Hilfiker Wall Repairs Project, Sault Ste. Marie, MI

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
47PF0024R0042
Agency
Region 5 Public Buildings Service, General Services Administration
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2QA Repair Or Alteration Of Restoration Of Real Property (Public Or Private)
Place of performance
Sault Sainte Marie, Michigan 49783, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration Public Buildings Service Region 5 is seeking construction contractors to repair the Hilfiker mechanically stabilized earth retaining wall at the Land Port of Entry in Sault Sainte Marie, MI. The project will address issues such as bulging wire baskets, vertical and horizontal displacement, and an outward lean in the wall. The contractor will be required to construct a new earth retention soil nail wall, re-slope the concrete parking area, and provide an Environmental Product Declaration for proposed low embodied carbon concrete, cement, and steel materials that meet the Inflation Reduction Act's Global Warming Potential limits.

This contract opportunity is set aside for small businesses. Interested suppliers and manufacturers of low embodied carbon asphalt, concrete, cement, glass, and steel materials are invited to submit an Expression of Interest. The contract award value and timeline are not specified, but the project aims to fortify the wall and protect it from continued corrosion.

Notice text

2 versions

Update #2 · Latest ·

The Hilfiker mechanically stabilized earth retaining wall at the Land Port of Entry in Sault Sainte Marie, MI, has distress in the form of bulging welded wire baskets, vertical and horizontal displacement of the concrete on top of the wall, and an outward lean of the walls has been noted in the Hilfiker wall system for several years. This project will address the bulging wire baskets and outward lean of the wall as well as correct poor drainage that has contributed to the wall’s movement. The project will construct a new earth retention soil nail wall and re-slope the concrete parking area above the Hilfiker wall, fortifying the wall and protecting it from continued corrosion.

The construction contractor will be required to provide an Environmental Product Declaration (EPD) for its proposed low embodied carbon concrete (including cement) & steel (rebar) that meets the Global Warming Potential (GWP) limits.  See following link to Inflation Reduction Act Pilot Program: Interim IRA Low Embodied Carbon Materials Requirements and Interim IRA LEC Material Requirements Fact Sheet.  https://www.gsa.gov/system/files/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf

The Inflation Reduction Act of 2022 (IRA)

In addition to the construction opportunity reflected herein, GSA is seeking suppliers and manufacturers that are interested in supplying low embodied carbon asphalt, concrete (and cement), glass and steel materials for the project. Suppliers and manufacturers of materials meeting GSA’s Inflation Reduction Act Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements may submit an Expression of Interest to the contact below no later than May 18, 2024 04:30 pm EDT.

Expressions of Interest should indicate materials available and global warming potential values reflected in materials’ environmental product declarations. Submission of an expression of interest grants GSA your permission to publish your firm’s contact information and offerings for use by potential offerors on GSA construction requirements. Supplier and manufacturer contact information will be published in an informational amendment issued by GSA and, potentially, in other fora.

By participating in the competition, offerors consent to unrestricted GSA use of supplier names and the GWP values associated with supplier materials. Such information may be disclosed publicly or used to inform other low embodied carbon procurement activities. Technical solutions, supplier pricing, and supplier-offeror terms and conditions will not be shared. Any objection shall be transmitted to the Contracting Officer by the due date for offers and shall adhere to 41 C.F.R. § 105-60.601.

Market research resources for identifying qualifying materials may include, but are not limited to, ASTM International’s EPD Page, Building Transparency’s Embodied Carbon in Construction Calculator (EC3), ICC Evaluation Service’s EPD Directory, EPD International AB’s EPD Library, the National Asphalt Paving Association’s Emerald Eco-Label EPD Tool, the National Ready Mixed Concrete Association’s Concrete EPDs page, National Science Foundation's Search for EPDs tool, and Underwriters’ Laboratories SPOT product catalog. 


Note: The information provided herein is for informational purposes only and does not indicate or imply Federal endorsement of any organization, business, material or product. The Federal Government makes no representation or warranty concerning the quality, performance, availability or suitability of any organization, business, material or product.

Update #1 ·

The Hilfiker mechanically stabilized earth retaining wall at the Land Port of Entry in Sault Sainte Marie, MI, has distress in the form of bulging welded wire baskets, vertical and horizontal displacement of the concrete on top of the wall, and an outward lean of the walls has been noted in the Hilfiker wall system for several years. This project will address the bulging wire baskets and outward lean of the wall as well as correct poor drainage that has contributed to the wall’s movement. The project will construct a new earth retention soil nail wall and re-slope the concrete parking area above the Hilfiker wall, fortifying the wall and protecting it from continued corrosion.

The construction contractor will be required to provide an Environmental Product Declaration (EPD) for its proposed low embodied carbon concrete (including cement) & steel (rebar) that meets the Global Warming Potential (GWP) limits.  See following link to Inflation Reduction Act Pilot Program: Interim IRA Low Embodied Carbon Materials Requirements and Interim IRA LEC Material Requirements Fact Sheet.  https://www.gsa.gov/system/files/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf

The Inflation Reduction Act of 2022 (IRA)

In addition to the construction opportunity reflected herein, GSA is seeking suppliers and manufacturers that are interested in supplying low embodied carbon asphalt, concrete (and cement), glass and steel materials for the project. Suppliers and manufacturers of materials meeting GSA’s Inflation Reduction Act Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements may submit an Expression of Interest to the contact below no later than <<CO to insert date>>.

Expressions of Interest should indicate materials available and global warming potential values reflected in materials’ environmental product declarations. Submission of an expression of interest grants GSA your permission to publish your firm’s contact information and offerings for use by potential offerors on GSA construction requirements. Supplier and manufacturer contact information will be published in an informational amendment issued by GSA and, potentially, in other fora.

By participating in the competition, offerors consent to unrestricted GSA use of supplier names and the GWP values associated with supplier materials. Such information may be disclosed publicly or used to inform other low embodied carbon procurement activities. Technical solutions, supplier pricing, and supplier-offeror terms and conditions will not be shared. Any objection shall be transmitted to the Contracting Officer by the due date for offers and shall adhere to 41 C.F.R. § 105-60.601.

Market research resources for identifying qualifying materials may include, but are not limited to, ASTM International’s EPD Page, Building Transparency’s Embodied Carbon in Construction Calculator (EC3), ICC Evaluation Service’s EPD Directory, EPD International AB’s EPD Library, the National Asphalt Paving Association’s Emerald Eco-Label EPD Tool, the National Ready Mixed Concrete Association’s Concrete EPDs page, National Science Foundation's Search for EPDs tool, and Underwriters’ Laboratories SPOT product catalog. 


Note: The information provided herein is for informational purposes only and does not indicate or imply Federal endorsement of any organization, business, material or product. The Federal Government makes no representation or warranty concerning the quality, performance, availability or suitability of any organization, business, material or product.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Hilfiker Wall Repairs Project, Sault Ste. Marie, MI Award Award Notice
Hilfiker Wall Repairs Project, Sault Ste. Marie, MI Latest solicitation Solicitation
Hilfiker Wall Repairs Project, Sault Ste. Marie, MI This notice Pre-Solicitation
Hilfiker Wall Repairs Project, Sault Ste. Marie, MI Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity