Happy Camp North Burned Area Emergency Response

Awarded Award Notice Posted

Solicitation number
AG-9AC7-S-15-0026
Agency
Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
Awarded
to Kens Water Tender Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-9AC7-C-15-0012 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Happy Camp Ranger District Klamath National Forest Happy Camp, California 96039, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Oct 30, 2014 3:40 pm **PLEASE READ: THIS IS A PRE-SOLICITATION NOTICE. NO OTHER INFORMATION IS AVAILABLE UNTIL THE SOLICITATION IS ISSUED ON THE DATE IDENTIFIED BELOW**

Solicitation Documents: The solicitation will be issued as a Request for Proposals (RFP) under expedited procedures due to the urgent and compelling need to start work as soon as possible. The solicitation documents will be available electronically to download from this website on or about October 30, 2014


Description: The purpose of this project is to repair road infrastructure in the Frying Pan Ridge and Upper Elk Creek drainages area damaged during the Happy Camp Complex fire suppression efforts of in late summer 2014. The objective of Burned Area Emergency Response (BAER) efforts is to protect public safety and Forest Service investment in road infrastructure by restore traffic signs and improving road surface drainage. . This work includes constructing rolling dips, grading roads, cleaning ditches, reconditioning, repairing and cleaning existing drainage structures, installing new drop inlet covers, installing new culverts and installing flared end sections on existing culverts.
There is a Limited Operating Period (LOP) where no work shall commence on this project from October 15th to April 15th. The LOP is weather dependent and work can be performed on this project that falls within the LOP provided that the contractor (a) obtains Forest Service approval and (b) provided that the contractor monitors the weather and assures that the roads and slopes the contractor is working on will not be damaged due to erosion or storm events.


Location: The project sites are located along Forest Service roads within the Frying Pan Ridge and Upper Elk Creek drainages area of the Happy Camp Complex Fire perimeter which are on the Happy Camp Ranger District of the Klamath National Forest. The Project Roads are primarily approximately 5 miles south of Happy Camp, California. Happy Camp is approximately 70 miles west of Yreka, California. Refer to project location map for project roads and their locations.


Price Range: $250,000 - $500,000


Contract Time: Contract time for is 90 calendar days with an estimated notice to proceed date on or around November 17, 2014. In the event of a complete winter shutdown, all work on this project must be complete no later than August 15, 2015


Estimated Start Date: November 17 2014.


Pre-bid Site Visit: A site visit is not scheduled.


Set-Aside: This project is 100% set aside for HubZone small businesses.


Bonds: A Bid guarantee is required with the offer, bid guarantees will be allowed to be submitted electronically with the proposal with follow up of original. Payment and Performance Bonds for the full contract price will be required of the successful contractor and will need to be furnished within 5 days of award.


Response Location: Offers will be accepted at the Northern California Acquisition Service Area, Redding Office, located within the Shasta-Trinity National Forest Headquarters at 3644 Avtech Parkway, Redding, CA 96002 NO LATER than 4:00 p.m. PDT on date indicated on solicitation. Electronic submission is authorized on this project only.


SAM REGISTRATION REQUIREMENTS: Prospective contractors must be registered in the System for Award Management (SAM) prior to award. SAM is a consolidation of the former Central Contractor Registration (CCR) and On-line Representation and Certification Application (ORCA) databases.

Attachments

Files attached to this notice, newest first
File Type Posted
Happy_Camp_North_JOFOC.pdf PDF
A4_-_CA9 _mod_20 _dated_10.03.2014.pdf PDF
A2_-_PLANS-HC-NORTH-BAER.pdf PDF
AG-9AC7-S-15-0026_Solicitation.pdf PDF
A5_-_SF_24-98.pdf PDF
A1_-_Special_Project_Specs _HC_North_BAER.pdf PDF
A3_-_PAL_Fire_Plan_030613.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity