Laser Deposition System
Closed Pre-Solicitation Posted
- Solicitation number
- W56HZV-21-R-L021
- Agency
- TACOM Life Cycle Management Command Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333249 Other Industrial Machinery Manufacturing
- PSC
- 6640 Laboratory Equipment And Supplies
- Place of performance
- Warren Mi Usa
Notice details come from SAM.gov. Updated .
About this opportunity
The Combat Capabilities Command Ground Vehicle Systems Center's Materials Directorate Additive Manufacturing Team seeks to procure one laser deposition system. Key requirements for the system include a minimum build envelope of 0.23 cubic meters, laser head travel distance of 609 x 609 x 609 millimeters, and delivery within 12 months of order receipt. Responses to the pre-solicitation notice are requested by March 2, 2021 and should include details on relevant experience and any concerns supporting the requirement. The future solicitation is expected to utilize firm fixed price contracting for this requirement classified under NAICS code 333249.
There is no set-aside designation for this procurement. The projected period of performance is 12 months under the main NAICS code 333249, Other Industrial Machinery Manufacturing. Respondents are requested to confirm if their equipment meets requirements such as a 2-3 Kilowatt laser, inert gas capabilities, safety enclosures, and modular tables with 500 Kilogram capacities. The agency intends to issue follow-on requests for proposals or sources sought notices to qualified vendors by summer 2021.
Notice text
On behalf of the Ground Vehicle Systems Center’s Materials Directorate – Additive Manufacturing Team (GVSC MD AM), ACC-DTA is conducting market research to understand capabilities related to the below requirement:
Scope:
This supplies Performance Work Statement (PWS) establishes the requirements for one Laser Deposition System for the GVSC MD AM Team. This requirement is to provide one Laser Deposition System that meets the below listed dimensions and requirements.
Product Office: Combat Capabilities Command Ground Vehicle Systems Center’s (CCDC GVSC) Materials Directorate Additive Manufacturing (AM) team
NAICS: 333249, Other Industrial Machinery Manufacturing
Period of Performance: 12 months after receipt of order
Type: Firm Fixed Price (FFP)
Set-Aside: TBD
Extent of Competition: TBD
------------------------------------------------------------------------------------------------------------------------------------------
REQUEST FOR INFORMATION
Please review the above and previous contract and respond to the following questions (Negative responses are requested):
- Is your equipment designed for 480V, three-phase power supply?
- Does your equipment have a 2 or 3 Kilowatt (KW) IPG Fiber Laser with chiller?
- Does the equipment include a built in Uninterruptible Power Supply (UPS)?
- Is the equipment capable of operating in dual modes of both nitrogen and argon?
- Is the deposition process and laser operations contained in a hermetically sealed Class 1 laser enclosure for safety?
- Does the equipment contain a minimum build envelope of 0.23 cubic meters (m3)?
- Does the equipment contain a minimum laser head travel distance of 609 x 609 x 609 millimeters (mm)?
- Does the equipment have an antechamber, with a minimum size of 375 mm diameter, which allows passing smaller tools and materials into the main chamber while maintaining inert atmosphere?
- Is the equipment capable of five (5) axis; computer numerical control (CNC) controlled motion?
- Does the equipment have a modular heavy-duty (500 Kilograms capacity) tilt and rotating table for the workplace?
- Does the equipment provide a tool path generator for use with the control system?
- Does the equipment have a large front door for accessing the main chamber with minimum dimensions of 1333 x 1524 mm?
- Does the equipment have a viewing window for process observation that is laser safe?
- Does the equipment have a fume collection system?
- Is the equipment Nationally Recognized Testing Laboratory (NRTL) approved?
- Can the contractor guarantee delivery within 12 months after receipt of order (ARO) to Detroit Arsenal, MI?
* NOTE: Additionally, please provide a detailed description of previous experience your company has performing similar efforts as well as comments on any concerns your company may have supporting the requirement.
Please submit your responses to the questions above and any and all comments/questions prior to 5:00 PM EDT on 02 March 2021: Conner Fowler, email: jason.c.fowler8.civ@mail.mil
Attachments
| File | Type | Posted |
|---|---|---|
| RFI LDS.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity