Maintenance dredging-l&r canal rehoboth beach
Closed Solicitation Posted
- Solicitation number
- W912BU22B0014
- Agency
- ENDIST Philadelphia US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks maintenance dredging services within the Lewes to Rehoboth Canal in Delaware. The U.S. Army Corps of Engineers Engineering District in Philadelphia requires the hydraulic dredging of approximately 50,000 cubic yards of sediment from Roosevelt Inlet to just south of the Savannah Road bridge, with dredged materials to be placed in upland disposal areas. The base contract work also includes sluice replacement and embankment improvements at the disposal areas. The period of performance for the base contract is 420 calendar days, with an additional 30 days possible if an option to dredge further south is exercised. Bids are due by November 2, 2022 and must be submitted through the System for Award Management website.
This procurement is set aside for small businesses. The primary NAICS code is 237990 and PSC code is D203. The estimated value ranges from $1 million to $5 million. Key details include dredging depths of -10 feet MLLW plus 1 foot overdepth between Roosevelt Inlet and Savannah Road, and -6 feet MLLW plus 1 foot overdepth for any optional work. The place of performance is within the Lewes to Rehoboth Canal in Delaware.
Notice text
4 versions
Update #4 · Latest ·
**********MAKE NOTE: AMENDMENT(S) 0001, 0002, 0003 and 0004 HAVE BEEN ADDED TO THIS SOLICITATION. BID DATE HAS CHANGED FROM 10.28.2022 TO 11.02.2022*************DO NOT STAPLE DOCUMENTS
Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.
Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.
Update #3 ·
**********MAKE NOTE: AMENDMENT(S) #001 & #002 & #0003 HAS BEEN ADDED TO THIS SOLICITATION. BID DATE HAS CHANGED FROM 10.28.2022 TO 11.02.2022*************
Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.
Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.
Update #2 ·
****************MAKE NOTE: AMENDMENT 001 HAS BEEN ADDED TO THIS SOLICITATION*************
Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.
Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.
Update #1 ·
Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.
Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.
Attachments
| File | Type | Posted |
|---|---|---|
| Abstract-W912BU22B0014.pdf | ||
| SF30_Amend004-W912BU22B0014.pdf | ||
| SF30_AMND003-22B0014.pdf | ||
| May2022_KTR_LIDAR_LEWES_Disposal2_5x5.txt | TXT text file | |
| May2022_KTR_LIDAR_LEWES_Disposal1_5x5.txt | TXT text file | |
| May2022_Lewes_Disposal1_NAVD88_Contours.pdf | ||
| May2022_Lewes_Disposal2_NAVD88_Contours.pdf | ||
| W912BU22B0014_Specs-AM0002.pdf | ||
| W912BU22B0014_Specs-AM0001.pdf | ||
| W912BU22B0014-DWGS.pdf | ||
| de12.txt | TXT text file | |
| de3.txt | TXT text file | |
| W912BU22B0014-Specs.pdf |
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| Maintenance dredging-l&r canal rehoboth beach | Solicitation | |
| Maintenance dredging-l&r canal rehoboth beach | Pre-Solicitation | |
| Maintenance dredging-l&r canal rehoboth beach | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity