 2022 to August 30, 2023. Contractors must register in SAM and be actively registered to submit proposals and be considered for award.
Notice text
2 versions
Update #2 · Latest ·
SITE VISIT INFORMATION
A site viisit is planned prior to issuance of the solicitation.
Date: May 17, 2022
Time: 10:00 a.m. MT
Location: Nipple Mountain Gravel Pit (1/4 mile beyond Beginning Mile Post of project. Gravel Pit is on the left side.
This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the Mariposa Area Road Resurfacing project. The intent of this project is to conduct reconditioning efforts and add aggregate surfacing to 8.68 miles of existing aggregate. Surface roads in the Mariposa area of the Pagosa Ranger District. All roads will remain open to public traffic during this contract. Traffic Control will be required at all times. All Forest Service haul roads shall be maintained concurrently in coordination with the COR and dust abatement may be required for haul road safety.
The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance.
Project Location: Pagosa Springs, CO in Archuleta County - From the Pagosa Ranger District Office, travel east on US Highway 160 for 0.5 miles. Turn right onto US-84e for 0.3 miles, turn left on Mill Creek Road. Continue for 6.7 miles then keep right on to NFSR 665. Follow 665 for 2 miles to the intersection of NFSR 029 where the project begins.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $500,000 and $1,000,000.
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.
Period of performance:
Estimated June 27, 2022 to August 30, 2023
Update #1 ·
This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the Mariposa Area Road Resurfacing project. The intent of this project is to conduct reconditioning efforts and add aggregate surfacing to 8.68 miles of existing aggregate. Surface roads in the Mariposa area of the Pagosa Ranger District. All roads will remain open to public traffic during this contract. Traffic Control will be required at all times. All Forest Service haul roads shall be maintained concurrently in coordination with the COR and dust abatement may be required for haul road safety.
The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance.
Project Location: Pagosa Springs, CO in Archuleta County - From the Pagosa Ranger District Office, travel east on US Highway 160 for 0.5 miles. Turn right onto US-84e for 0.3 miles, turn left on Mill Creek Road. Continue for 6.7 miles then keep right on to NFSR 665. Follow 665 for 2 miles to the intersection of NFSR 029 where the project begins.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $500,000 and $1,000,000.
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.
Period of performance:
Estimated June 27, 2022 to August 30, 2023
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment 2 - FS Supplemental Specs Mariposa.docx | DOCX document | |
| Attachment 1 - Plans and Drawings Mariposa.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mariposa Area Road Resurfacing | Solicitation | |
| Mariposa Area Road Resurfacing | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity