IDAHO PANHANDLE NATIONAL FOREST / Sandpoint R. D. / Auxor Road Reconstruction
Awarded Award Notice Posted
A newer pre-solicitation was posted. See the latest pre-solicitation from .
- Solicitation number
- 12034319Q0010
- Agency
- Region 1 - Northern Region Forest Service, Department of Agriculture
- Awarded
- to Price Contracting Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 12034319C0062 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Sandpoint Ranger District Sandpoint, Idaho 83864, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Awarded Vendors: Price Contracting. Contract Award Dollar Amount: $151,340.00. Contract Award Date: 2019-08-20.
Update #4 ·
See attached RFQ 12034319Q0010 and attachments for additional information.
AUXOR ROAD RECONSTRUCTION
a)Description of Work. This project consists of reconstruction of 8.25 miles of road including Removal of Individual Trees 20 each, Roadside Clearing (Brushing), Construct 28 grade dips, Roadway Reconditioning for 0.90 miles and 7.35 miles of existing road will be Excavation, Embankment and Compaction by the mile to improve subgrade and drainage on a existing road, improve turnouts and construct two new turnouts. Clean the ditches, culverts and catch basins. Improve the tum around at the end of the road and place boulders. Placement and compaction of 360 cubic yards of surface aggregate. The aggregate will need to be hauled and placed on the road and obtained from a commercial source.
b) Project Location. This Project is located on the Sandpoint Ranger District and can be accessed from Sandpoint by taking HWY 200 East for approx. 26.3 miles and left onto Main Street and 0.5 miles to Lightning Creek Road tum left for 12.9 miles, beginning of the project Intersection FSR 489 Wellington Creek. LAT. N 48° 18' 12" LONG. W 116° 09' 55"
c) Price Range. The Government's estimate for the project is between $100,000 - $250,000
d) Pre-Bid Tour. No pre-bid tour is scheduled. The contractor is responsonsible to inspect the project site. For information contact Darrin Jackson, (w) 208-765-7264 or email: darrin.jackson@usda.gov.
e) Start Work. Proposed start of work is on or before August 12, 2019 and run continuosly until the end of the proejct, but no later than September 30, 2019.
.
Update #3 ·
This solicitation has been POSTPONED until further notice. Anticipated solicitation date is estimated to be posted on or before June 11, 2019.
PRE-SOLICITATION NOTICE
AUXOR ROAD
Description of Work. This project consists of reconstruction of 8.25 miles of road including Clearing and Grubbing 20 trees, Roadside Clearing (Brushing), Construct 28 grade dips, Roadway Reconditioning for 0.90 miles and 7.35 miles of existing road will be Excavation, Embankment and Compaction by the mile to improve subgrade and drainage on a existing road, improve turnouts and construct two new turnouts. Clean the ditches, culverts and catch basins. Improve the turn around at the end of the road and place boulders. Placement and compaction of 360 cubic yards of surface aggregate. The aggregate will need to be hauled and placed on the road and obtained from a commercial.
(a) Project Location. This Project is located on the Sandpoint Ranger District and can be accessed from Sandpoint by taking HWY 200 East for approx. 26.3 miles and left onto Main Street and 0.5 miles to Lightning Creek Road turn left for 12.9 miles, beginning of the project Intersection FSR 489 Wellington Creek. LAT. N 48° 18' 12" LONG. W 116° 09' 55".
(b) Price Range. Between $100,000 and $250,000.
(c) Pre-Bid Tour. There will be no formal pre-bid tour, nor will the Forest Service accompany prospective quoters to the project site. It is the offeror's responsibility to determine the actual site conditions by physical inspection of existing conditions.
(d) Pre-Bid Conference. None scheduled.
(e) Period of Performance: Work is anticipated to begin on August 12, 2019 through September 26, 2019. Contract time will start from the Notice to Proceed date.
One award shall be made in result from this solicitation for a Firm-Fixed Price contract.
The contractor shall submit to the Government one of the following payment protections upon notice of award:
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
The contractor shall furnish all bonds or alternative payment protection, including any necessary reinsurance agreements, before receiving a Notice to Proceed with the work or being allowed to start work.
.
Update #2 ·
This solicitation has been POSTPONED until further notice. Anticipated solicitation date is estimated for April, 2019. - Updated: 03/06/2019 (DVJ)
This Special Notice is for viewing opportunity of proposed project. Due to anticipated access conditions at the time of solicitation, this Fall 2018 may be the only time offerors have opportunity to see the proposed project site. There will be no formal scheduled site visit, nor will the Forest Service accompany prospective quoters to the project site. It is the offeror's responsibility to determine the actual site conditions by physical inspection of existing conditions.
The Idaho Panhandle National Forests, Sandpoint Ranger District anticipates soliciting for road improvement and drainage restoration on 9 miles of Auxor Basin Road 489. Estimated start work July 2019, Solicitation to be issued on or around March 15, 2019.
.
Update #1 ·
This Special Notice is for viewing opportunity of proposed project. Due to anticipated access conditions at the time of solicitation, this Fall 2018 may be the only time offerors have opportunity to see the proposed project site. There will be no formal scheduled site visit, nor will the Forest Service accompany prospective quoters to the project site. It is the offeror's responsibility to determine the actual site conditions by physical inspection of existing conditions.
The Idaho Panhandle National Forests, Sandpoint Ranger District anticipates soliciting for road improvement and drainage restoration on 9 miles of Auxor Basin Road 489. Estimated start work July 2019, Solicitation to be issued on or around March 15, 2019.
.
Attachments
| File | Type | Posted |
|---|---|---|
| RFQ_120343Q190010_Auxor_Road.pdf | ||
| J-2_Experience_Questionnaire.docx | DOCX document | |
| Exhibit_FSSS_Supplemental_Specs_AuxorRd.pdf | ||
| Exhibit-Project_Drawings_Signed.pdf | ||
| Wage_Determination.pdf | ||
| Exhibit_Typicals.pdf | ||
| ScopeWork.pdf | ||
| Maps.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Idaho Panhandle N. F. / Supervisor's Office / Purchase & Install Utility Service Body & Fire Command Pkge | Pre-Solicitation | |
| IDAHO PANHANDLE NATIONAL FOREST / Sandpoint R. D. / Auxor Road Reconstruction | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity