Install Warning Signs, McClellan-Kerr River System, Oklahoma
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912BV20R0069
- Agency
- ENDIST Tulsa US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Spiro OK 74959 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This notice seeks proposals to install warning signs along the McClellan-Kerr Arkansas River System in Oklahoma. The U.S. Army Corps of Engineers Tulsa District will award a firm-fixed price contract to purchase and install signs at WD Mayo Lock and Dam No. 14. Proposals will be evaluated using lowest price technically acceptable selection process. Proposers must be experienced in sign installation and have the ability to transport and store materials. Proposals are due by September 18, 2020.
There is no set-aside designated for this procurement. The primary NAICS code is 237990 for other heavy and civil engineering construction with a size standard of $39.5M. The estimated value of the construction is between $1,000,000 to $5,000,000 and shall be completed within 60 calendar days. Small businesses must perform at least 15% of the work cost, excluding materials, with their own employees to comply with limitations on subcontracting.
Notice text
The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to Install Warning Signs on MCK Waterways and Banks on the McClellan-Kerr Arkansas River System, Oklahoma. The proposed project will be a competitive, firm-fixed price, in accordance with FAR 15, Negotiated Procurement using the Lowest Price Technically Acceptable selection process.
The Government is seeking qualified, experienced sources capable of performing the following:
The scope includes work to be performed by the contractor to provide all necessary labor, equipment, materials, and supplies to purchase and install signs at WD Mayo L&D No. 14. Workmanship shall be of the highest grade and in accordance with the best modern practices to conform to the specifications for the item of work being furnished.
The Contractor shall field verify the locations and materials required for each sign location. All posts and supports shall be A572 Grade 50 steel. All steel shall be fabricated and galvanized prior to installation.
All mechanical fasteners used shall meet the criteria found in Corps of Engineers Sign Standards Manual, Volume 2: Section B: Materials & Specifications, Section B.13, Waterway Signs;
- Fastening hardware: stainless steel 302/304 (sign face to supporting structures);
- Fastening structural sub-components: A325 galvanized bolts, nuts, and washers etc.
- Aluminum: 6061-T6 plate (min 0.125”), 6061-T651 plate (0.250” and greater), angle and tubing (6061-T6);
- Galvanic isolation: silicone or bitumastic separator to negate corrosion.
Foundations for the signs include augured pier, spread footing, and post mount to structure.
Contractor will be responsible for transportation of all materials that shall be delivered to the site undamaged and stored out of contact with the ground. Materials that are damaged during the delivery or improper storage shall be replaced at no cost to the government.
In accordance with FAR 36.204, the estimated magnitude of construction for this project is: Between $1,000,000 and $5,000,000.
Estimated duration of the project is 60 calendar days.
The North American Industry Classification System code for this procurement is 237990, Other Heavy and Civil Engineering Construction. The size standard is $39.5M.
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement.
TYPE OF SET-ASIDE: This award is Full and Open, Unrestricted
Anticipated solicitation issuance date is on or about 20 August 2020, and the estimated proposal due date will be on or about 18 September 2020.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Install Warning Signs, McClellan-Kerr River System, Oklahoma | Award Notice | |
| Install Warning Signs, McClellan-Kerr River System, Oklahoma | Solicitation | |
| Install Warning Signs, McClellan-Kerr River System, Oklahoma | Pre-Solicitation | |
| Install Warning Signs, McClellan-Kerr River System, Oklahoma | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity