H356-- BASELINE ASBESTOS INSPECTION Government Response to Vendors Questions and Answers Quotes submission is extended to 06/04/2021 at 2:00 PM EST. Responders must provide written acknowlegemet of Amendedment
Closed Solicitation Posted
- Solicitation number
- 36C24721Q0739
- Agency
- Veterans Integrated Service Network 7 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 541350 Building Inspection Services
- Place of performance
- Department of Veterans Affairs Ralph H. Johnson VA Medical Center Charleston SC 29402, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Vendor Questions and Answers - RFQ 36C24721Q0739 - BASELINE ASBESTOS INSPECTION 1
I understand from the SOW that there are 2 (two) buildings included for the asbestos Inspections, is that correct? No, only Main Facility/Hospital
How many floors comprise each building? 5 floors not including basement
How many square feet comprise each building? 513,255 sf
Are crawl spaces included in the inspections? Yes
If so, what is the condition of each crawl space? It is tight, dirt floor, slopes, lots of piping, considered a non-permit confined space.
Is the sampling of the interior only? Yes, however it does have basement and above ceiling tiles.
Is there going to be a site visit offered prior to RFP being submitted? No
Because of the accelerated RFP schedule, I expect there will not be a site visit; can you give number of building, sizes, and construction dates, and dates of major renovation projects? No site visit prior see question #1 & 3
Are any roofs or crawlspaces included in this PWS? Yes crawlspace, not roofs.
The scope of work (SOW) mentions the buildings in Ralph H. Johnson VA Medical Center Campus but there is no list of total number of buildings and square footage of the buildings of the campus provided. Please provide the square footage of the buildings in the campus along with the list of buildings that need to be surveyed and sampled. Main Hospital only, see answer #1 and 3.
Please provide the date of construction of the buildings on the campus. 1965
Please provide a campus map of the locations with the building s name and location on the map. Provided only after award.
Please clarify that the Floor plans of the buildings will be provided to the successful bidder in PDF and Auto Cad format. Please provide maps and floor plans of the buildings to be surveyed prior to the bid to get a better idea of the facilities. Yes, these will be provided to COR by Engineering Department.
Please clarify the type of survey/sampling that needs to be performed by the contractor as the SOW mentions 3 different types of surveys (AHERA, ASHARA, and OSHA asbestos notification requirements) that needs to be fulfilled. The AHERA survey does not require quantification and sampling of non-friable materials and no exterior survey in the building whereas NESHAP requires survey and testing of all materials present in the building prior to the renovation/demolition activities whereas the OSHA only wants the materials that would be renovated or contacted by the workers to be tested prior to work. Is it AHERA or NESHAP survey that is required? A NESHAP survey would be very detailed and may not be feasible. Yes, NESHAP is what is needed. We need quantity to be included, description, condition, etc.
Please clarify if the contractor needs to survey and sample ceramic walls or floors along with patterned floor tiles in the hallways and labs and rooms as those cannot the sampled without damaging the material and all these materials cannot be filled with a filler etc. May have to sample patterned floor tile uncapacious technique. No to Ceramic Walls and Labs.
Please clarify if there are any confined spaces or permit-required confined spaces that the contractor needs to access during the survey. Yes, the basement/crawlspace is a non-permit confined space and we require a notification form upon entry not a permit.
Please clarify that all areas with radioactive materials, pathogen testing and testing areas containing virus storage and oxygen cylinders would not be required to be surveyed and sampled. The vendor will not be exposed to hazardous products during sampling, however we do have radiology department rooms that may need sampling but will ensure no exposure with safety escort to these areas and as a hospital there are also areas with BBP that will need testing, we will proved PPE against BBP if necessary and an escort. Do not foresee vendor being in area of exposure.
Please confirm that the contractor is not required to perform any survey and sampling of the elevators and elevator shafts, laundry chutes, dumb waiters and any waste chutes in the buildings. None of the above is required. We have already had the chutes and damper tested.
Please clarify that the contractor will be able to access all areas of the hospital without hinderance and if escort is needed, the escorts will be available for gaining access to any secured areas. See answer #20 below
Please confirm that the contractor will not be held responsible for wait times to enter the hospital areas and if any areas are inaccessible/locked or could not be accessed due to lack of escort, the VA would provide compensation in time and money to the contractor. The COR to the best of his/her ability will ensure areas can be access and when necessary escort is available for secure areas. However, an emergency or safety event may arise beyond COR control. Vendor shall preplan/coordinate with COR their weekly sampling schedule to ensure spaces are available. If still concerned and going to demand payment for any sort of delay, then recommend vendor built this into his quote.
Please clarify as to the thoroughness of the building records and the dates when the last surveys and abatements actions were undertaken. Can these records be made available for review prior to the submission of the quote? Upon awarded vendor will be given rights to all records.
Please confirm that if a previous survey or abatement record shows that the building does not contain any ACM or the ACM has been abated from a particular building, the inspector is not required to inspect that building. Yes, upon award vendor will have access to survey information.
Please confirm that the contractor must survey only the areas and materials in the building that have been shown as ACM in the previous report and the contractor does not need to survey the areas mentioned in the previous/baseline report. If a building is shown to have ACM only on 2 floors and the building has 7 floors, the contractor only needs to visit the two floors where the ACM has been mentioned. Not yet, the vendor will not be responsible for re-sampling of confirmed positive ACM.
Please clarify if the previous/baseline reports are in which format, e.g. word, excel etc. pdf
Please clarify if the material has been assumed as ACM in the previous/baseline survey reports provided by VA to the contractor, does the contractor needs to sample those assumed materials or can the contractor keep those as assumed in the updated report. We would like sampled no assumption unless homogeneous. Goal here is not exposure.
Please confirm that if a previous record mentions that the ACM has been abated/removed from a particular location from a building, the inspecting team is not required to sample the new replacement material installed in that area. Confirmed, replacement material not required to be sampled.
Please confirm that the inspecting contractor does not need to sample any materials that have been installed as replacement material in the buildings after the abatement of ACM. See #26 and especially not after start date of project.
Please clarify if there are any records that the materials installed in the hospital buildings in last few years (15 years or 10 years) are asbestos free and the contractor is not required to survey/sample those areas and materials. Cannot confirm, SDS does not qualify due to propriety ingredients.
Please confirm if any previous asbestos data that will be provided to the contractor can be utilized e.g. sample results, positive lab results of existing materials. Yes, vendor may have to set up data exchange site to place massive amount of electronic data.
The SOW mentions that the contractor to collect suspect materials for confirmatory laboratory analysis. Please confirm that the contractor only is required to survey and sample the materials not sampled in the previous reports. Any materials already sampled and documented in the previous survey reports, whether positive or negative, will not be required to be sampled again. Once positive always positive. Yes, only material not sampled in previous reports
Please provide a Not to Exceed number for samples for PLM analysis as without a number there will be wide disparity between the quotes provided by the contractors, and it will not be an equal comparison between the quotes. Sample analysis of PLM (up to 1,000) and TEM (Up to 285 TEM).
Please clarify if the labeling can be performed after the materials have been analyzed by the laboratory and positive materials identified. That will lead to 2 mobilizations and trips. Would need to be after results are analyzed and yes would be two trips.
Please clarify if one electronic copy of the report would be required to be submitted for all the buildings or does each building require an electronic report. The SOW mentions requirement of 1 electronic and 2 hard bound copies of the report. Please clarify that only one (1) hard copy of report is required of a building and a total of 2 hard copies of the report. Two hard copies of report which shall include building drawings. Two each
Please clarify if any draft copy is required by VA for review prior to finalizing the report. Also, please clarify that the survey report requirement of 1 electronic and 2 hard bound copies. Verified. However, facility would like to have meeting and work off paper copy with vendor to confirm report & drawings is what is needed.
Please confirm that the license cards and the asbestos hazard prevention plan mentioned in section 3 on page 3 can be provided to VA after the award but prior to the start of the work? It would be more up to date and concise plan as the contractor would have all pieces in place as the things might change during the time of submittal of proposal and field work due to the present conditions (Covid-19 etc.). We are going to want to start job quickly (like week or so) after award.so vendor will need to present SC DHEC license cards/certs prior to the award.
Please confirm that the kick-off meeting can be attended by the contractor via phone call, webex or zoom and is not required to be present physically. Microsoft Teams
Please remove the requirement for sampling roofing materials as the roofs are not sampled prior to the demolition of the building to ensure that the integrity of the roofing material is not compromised, and the warranty is not voided. The buildings can be demolished with the suspect roofing material as most state regulators consider roofing materials to be non-friable Category I materials that could be left in the building during demolition activities as the chances of the material becoming friable are minuscule. It can be removed.
Please confirm that the samples need to be only analyzed using the polarized light microscopy (PLM) and the no cost for point count analysis or TEM analysis should be considered during the cost preparation. We are going to need TEM confirmation but can use stop positive.
Please confirm that the labeling is only required for TSI and not for miscellaneous materials that may be present. Really can t label walls or flooring, so I would say TSI only at this time.
Please extend the proposal submittal date by at least one week as the responses to the queries may affect the final cost. Contracting Officer call
Update #1 ·
Solicitation: BASELINE ASBESTOS INSPECTION
Notice Type: Combined Synopsis/Solicitation
Contracting Office Address:
NCO 7 Contracting Office
Department of Veterans Affairs
Ralph H. Johnson VA Medical Center (RHJVAMC)
109 Bee St
Charleston, SC 29403-5799
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.
This solicitation is a Request for Quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-05 dated March 10, 2021.
This solicitation is 100% set-aside for SDVOSB. Only Department of Veterans Affairs Center for Veterans Enterprise (CVE) Vendor Information Pages (VIP) VetVipBiz verified SDVOSB firms are eligible to submit an offer or receive an award of a VA contract that is set-aside for SDVOSB in accordance with VAAR Part 819. A non-verified vendor that submits a bid or proposal will be considered non-responsive and ineligible for award as listing in VIP is not self-correctable as a minor informality as, for example, a listing in SAM. The VIP database will be checked both upon receipt of an offer and prior to award.
The associated North American Industrial Classification System (NAICS) code for this procurement is 541350; Building Inspection Services; Small Business Size Standards; $8 million. The FSC/PSC is H356
The Ralph H. Johnson VA Medical Center, 109 Bee Street, Charleston SC 29401 is seeking interested sources for Baseline Asbestos Inspection services for RHJVAMC Safety Department in accordance with attached Statement of Work (SOW). Offerors are therefore asked to complete PRICE/COST SCHEDULE-Item Information for each requisite item in their response, and to include a Grand Total for all items.
PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
1.00
EA
__________________
__________________
BASELINE ASBESTOS FACILITY INSPECTION TO INCLUDE BULK SAMPLING, ANALYSIS, SUMMARY REPORT (DRAWINGS/PHOTOS) AND LABELING POSTITVE ACM.
Contract Period: Base
POP Begin: 06-15-2021
POP End: 09-30-2021
GRAND TOTAL
__________________
Period of Performance:
The estimated Period of Performance is June 15, 2021 September 30, 2021.
Place of Performance/Place of Delivery:
The Ralph H. Johnson VA Medical Center, 109 Bee Street, Charleston SC 29403.
Award shall be made to the quoter whose quotation offers the best value to the government, considering technical capability, and price. The government will evaluate information based on the following evaluation criteria: (1) technical capability factor meeting the requirement, and (2) price. Nonprice factors will be rated on an Acceptable/Unacceptable basis. Failure to meet any of the requirements will result in a Unacceptable rating and eliminate the offeror from further consideration for contract award. To be eligible for award, an offer must be rated no less than acceptable in the non-price factors. To be considered technically acceptable for award each offeror must provide with their submitted quote/offer:
Technical Capabilities: Offeror will describe and provide information on their company s ability to provide the required supply.
Price: Offeror shall complete the Price/Cost Schedule-Item Information with offerors
proposed contract line item prices inserted in appropriate spaces. The Government will
evaluate offers for award purposes by adding the total of all Line Item prices to ensure that pricing is complete. Price will be evaluated for fair and reasonableness in accordance with FAR 12.209. Pricing should be considered FOB DESTINATION and MUST be good for 30 calendar days after close of solicitation.
(End of Evaluation Criteria)
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
FAR 52.212-1, Instructions to Offerors Commercial Items (JUNE 2020)
FAR 52.212-3, Offerors Representations and Certifications Commercial Items (NOV 2020)
Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required.
The following contract clauses apply to this acquisition:
FAR 52.212-4, Contract Terms and Conditions Commercial Items (OCT 2018)
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
52.204-18, 52.217-8, 52.217-9, VAAR 852.203-70, VAAR 852.219-10, VAAR 852.232-72 and VAAR 852.237-70.
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders (NOV 2020)
The subparagraphs of FAR 52.212-5 are applicable, 52.204 10, 52.209-6, 52.219-6, 52.219-27, 52.219-28, 52.219-28, 52.222-3, 52.222-26, 52.222.35, 52.222-36, 52.222-37, 52.222-41, 2.222-42, 52.222-43, 52.222-55, 52.223-18, 52.225-1, 52.225-13, 52.232-33, and 52.232-34.
The Defense Priorities and Allocations System (DPAS) is not applicable to this acquisition.
Award will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.
The award will be made to the response most advantageous to the Government.
Responses should contain your best terms, conditions.
To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:
"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."
OR
"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"
Quoters shall list exception(s) and rationale for the exception(s), if any.
All quoters shall submit the following: Submitted offers shall not exceed 25 single-sided pages and any pages beyond this amount will be removed and not evaluated. Files should be sent in PDF format and no larger than 10MB or they may be automatically rejected by the server. The Government is not responsible for rejected e-mails that exceed the e-mail capacity.
All quotes shall be submitted via email ONLY to the Contract Specialist (CS), Moses Deng at moses.deng2@va.gov no later than 2:00 PM EST on June 2, 2021. All quotes/offers submitted must include the Solicitation# 36C24721Q0739 and Baseline Asbestos Inspection in the subject line of the email. Hand deliveries or facsimile will not be accepted, telephone responses will NOT be accepted. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).
Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail ONLY no later than May 31, 2021 at 2:00 pm (EST) to Moses Deng, Contract Specialist (CS) at moses.deng2@va.gov. No questions received after this date will be answered. Telephone or faxed questions will not be answered. ONLY ELECTRONIC MAIL (EMAIL) QUESTIONS WILL BE ANSWERED. The solicitation number must be identified on all submitted questions. Statements expressing opinions, sentiments, or conjectures are not considered valid inquiries and will not receive a response.
Point of Contact:
Moses Deng
Contract Specialist, NCO 7
Contracting Office,
Ralph H Johnson VA Medical Center
Department of Veterans Affairs
109 Bee Street
Charleston, SC 29403-5799
Moses.deng2@va.gov
Attachments
| File | Type | Posted |
|---|---|---|
| 36C24721Q0739_3.docx | DOCX document | |
| STATEMENT OF WORK.pdf | ||
| 36C24721Q0739_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| H356-- BASELINE ASBESTOS INSPECTION Government Response to Vendors Questions and Answers Quotes submission is extended to 06/04/2021 at 2:00 PM EST. Responders must provide written acknowlegemet of Amendedment | Solicitation | |
| H356-- Baseline Asbestos Inspection | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity