Maintenance dredging-l&r canal rehoboth beach

Closed Solicitation Posted

Solicitation number
W912BU22B0014
Agency
ENDIST Philadelphia US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z1KF Maintenance Of Dredging Facilities
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks maintenance dredging services within the Lewes to Rehoboth Canal in Delaware. The U.S. Army Corps of Engineers Engineering District in Philadelphia requires the hydraulic dredging of approximately 50,000 cubic yards of sediment from Roosevelt Inlet to just south of the Savannah Road bridge, with dredged materials to be placed in upland disposal areas. The base contract work also includes sluice replacement and embankment improvements at the disposal areas. The period of performance for the base contract is 420 calendar days, with an additional 30 days possible if an option to dredge further south is exercised. Bids are due by November 2, 2022 and must be submitted through the System for Award Management website.

This procurement is set aside for small businesses. The primary NAICS code is 237990 and PSC code is D203. The estimated value ranges from $1 million to $5 million. Key details include dredging depths of -10 feet MLLW plus 1 foot overdepth between Roosevelt Inlet and Savannah Road, and -6 feet MLLW plus 1 foot overdepth for any optional work. The place of performance is within the Lewes to Rehoboth Canal in Delaware.

Notice text

4 versions

Update #4 · Latest ·

**********MAKE NOTE:  AMENDMENT(S) 0001, 0002, 0003 and 0004 HAVE BEEN ADDED TO THIS SOLICITATION. BID DATE HAS CHANGED FROM 10.28.2022 TO 11.02.2022*************DO NOT STAPLE DOCUMENTS

Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.

Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.

Update #3 ·

**********MAKE NOTE:  AMENDMENT(S) #001 & #002  & #0003 HAS BEEN ADDED TO THIS SOLICITATION. BID DATE HAS CHANGED FROM 10.28.2022 TO 11.02.2022*************

Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.

Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.

Update #2 ·

****************MAKE NOTE:  AMENDMENT 001 HAS BEEN ADDED TO THIS SOLICITATION*************

Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.

Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.

Update #1 ·

Contract work consists of maintenance dredging of approximately 50,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Roosevelt Inlet and just south of the Savannah Road bridge in Lewes, DE. There will be an Option to dredge just south the Rt 9 Bridge. Work includes hydraulic dredging with placement of the dredged material into one or both of the upland dredged material disposal areas in Lewes, DE between the canal and Cedar Street. Dredging between Roosevelt inlet and the Savannah Road Bridge will be to -10’ MLLW (Datum) plus 1’ allowable overdepth. Dredging below Savannah Road, including the Option, will be to -6’ MLLW (Datum) plus 1’ allowable overdepth. The base contract will also include sluice replacement and minor earthwork for embankment improvements at both disposal areas. The base contract period of performance is 420 calendar days with an additional 30 days added if Option 1 is awarded. This work will be advertised as an IFB, SBSA. Total Period of performance (PoP) will be 450 days. 420 days for the base and 30 additional days if the Option is awarded. If awarded, the Option will be awarded within 365 days of NTPs. Estimated cost range of the project is $1,000,000,000 to $5,000,000,000.

Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the official U.S. government website for people who make, receive, and manage federal awards. The website is (https://sam.gov ). Additional questions may be emailed to the Contract Specialist at zaquette.everett@usace.army.mil.

Attachments

Files attached to this notice, newest first
File Type Posted
Abstract-W912BU22B0014.pdf PDF
SF30_Amend004-W912BU22B0014.pdf PDF
SF30_AMND003-22B0014.pdf PDF
May2022_KTR_LIDAR_LEWES_Disposal2_5x5.txt TXT text file
May2022_KTR_LIDAR_LEWES_Disposal1_5x5.txt TXT text file
May2022_Lewes_Disposal1_NAVD88_Contours.pdf PDF
May2022_Lewes_Disposal2_NAVD88_Contours.pdf PDF
W912BU22B0014_Specs-AM0002.pdf PDF
W912BU22B0014_Specs-AM0001.pdf PDF
W912BU22B0014-DWGS.pdf PDF
de12.txt TXT text file
de3.txt TXT text file
W912BU22B0014-Specs.pdf PDF
Show all 13

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Maintenance dredging-l&r canal rehoboth beach This notice · Latest solicitation Solicitation
Maintenance dredging-l&r canal rehoboth beach Pre-Solicitation
Maintenance dredging-l&r canal rehoboth beach Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity